CORPORATE PROFILE
ÇALIK ENERJİ SAN. VE TİC. A.Ş.Büyükdere Caddesi Nr: 163 34394 Zincirlikuyu, Istanbul, TurkeyTel: (00 90) 212 306 50 00-97Fax: (00 90) 212 306 29 66www.calikenerji.com
OPERATIONAL EXCELLENCE...
Contents
In Brief
Engineering & Construction
Power Systems
Oil & Gas
1
Çalık EnErjİ, onE of TurkEy’s hıghly moTıvaTEd and fasTEsT growıng EnErgy companıEs,
ıs offErıng compETEnT Epc, EnErgy gEnEraTıon & dısTrıbuTıon, oıl and gas procEssıng, TransporT and
markETıng soluTıons worldwıdE.
2012 marked an outstanding year in Çalik enerjİ’s growing performance.
ThE company complETEd ıTs mosT ExTEnsıvE projEcT - ThE navoı ccpp ın uzbEkısTan and ıs consTrucTıng Two
major powEr planTs ın ıraq and sıgnEd onE conTracT for gardabanı ccpp ın gEorgıa and onE conTracT for ElEcTrıcıTy dısTrıbuTıon projEcT ın TurkmEnısTan.
with an excellent track record of completed
projects, the company is known as a reliable partner within the international energy sector.
wıTh clEar, wEll sTaTEd dEvElopmEnT sTraTEgıEs, placıng
hıgh valuE on a crEaTıvE and proacTıvE busınEss approach Çalık EnErjı conTınuEs ıTs sTEady growTh addıng valuE To
ıTs parTnErs and sharEholdErs.
in 2011, Çalik enerji was ranked as the world’s 129th largest international contractor by enr.
1
2
IN BRIEF
ÇALIK ENERJİ CORPORATE PROFILE
ÇALIK ENERJİ HIGHLIGHTS
» Established in 1998 » Headquartered in Ankara-Turkey » Wholly-owned by Çalık Holding » Branch offices in Iraq and Turkmenistan, Uzbekistan, Georgia » Liaison offices in Dubai, Moscow, Albania » 500+ experienced core staff » Ranked world’s 129th largest International Contractor by ENR.
Key Indicators (US$ thousands) 2012 (US$ thousands)
Total Revenues 1,387,894
OPERATING Profit 107,256
EBITDA 128,315
Number of Employees 4,431
(Including YEDAŞ and country/site organisations)
Integrated value chain capabilities in the fields of utilities, power and oil.
3BuSINESS uNITS AS INvESToR ANd SERvIcE PRovIdER
As of 31 December 2012, the total assets of Çalık Enerji were US$ 1,265.4 million, and for the year ending 31 December 2012 sales were US$ 1,387.9 million, operating profit was US$ 107.3 million, and EBITDA was US$ 128.3 million.
Upstream Midstream Downstream
Power Systems Utilities
Çalık Enerji A.Ş. Consolidated Total Revenues (US$ thousands)
1,136,4511,387,894
461,466
319,342
386,893
85,653
666,054
385,197
528,267
52,776
2011
2012
2010
2009
2008
2007
2006
2005
2004
2003
Considering the potential for growth both in Turkey and its immediate neighborhood, Çalık Enerji is positioning to capture investment opportunities and to provide engineering, procurement and
contracting services to energy infrastructure markets.
4
IN BRIEF
ÇALIK ENERJİ CORPORATE PROFILE
ÇALIK ENERJİ STRATEGY
Capacity Building• Organization & Systems Development• Reinvestment of surplus cashflow
Service Business
Asset Ownership Capacity
Building
Asset Growth
•Focus on growing presence in EPC and distribution in the region •Expanding across the electricity value chain through development of own power generation portfolio
5
Power Systems Strategy In the area of power distribution and generation to build on existing expertise and the expansion of the Turkish electricity market, privatization of state owned distribution channels and liberalization of the electricity generating sector.
EPC StrategyReinforce existing operating capability in engineering, procurement and construction projects to achieve operating capability in engineering, procurement and construction projects with a sustainable backlog greater than US$ 1.5 billion.
Oil & Gas Strategyis to gain access to exploration and production rights in Turkey and near abroad at low cost. In the longer term monetize assets after the initial exploitation of reserves, while retaining a stake in proportion to capital allocation targets.
