corporate presentation - sarama€¦ · 2 •two project areas geologically and strategically well...

23
SEPTEMBER 2019 CORPORATE PRESENTATION

Upload: others

Post on 19-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

SEPTEMBER 2019CORPORATE PRESENTATION

Page 2: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

1

FORWARD LOOKING STATEMENTS

Information in this presentation that is not a statement of historical fact constitutes forward-looking information. Such forward-looking information includes statements withrespect to the exploration and development of properties in which we have interests, mineral resource estimates at South Houndé Project, Bondi Deposit and Karankasso Project(Joint Venture with SEMAFO Inc.), the potential for open pit mining at the properties and the potential for extensions of existing discoveries at the properties.

Actual results, performance or achievements of the Company may vary from the results suggested by such forward-looking information due to known and unknown risks,uncertainties and other factors, many of which are beyond our control. Such factors include, among others, that the business of exploration for gold and other precious mineralsinvolves a high degree of risk and is highly speculative in nature; The transaction with Acacia Mining in respect of the South Houndé Project has not yet closed; mineral resourcesare not mineral reserves, do not have demonstrated economic viability, and there is no certainty that mineral resources can be upgraded to mineral reserves through continuedexploration; few properties that are explored are ultimately developed into producing mines; geological factors; the actual results of current and future exploration; changes inproject parameters as plans continue to be evaluated, as well as those factors disclosed in our publicly filed documents, including under the heading “Risk Factors” in theCompany’s management discussion and analysis for the interim period ended June 30, 2019.

There can be no assurance that any mineralisation that is discovered will be proven to be economic, or that future required regulatory, licensing or approvals will be obtained.However, management believes that the assumptions and expectations reflected in the forward-looking information are reasonable. In order to provide such forward-lookinginformation, management has made assumptions regarding, among other things, the Company’s ability to carry on its exploration activities, that the Company will be able toconvert inferred mineral resources into higher confidence categories of mineral resources and into mineral reserves, that its financial resources will be sufficient to fund itscurrently planned programs and that the Company will be able to obtain further financing as and when required and on reasonable terms, the timely receipt of requiredapprovals, the price of gold and other precious metals, that the Company will not be affected by adverse political events, and that the Company will be able to operate in a safe,efficient and effective manner. The Djarkadougou, Bamako and Bouni Exploration Permits are going through a process with the government of Burkina Faso where it is requiredthey be reissued as a new full-term exploration permit. The Company anticipates this to be completed in due course, though there can be no assurance that the process will besuccessfully completed on a timely basis, or at all.

Readers should not place undue reliance on forward-looking information. Sarama does not undertake to update any forward-looking information, except as required by applicablelaws.

Page 3: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

2

• Two project areas geologically and strategically well positioned in southwest Burkina Faso

• Primary focus is the Southern Houndé Belt Project Area:

▪ Hosts the 2.1Moz1 Au*(Inf) South Houndé Project and the Bondi Deposit

▪ Scope for a near-term, low capex & high return oxide heap-leach mine development

▪ Aim to increase oxide and free-milling resource inventory to support a staged-development producing 90-100koz per year & providing sound returns at $1,200/oz Au

• Southern Houndé regional dynamic has changed substantially with SEMAFO acquisition of Savary and exit of Acacia

• SEMAFO and Teranga regional development plans underscore the importance & value of Sarama’s regional position

• Second, early stage growth project in neighbouring Banfora Belt

• Silver Lake Resources, a mid-tier ASX listed gold producer has become a cornerstone shareholder

Sarama Resources Investment Highlights

1. Refer to slide titled “Additional Technical Details” * Upon closing Acacia Mining deal and reissue of Djarkadougou permit

Page 4: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

Management And Capital Structure

TSX-V: SWA

Common Shares 250,659,987

Warrants 8,500,000

Options 17,020,000

Andrew Dinning Chairman & CEO

Sean Harvey Non Executive Director

Simon Jackson Non Executive Director

Dave Groves Non Executive Director

Key Managment

Jack Hamilton VP Exploration

Paul Schmiede VP Corp. Development

Lui Evangelista Chief Financial Officer

Page 5: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

4

Burkina Faso – A Prolific Gold Producer

• 12 gold mines in operation or under development

• Large, high quality holdings are scarce

• Southern Hounde area is very active with Endeavour, Teranga and SEMAFO all making major recent discoveries

• Banfora Belt very underexplored and ripe with opportunity

• Next-Generation mines will come from:

→ Brownfields exploration e.g. Endeavour Kari Pump

→ A new set of eyes across old deposits & different approach

→ New discoveries in underexplored areas like the Banfora Belt

→ Consolidation to achieve critical mass

• Sarama’s assets provide multi-project exposure

SEMAFO

Roxgold

Endeavour

Teranga

SEMAFOSarama JV

Sarama

SaramaTeranga

Page 6: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

5

Multi-Project Exposure In Burkina Faso

Southern Houndé Belt Development Area

100% owned

1,300km2

2.1Moz Au Inf. Resource

Historic resource on Bondi Deposit

Visibility to mine production

Active exploration aims to grow resource to 3-3.5Moz*

Koumandara Project

100% owned

600km2

+100km gold-in soil trends

High tenor with 10 g/t Au in drilling & 4 g/t Au-in-soil

80km west of South Houndé Project

Active exploration and amalgamation

Development Project Growth Project

* The potential quantity is conceptual in nature and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The potential quantity is based on extrapolation of historical exploration results and related geological setting.

Page 7: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

6

Southern Houndé Area Development Potential

SARAMA RESOURCES LIMITED

Simple, Oxide-Focussed Heap Leach Development

Potential To Minimise Start-Up Capex

Satellite Ore Trucked To A Central Processing Facility

Anticipate Sound Economics At $1,200/oz Au

Staged Oxide & Fresh Development

Higher Au Recovery Than Heap Leach

Phased Capex

Development To Be Economic @ US$1,200/oz Au

Near-Field Resource Growth

Heap LeachHigh-Grade

Oxide

Preferred Start-Up

+500koz

Development Base Case Concept

Two-Stage CILOxide & Free-Milling Fresh

Page 8: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

7

• Concept work indicates scope for a high-grade, high-return, simple, oxide-focussed development trucking satellite ore to a central processing facility

• Ore feed sourced from South Houndé oxide/transition plus ThreeBee Project

• Anticipate resource to reserve conversion of 60-70% @$1,200/oz Au

• Key oxide performance metrics South Houndé Project1

✓ CIL recovery 95%

✓ Rapid leach kinetics with +90% recovery in 2 hours in agitated leach

✓ 87% recovery in column leach

✓ Nominal 4:1 strip ratio

• Key performance metrics Bondi Deposit1

✓ Free milling oxide & fresh with CIL recovery of 93-96%

✓ High grade ROM feed ~3g/t Au both oxide and fresh

✓ Nominal 6:1 strip ratio to mine oxide and fresh

Southern Houndé Area Development Base Case

1. Refer to slide titled “Additional Technical Details”

Page 9: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

8

Multi-Staged Development Concept

• Resource growth goal:1.7-1.9Moz* Au oxide & Free Milling

• Technical Studies & Infill Drilling

Resource Development& Project Sizing

Stage 1: Oxide Construction & Start-up Oxide Material

Install Hard Rock

Circuit

Stage 2: Fresh Hard Rock Transition

Fresh Material

7 years 4 years

Stage 1 Stage 2

BASE CASE

MODEST RESOURCE GROWTH 0.5-0.7Moz* Au

* The potential quantity is conceptual in nature and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The potential quantity is based on extrapolation of historical exploration results and related geological setting.

Page 10: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

9

Near-Field Oxide & Free-Milling Resource Growth

South Hounde 0.7-0.9Moz Bondi 0.5-0.7Moz

Resource Goal 1.7-1.9Moz*

SARAMA RESOURCES LIMITED

Resource Infill: South Hounde & Bondi

High Probability: Resource Extensions and additions at South Hounde & Bondi

Prospects: Zanawa, Ouangoro Corridor

Targets: Bamako, Botoro, Eastern Djarkadougou, NE South HoundeProject, Eastern South Hounde Project

Prospects 0.2-0.3MozTargets 0.2-0.3Moz

* The potential quantity is conceptual in nature and there has been insufficient exploration to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. The potential quantity is based on extrapolation of historical exploration results and related geological setting.