Development•2000 MW generation
Operations Upstream• 15 active license•Operations in 2
countries
Development•Mid & Downstream
Licenses secured for 10 mtpa refining & 50 mtpa
pipeline operations
Çalık enerji’s strategy is to harness the synergies that exist between its distribution and power generation sector, EPC activities and oil & gas exploration and production business to exploit the potential opportunities afforded by increasing demands for energy, combined with the increasing liberalization of the energy sector. Çalık Enerji is engaged in the development of requisite energy infrastructure, in the areas of power generation and petroleum refining, pipeline transportation.
EPC•Projects completed
USD 0.6 billion •Ongoing work USD 0.8 billion
•Backlog USD 1.0 billion•Tender pipeline
US$ 3.5 billion
Operations•4.5 TWH/yr distribution
operational • 110 Million
KWh/yr generation under construction
Current activities: Current activities: Current activities:
1 Status 31.12.2012
6
IN BRIEF
ÇALIK ENERJİ CORPORATE PROFILE
Targeting long-term growth portfolio…
ÇALIK ENERJİ ouTLooK
7
PErfOrmanCE fOCuS
In the near-term, we are emphasizing
performance focus. This means that we
work on continuous improvements in
operating performance, with an emphasis
on execution capability in Engineering,
Procurement and Construction of power
generation plants. We have initiatives
underway that increase our order book
to sustainable levels. We complement
our execution capability through joint
ventures with parties selected for their
complementary capability. This allows us
to secure a bigger market share of new
power generation developments in Central
Asian and Middle Easter markets. We
expand the EPC service offering to the Oil
and Gas Sector based on the extrapolation
of capability acquired in the EPC business
for power generation. Margin performance
is supported by improvements in operating
capability thereby offsetting margin
erosion stemming from competition.
GrOwth fOCuS
Acquisition capital of US$ 441 million was
already committed for the acquisition
of YEDAŞ interms of the privatization
process. Further growth in distribution
by acquisition is considered for the near
to medium-term because the successful
integration of YEDAŞ into the operating
structure of Çalık Enerji has demonstrated
the value of this business strategy.
Organic capital investment is planned
for power generation projects and the
ongoing focus on the further exploration
and appraisal of already secured upstream
licenses. Power generation growth will be in
carefully selected renewable and thermal
power generation projects which in totality
provide for a robust portfolio approach to
management of risk and reward.
Upstream license commitments dictate
Çalık Enerji’s oil and gas operating activity
for the period 2013- 2015. Selectively, new
access to new licenses will be sought of
their potential leads to an improvement in
the overall portfolio potential.
FocuS oN dELIvERYnEar-TErm pErformancE focus,
mEdıum-TErm focus on sharEholdEr valuE growTh &long-TErm focus on maTurıng nExT-gEnEraTıon projEcTs.
Maturing Next-Generation Projects
Çalık Enerji has built a portfolio of
options which will underpin the long-
term sustainable growth of the business.
Besides the Samsun-Ceyhan Crude Oil
Pipeline Project and the Adana East
Mediterranean Refinery Project, there are
further power generation projects and two
overseas oil & gas exploration targets in
our long-term growth portfolio. Market
conditions permitting these long-term
options will be realized with shareholding
levels adjusted in line with capital
allocation priorities and operational
synergies realized across the expertise
spectrum of Çalık Enerji.
In 2013 Çalık Enerji will complete
the acquisition of 2 new distribution
companies and commerce business
operations: ARAS EDAŞ in Turkey, and
KOSOVO Electricity Distribution Company
in Kosovo. The privatization tenders for
both were won by Çalık, in the previous
year, in the case of KOSOVO in partnership
with Limak.
8 9
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
ENGINEERING, PRocuREMENT & coNSTRucTIoN
what wE DO…
• Customer acquisition & liaison
• Proposal management
• Project management
Çalık Enerji’s experience in efficient project execution is a guarantee for completion of projects on time, and on budget, in accordance with the best practices in HSE.
ExCEllEnCE
in COntraCtinG
Man
agementEngineering
ProcurementConstruc
tion
8
Management
ÇALIK ENERJİ CORPORATE PROFILE
8 9Çalık EnErjı ıs commıTTEd To provıdE ThE mosT EffEcTıvE sErvıcEs
EvEN IN THE MoST dIFFIcuLT BuSINESS ENvIRoNMENTS.
• Power systems (simple cycle; combined cycle; hydro; transmission)
• Pre-engineering (power systems distribution)
• Detailed design & engineering management (power systems)
• Licensed units (turbines, steam generators)
• Non-licensed units
• Global procurement
• Construction management (power systems, oil & gas)
• New built projects
• Expansion projects
BuSinESS mODEl
Project management
Engineer Procure Construct Commission Operate Maintain
9
Engineering Procurement Construction
10 11
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
Power Plants (Thermal and Gas Fired)
Oil & Gas field Development Projects (Processing Facilities)
Oil & Gas Storage and transmission Projects (Pipelines, Pump Stations, Compressor Stations, Storage Facilities)
BUSINESS LINES
10 11STRATEGIC MARKETS
• Turkey • Turkmenistan• Georgia• Uzbekistan• Iraq
• Russia• Kazakhstan• Libya• Algeria• Nigeria• Albania
• Tunisia• Saudi
Arabia• United Arab
Emirates• Kuwait
Corporate Center
Existing Markets
Future Markets
Corporate CenterExisting MarketsFuture Markets
libya
turKEY
iraq
uzbekistan
turkmenistanGeorgia
russia Kazakhstan
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
ouR vISIoN FoR THE FuTuRE… EXPANd INTo EPc FoR oIL & GAS
EPC Power Systems+EPC Oil & Gas
EPC Power Systems+Oil & Gas
Building on established logistical and in-country operations capability in Central Asia, Iraq & Georgia
EPC Power Systems
TODAy TOMORROW
Building on existing capability and adding new capability
Customers: National & Municipal power generators and distributors
Customers: National & private sector oil & gas producers
12
Al-Khairat Power Plant 1250 MW, Iraq, March 2013
13
14 15
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
EPc SERvIcES – ouR oPERATING PoLIcY
GrowthOur goal is to grow our customer base, service offerings and geographic markets, always in harmony with offering value to the customer.
Quality And Management Systems•DynamicOrganization•CompetitiveModel•OperationalFlexibility•CustomerSatisfaction•ContinuingGrowth•Sustainability
Operational ExcellenceMonitoring of schedule, budget, quality, equipment to spot potential problems. Focus on liaison with customer throughout entire project implementation time.
Experienced WorkforceExperienced employees - mix of in-house and externally trained staff all from world renowned Turkish contracting background. We strive for best practice implementation.
Pre Job PoliciesEfficient communication with customer during design, work planning & permitting process; continuity of technical staff to avoid repetition and save customers time.
Startup FlexibilitiesDevelop best place for job execution to maximize personnel & equipment performance. Key staff on site to improve quality of job execution. Full co-ordination between site and in head office. Technical staff to avoid repetition and save customers time.
Geographically focused with global logistical & in-country service capabilities. Established markets: Turkmenistan, Uzbekistan, Iraq, Georgia.
ÇALIK ENERJİ CORPORATE PROFILE
14 15Çalık EnErjİ bElıEvEs ın ThE commıTmEnT To pEoplE,
qualıTy and ThE EnvıronmEnT
16 17
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
ouR HSE coMMITMENT
• We are committed to reach top quartile HSE performance as measured by the global engineering contracting sector.
• We are committed to create a work environment on site in which:- Zero accidents;- Incidents are reported even if they are minor;- A safe workplace is ensured;- All employees receive safety training. • We are striving to create a culture in which everybody realizes that:- Safety is his or her responsibility;- An injury incident is not a statistic but a person who was negatively affected by our
organizational system to which we all contribute.