Page 11: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

Southern Houndé Area Resource Growth

• 1,300km2, 100% owned* and well positioned geologically

• Scope for material increase in oxides and free milling fresh material

• Exploration efforts targeting:

▪ Extensional and additive work on South Houndé Project

▪ Extensional and additive work at the Bondi Deposit & ZanawaProspect

▪ Follow up of historical high-grade intersections on Bamako Property

• Re-targeting on Djarkadougou has generated new discoveries

• Bamako is a high-grade, stacked gold-quartz vein system

• Area continues to yield new discoveries including Bantou Nord and Golden Hill

* Upon closing Acacia Mining deal and reissue of Djarkadougou permit

Page 12: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

Resource Growth – South Houndé Project

• Additive & extensional drilling in main corridor anticipated to add to oxide resource

• Recent drilling has extended strike length of main mineralisation by 20% to 12km

• Flat structures identified in several areas will have a positive impact on development

• Eastern corridor of project has scope to deliver incremental ounces

• Free milling fresh in main corridor requires follow up

Page 13: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

Resource Growth - ThreeBee Project

• Covers 660km2, 100% owned & well positioned geologically

• Hosts the Bondi Deposit, Zanawa Prospect and historical high-grade drill results at Bamako

• Bondi Deposit remains open in several directions

• Initial testing of depth and strike extensions on the Bondi Deposit has yielded encouraging results including:

✓ Strike extensions on SE splay off the mineral resource

✓ Depth extensions to the southern portion of resource zone

✓ High grade intercepts including 3m @ 19.9g/t Au (EOH)

• Bamako gold-quartz vein system is up to 3km in length and exploration has repeatedly returned high gold grades including:

✓ Gold-in-soils up to 13.6g/t Au

✓ Rock chips up to 18.9g/t Au

✓ Historical scout drilling intercept of 15.0m @ 6.17g/t Au

Page 14: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

13

Resource Growth – Zanawa Prospect

• New discovery situated 4km NE of Bondi Deposit

• Scout AC & RC drill program yielded encouraging near–surface results including:

• 22m @ 3.85g/t Au from 5m

• 29m @ 1.44g/t Au from 1m

• 5m @ 4.54g/t Au from 15m

• Mineralisation extends >1km strike

• Proximal to volcanic-intrusive contact

• Silica-pyrite-sericite-albite alteration present

• Additional geochemical and geophysical target zone 2km N-NE from Zanawa remains untested

Page 15: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

14

Near Term Project Road Map

High probability extensional & additive exploration

Value-Add met testwork

Mining assessments

Modular plant OoM assessment

High probability

exploration & technical

support work

Current Status

Mineral Resource & Inventory

update

Internal Options Study

PEA Infill Drilling & PFS

Assess heap leach, CIL stick build, CIL modular

Optimise throughput/sizing

Assess fit with stage two sulphide concept

Assess fit with rising gold price

Amalgamation of South Hounde and ThreeBee Project mineral resources

Roll Option Study into PEA

Frame up preferred development option

Complete any outstanding technical support work

Complete infill drill program

Build geo-metallurgical model

Complete PFS

Scope for low capex project development

Project mineral inventory requires upgrade & buffer

Page 16: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

15

Exploration Optionality – Koumandara Project

• 602km², 100% owned early stage exploration project

• Good access to infrastructure – Bobo & power grid within 30km

• Gold mineralised corridor overlies a 45km-long section of a district-scale litho-structural break

• High grades encountered in reconnaissance work including 10g/t Au in RC and Auger drilling & 2.6g/t Au-in-soil

• Geological characteristics similar to those associated with gold in the Houndé belt

• Anomalism is coincident with:

✓ Regional break with cohesive & high-tenor Au-in-soil & auger anomalies

✓ Major structural features and contrasting volcano-sedimentary lithologies with late-stage intrusions

✓ Major artisanal mining centres90km

Bondi

Houndé

Mana

Yaramoko

Sth Houndé

Koumandara

Koumandara

Page 17: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

16

Compelling Value In Multiple Areas

1. For further details refer to slides titled “Additional Technical Details”

1. Multi-Million Ounce Resource

+2Moz1 Au and continuing to grow

2. Development Potential

Development back-stopped by heap leach with potential for a multi-stage development