Dr. Saim Dinç General Manager
ÇALIK ENERJİ CORPORATE PROFILE
16
16 17PRoJEcTS AT oNE GLANcE
Project Detail Capacity Duration Status
Turkmenistan Turkmenbashi Refinery Power Plant 126,4 MW 2001 2003 Completed
Turkmenistan Abadan Power Plant 123,6 MW 2002 2003 Completed
Turkmenistan Balkanabat Power Plant 126,4 MW 2002 2003 Completed
Balkanabad 220/110 kV Switchyard 2003 Completed
Turkmenistan Ashgabat Power Plant 254 MW 2004 2006 Completed
Turkmenistan Dashoguz Power Plant 254 MW 2006 2007 Completed
Amuderya HV Power Transmission/Distribution 2007 Completed
Dashoguz 110 kV Switchyard 2007 Completed
Turkmenistan Balkanabat Power Plant II 254 MW 2008 2010 Completed
Turkmenistan Ashgabat Electricity Distribution 2012 2015 Ongoing
Project Detail Capacity Duration Status
Uzbekistan Navoi Combined Cycle Power Plant 478 MW 2009 2012 Delivered
Iraq Al Khairat Simple Cycle Power Plant 1,250 MW 2011 2013 On Going
Iraq Nainawa Simple Cycle Power Plant 750 MW 2011 2013 On Going
Georgia, Gardabani Combined Cycle Power Plant 230 MW 2012 2014 Started
18 19
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
coMPLETEd PRoJEcTS (TuRKMENISTAN)
complETEd projEcTs
Turkmenbashi rafinery power plant
Capacity 126.4 MWEquipment Spec. Simple Cycle, 3 X GE-PG6581 (Frame6B)Duration for EPC/Warranty 14 months / 12 monthsVoltage Level 35 KV and 110 KVDelivery Date February 2003Employer Ministry of Petroleum and Natural Gas, TurkmenistanScope LSTK-EPC, Prime Contractor
balkanabat power plant
Capacity 126.4 MWEquipment Spec. Simple Cycle, 3 x GE-PG6581-B (Frame6B)Duration for EPC/Warranty 8 months / 12 monthsVoltage Level 110 KV and 220 KVDelivery date October 2003Employer Ministry of Energy, TurkmenistanScope LSTK-EPC Prime Contractor
balkanabat 220/110 kv switchyard
Location Balkanabad, TurkmenistanDelivery date October 2003Employer Ministry of Energy, TurkmenistanScope LSTK-EPC Prime Contractor
dashoguz power plant
Capacity 254 MWEquipment Spec. 2 x GE-PG9161-E (Frame 9E) Duration for EPC/Warranty 14 months / 24 monthsVoltage Level 110 kVDelivery date March 2010Employer Ministry of Energy, Turkmenistan Scope LSTK-EPC Prime Contractor
amuderya hv power Transmission/distribution
Location Turkmenabad, TurkmenistanDelivery date March 2007Employer Ministry of Energy, Turkmenistan Scope Engineering, Procurement, Logistics and Erection Supervision
dashoguz 110 kv switchyard
Employer Ministry of Energy, Turkmenistan Scope LSTK-EPC Prime ContractorLocation Dashoguz, TurkmenistanDelivery date October 2007
abadan power plant
Capacity 123.6 MWEquipment Spec. Simple Cycle, GE-PG9161-E (Frame 9E)Duration for EPC/Warranty 14 months / 24 monthsVoltage Level 110 KVDelivery date October 2003Employer Ministry of Energy, TurkmenistanScope LSTK-EPC, Prime Contractor
ashgabat power plant
Capacity 254 MWEquipment Spec. 2 x GE-PG9161-E (Frame 9E) Duration for EPC/Warranty 11 months / 24 monthsVoltage Level 110 KVDelivery date February 2006Employer Ministry of Energy, Turkmenistan Scope LSTK-EPC Prime Contractor
balkanabat power plant - 2
Capacity 254 MWEquipment Spec. Simple Cycle, 2 x GE-PG9161-E (Frame 9E) Duration for EPC/Warranty 22 months / 22 monthsVoltage Level 110 kV and 220 kVDelivery date March 2010Employer Ministry of Energy, Turkmenistan Scope LSTK-EPC Prime Contractor
18 19
NAVOI combined cycle power plant project
Capacity 478 mwEquipment Spec. Combined CycleDuration EPC / Warranty 36 months / 24 monthsVoltage Level 220 kVEmployer Ministry of Energy, UzbekistanScope LSTK-EPC Consortium Partner
COMPLETED PROJECTS (2012)UZBEKISTAN
20 21
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
OUR CAPABILITY IN IRAQ
Çalık Energy offices
Mosul Office
Nainawa Power Project
Camp and Offices