3. Exploration Potential

Two large project areas both with exploration upside

4. Strategic Positioning

Size of location of land position is difficult to replicate

5. Consolidation Value

Consolidation & addition to holdings adding real value

* Semafo & Savary deal next step in regional consolidation

Page 18: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

17

✓ Regaining 100% control of and recasting the 2.1Moz Au South Houndé Project

▪ Management can now lay out a plan to take the assets toward development

▪ Visibility to oxide-centric or a multi-stage development providing sound returns @ $1,200/oz Au

✓ Regional dynamic has changed significantly

▪ Sarama’s JV partner acquired by SEMAFO for C$45/oz Au in April 2019

▪ Significant activity in the region with Sarama, SEMAFO, Teranga & Endeavour all pursuing big plans

▪ SEMAFO & Teranga have stated ambitious mine development plans adjacent to Sarama’s projects

✓ Gold Price - Sarama’s resource base is levered to gold price and comes into play above $1,500/oz Au

✓ Australian intermediate gold producer has taken major equity interest in & is supporting the Company

Recent Changes Having A Positive Impact On Sarama

Page 19: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

18

• Two project areas that are geologically and strategically well positioned in southwest Burkina Faso

• Primary focus is the Southern Houndé Belt Project Area which:

▪ Hosts the 2.1Moz1 Au South Houndé Project and a sizeable historical resource at the Bondi Deposit

▪ Scope for a near-term, low capex & high return oxide heap-leach mine development

▪ A modest addition to the resource will allow multi-stage development to be considered

• Southern Houndé regional dynamic has changed substantially with SEMAFO acquisition of Savary & Acacia Exit

• SEMAFO & Teranga regional development plans underscore importance & value of Sarama’s regional position

• Second, early stage growth project in neighbouring Banfora Belt

• Silver Lake Resources, a mid-tier ASX listed gold producer has become a cornerstone shareholder

Company’s EV unmoved despite a raft of positive developments and presents a mis-priced opportunity

Summary

1. Refer to slide titled “Additional Technical Details” * Upon closing Acacia Mining deal and reissue of Djarkadougou permit

Page 20: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

THANK YOU

Page 21: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

20

Additional Technical DetailsMINERAL RESOURCE DETAILS

1. 43.0 Mt @ 1.5 g/t Au (reported above cut-off grades ranging 0.3-2.2 g/t Au, reflecting the mining methods and processing flowsheets assumed to assess the likelihood of the inferred mineral resources having reasonable prospects for eventual economic extraction).

The effective date of the Company’s mineral resource estimate for the South Houndé Property is February 4, 2016.

For further information regarding the mineral resource estimate please refer to the technical report titled “NI 43-101 Independent Technical Report South Houndé Project Update, Bougouriba and IobaProvinces, Burkina Faso”, dated March 31, 2016. The technical report is available under Sarama Resources Ltd.’s profile on SEDAR at www.sedar.com

2. 12.3 Mt @ 2.03 g/t Au (at a 0.5 g/t Au cut-off)

The effective date of the most recent Karankasso Project JV mineral resource estimate is October 5, 2017, no Technical report was filed as the change in Mineral Resource was deemed immaterial.

For further information regarding the mineral resource estimate please refer to the technical report titled “Technical Report and Resource Estimate on the Karankasso Project, Burkina Faso”, dated October 7, 2015. The technical report is available under SEMAFO Inc’s profile on SEDAR at www.sedar.com.

Sarama has not independently verified SEMAFO’s mineral resource estimate and takes no responsibility for its accuracy. SEMAFO is the operator of the Karankasso Project JV and Sarama is relying on their Qualified Persons’ assurance of the validity of the mineral resource estimate. Additional technical work has been undertaken on the Karankasso Project since the Effective Date, including but not limited to, metallurgical testwork, exploration drilling and mineral resource estimation, but Sarama is not in a position to quantify the impact of this additional work on the mineral resource estimate referred to above.

3. Bondi Deposit - 4.1Mt @ 2.1g/t Au for 282,000 oz Au (measured and indicated) and 2.5Mt @ 1.8g/t Au for 149,700 oz Au (inferred), reported at a 0.5 g/t Au cut-off

The historical estimate of the Bondi Deposit reflects a mineral resource estimate compiled by Orezone Gold Corporation ("Orezone") which has an effective date of February 20, 2009. The historical estimate is contained in a technical report titled "Technical Report on the Mineral Resource of the Bondigui Gold Project", dated February 20, 2009 (the "Bondi Technical Report") and is available under the profile of Orezone on SEDAR at www.sedar.com.

Sarama believes that the historical estimate is relevant to investors' understanding of the property, as it reflects the most recent technical work undertaken in respect of the Bondi Deposit.

The historical estimate was informed by 886 drillholes, assayed for gold by cyanidation methods, were used to interpret mineralised envelopes and geological zones over the area of the historical estimate. Gold grade interpolation was undertaken using ID² methodology based on input parameters derived from geostatistical and geological analyses assessments. Field measurements and geological logging of drillholes were used to determine weathering boundaries and bulk densities for modelled blocks.

The historical estimate uses the mineral resource reporting categories required under National Instrument 43-101.

No more recent estimates of the mineral resource or other data are available.

Sarama is currently undertaking necessary verification work in the field and on desktop that may support future reclassification of the historical estimate to a mineral resource.

A qualified person engaged by Sarama has not undertaken sufficient work to verify the historical estimate as a current mineral resource and Sarama is therefore not treating the historical estimate as a current mineral resource.

Page 22: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

21

Additional Technical Details

QUALIFIED PERSON’S STATEMENT

1. Scientific or technical information in this presentation that relates to the preparation of the Company’s mineral resource estimate is based on information compiled or approved by Adrian Shepherd. Adrian Shepherd is an employee of Cube Consulting Pty Ltd and is considered to be independent of Sarama Resources Ltd. Adrian Shepherd is a Chartered Professional Member in good standing of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Adrian Shepherd consents to the inclusion in this news release of the information, in the form and context in which it appears.

2. Scientific or technical information in this disclosure that relates to the quotation of the Karankasso Project’s mineral resource estimate is based on information compiled by Paul Schmiede. Paul Schmiede is an employee of Sarama Resources Ltd and is a Fellow in good standing of the Australasian Institute of Mining and Metallurgy. Paul Schmiede has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Paul Schmiede consents to the inclusion in this disclosure of the information, in the form and context in which it appears. Paul Schmiede and Sarama have not independently verified SEMAFO’s mineral resource estimate and take no responsibility for its accuracy

3. Scientific or technical information in this presentation, in respect of the Bondi Deposit relating to mineral resource and exploration information drawn from the Technical Report prepared for Orezone on that deposit has been approved by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources Ltd and is a member in good standing of the Ordre des Géologues du Québec and has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Guy Scherrer consents to the inclusion in this report of the information, in the form and context in which it appears.

4. Scientific or technical information in this presentation that relates to the Company's exploration activities in Burkina Faso is based on information compiled or approved by Guy Scherrer. Guy Scherrer is an employee of Sarama Resources Ltd and is a member in good standing of the Ordre des Géologues du Québec and has sufficient experience which is relevant to the commodity, style of mineralisation under consideration and activity which he is undertaking to qualify as a Qualified Person under National Instrument 43-101. Guy Scherrer consents to the inclusion in this presentation the information, in the form and context in which it appears.

Page 23: CORPORATE PRESENTATION - Sarama€¦ · 2 •Two project areas geologically and strategically well positioned in southwest Burkina Faso •Primary focus is the Southern Houndé Belt

22

Project And Attributable Mineral Resources1

SOUTH HOUNDÉ PROJECT (100%*) (INFERRED) Mt Au g/t Koz Au Att. Koz Au Au cut-off

Oxide and Transition 16.0 1.2 611 611 0.3 - 0.8g/t

Fresh 25.0 1.9 1,487 1,487 0.8 - 2.2g/t

Total 41.0 1.5 2,098 2,098

KARANKASSO PROJECT (22%) (INFERRED)

Total 12.3 2.03 805 177 0.5g/t

BONDI DEPOSIT HISTORICAL RESOURCE (100%)

Measured & Indicated 4.1 2.1 282 282 0.5g/t

Inferred 2.5 1.8 150 150 0.5g/t

1. For further details refer to slides titled “Additional Technical Details”* Upon closing Acacia Mining deal