Kerbela Office
Khairat Power Project
Camp and Offices
ErbilO & G Office
Power Office
BaghdadMain Office & HousesBaGhDaD
KErBEla
Khairat
mOSul
nainawa
ErBil
20 21
AL-KHAIRAT simple cycle power plant project
Capacity 1,250 mwLocation IraqDelivery April 2013
Key Figures » Tank Farm of 11 Crude Oil and Diesel Storage Tanks over 4,000 tons of Steel » Total Hydrocarbon Storage, Capacity 1.2 MMbbl » Fuel Unloading Station, Capacity of handling 40 KBOPD Crude Oil » Crude Oil Pipeline Connection (Metering Station, Pigging Station) » Crude Oil Treatment Plant, Capacity 70 KBOPD » Total Engineering manhours are estimated to be 125.000 » Crude Oil Forwarding System, Capacity 64 KBOPD » Average Hydrocarbon Pipe dia. >8” » Over 100,000 dia. inch welding on Hydrocarbon Piping » 8,000 gpm capacity installed Fire Fighting System » Full Fire Fighting and Foam System as per NFPA » Extensive Oil Water and Drainage System over 10 API Oil Seperators » 60,000 meters of piling works » 7.8 million man-hours of construction
ONGOING PROJECTS IRAQ (2012 – 2013)
22 23
ENGINEERING & CONSTRUCTION
ÇALIK ENERJİ CORPORATE PROFILE
Capacity 750 mwLocation Iraq
Key Figures » Tank Farm of 12 Crude Oil and Diesel Storage Tanks over 3,500 tons of Steel » Total Hydrocarbon Storage, Capacity 1.0 MMbbl » Fuel Unloading Station, Capacity of handling 30 KBOPD Crude Oil » Crude Oil Pipeline Connection (Metering Station, Pigging Receiving Station) » Crude Oil Treatment Plant, Capacity 50 KBOPD » Crude Oil Forwarding System, Capacity 64 KBOPD » Average Hydrocarbon Pipe dia. >8” » Over 80,000 dia. inch welding on Hydrocarbon Piping » 8,000 gmp capacity installed Fire Fighting System » Full Fire Fighting and Foam System as per NFPA » Extensive Oil Water and Drainage System over 15 API Oil Seperators » 5.8 million man-hours of construction
ongoıng projEcTs IRAQ (2012 – 2013)
NAINAWAsimple cycle power plant project
22 23
24
POWER SYSTEMS
ÇALIK ENERJİ CORPORATE PROFILE
PoWER SYSTEMS
what wE DO…
ExCEllEnCE in
CuStOmEr SErviCE
Acq
uire
Operate
Develop
With a proven track record of company turnaround and operational efficiency in electricity distribution business, Çalık Enerji is positioned to repeat the successful business model it has implemented in yEDAŞ in other organizations, i.e. KOSOVO (with Limak Group) and ARAS EDAŞ (with Kiler Group) as an investor partner.
ÇALIK ENERJİ CORPORATE PROFILE
24
25ELEcTRIcITY dISTRIBuTIoN & PoWER GENERATIoN
• Electricity distribution
• Gas distribution
• Distribution network & power generation
• Retail electricity & natural gas to customers
• Maintenance & customer services
• Power generation capacity
BuSinESS mODEl
Management of project realization and operational performance
Distribution & generation
Cost leadership
Load balance optimization
Fuel mix optimization
Wholesale trading
Sustainable investment & shareholder
return
Our mission is to provide security of supply to our customers
Acquire Operate Develop
25
26
POWER SYSTEMS
ÇALIK ENERJİ CORPORATE PROFILE
SamSun9,490 km2
muĞlaYataĞan tPP
BurSa KiZKaYaSi
hEPP
SarPinCiKiZmir wPP
DEmİrCİlİiZmir wPP
ÇanKiriOrta tPP
KiriKKalECCPP
PoWER GENERATIoN PRoJEcTS PoRTFoLIo
Power GenerationSİnOP
5,862 km2
ÇOrum12,820 km2
BurSa
KaYSErİ
Wind Power Plant
Thermal Power Plant
Hydro Power Plant
79%Thermal Power
Plant - Combined Cycle Power Plant
17%Hydraulic
Power Plant
4%Wind
Power Plant
Capacity Distribution
Annual Generation Distribution
92%Thermal Power
Plant - Combined Cycle Power Plant
2%Hydraulic
Power Plant
6%Wind
Power Plant
ÇALIK ENERJİ CORPORATE PROFILE
27
aKSu hEPP
aDaCamİ hEPP
DÜZhanlar hEPP
Çalık EnErjİ has buılT a porTfolıo of opTıons whıch wıll undErpın ThE long-TErm susTaınablE growTh of ThE busınEss.
SamSun9,490 km2
amaSYa5,690 km2
OrDu6,001 km2
Electricity Distribution
Gas Distribution
BURSAGAZNumber of subscribers: 710,000Market share: 3.4%
KAySERİGAZNumber of subscribers: 380,000Market share: 1.3%
Gas Distribution
Operates in Black Sea region Covering 5 citiesNumber of subscribers: 1.6 millionTotal consumption: 4.1 TWhMarket Share: 3.0%
Electricity Distribution
Covering 5 citiesNumber of subscribers: 458.000 millionTotal consumption: 4.5 TWh
Çalık Enerji - limak Kosova Electricity Distribution
ÇOrum12,820 km2
KaYSErİ
yEDAŞ
28
POWER SYSTEMS
ÇALIK ENERJİ CORPORATE PROFILE
gEnEraTıon
Project Status Capacity (MWe) Annual Generation (GWh)
Çankırı Orta TPP (lignite) Pre-construction 150 985
Muğla Yatağan TPP (lignite) Engineering 160 1,050
Kırıkkale CCPP (NG) Engineering 1,200 8,000
Düzhanlar HEPP (Borçka, Artvin) Pre-construction 12 46
Adacami HEPP (Rize) Under construction 30 105
Kızkayası HEPP (Mustafakemalpaşa, Bursa) Pre-construction 112 314
Aksu HEPP (İspir, Erzurum) Pre-construction 160 372
Sarpıncık WPP (Izmir) Financial close 32 115
Demircili WPP (Izmir) Financial close 40 155
Total 1,914 10,940
29ElEcTrıcıTy dısTrıbuTıon busınEss ın TurkEy
5 CITIES
ElECtriCitY DiStriButiOn
1.6 MILLION CUSTOMERS
4.5 TWHCONSUMPTION
4.0%MARKET SHARE
SİnOP5,862 Km2
SamSun9,490 Km2
OrDu6,001 Km2
amaSYa5,690 Km2
ÇOrum12,820 Km2
30
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
oIL & GAS
what wE DO…
ExCEllEnCE in
PEtrOlEum rESOurCE
DEvElOPmEnt
Acquire Develop O
perateCom
mer
cial
ize
Acquire
Develop
Operate
Commercialize
ÇALIK ENERJİ CORPORATE PROFILE
30
31
Exploration licenses Discovered reserves
Production from prospective & discovered resources
Drilling Workover Oil Production
Discovered proven and/or producing reserves
-
Oil pipeline transit solutions Central East Turkey
-
-
-
Oil refining capacity South Turkey
Bitumen import
Petroleum products marketing
Upstream Midstream Downstream
OIL & GAS VALUE CHAIN WHERE WE OPERATE 31
32
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
UPSTREAM ouR vISIoN FoR THE FuTuRE
Middle East and North AfricaTurkmenistan
& Iraq
Selected InternationalMarkets
Turkey
TODAy TOMORROW
Participation in upstream petroleum operations
Delivery of oil field services to 3rd party customers and petroleum operations in which we participate
33UPSTREAM CAPABILITIES
REGIoNAL EXPERTISE IN GEoLoGY ANd PETRoLEuM SYSTEMS
Arabian Plate
• South Eastern Turkey geology expertise transferable to geology of Arabian plate
• Arabianplateexpertisetransferable to geology of Horn of Africa
• ArabianPlate–geology- Cretecous petroleum system- Jurassic petroleum system
Gondwana Plate
• Gondwana plate expertise transferable to geology of North African basins
• Gondwanaplate–geology- Silurian petroleum system- World class source rock
• Orogenybackground- Reservoir tectonics- Trap formation
East africa
Caspianturkey
arabian Plate
north africa
• Caspian (Black Sea, Caucasus, Turkmenistan expertise transferable to drilling and geology)
TOMORROW
Çalık Enerji Expertise
34
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
UPSTREAM CAPABILITIESINTEGRATED TEAM WITH REGIONAL EXPERTISE IN EXPLORATION, DEVELOPMENT AND PRODUCTION OPERATIONS
Geological evaluationGeological mappingMeasuring stratigraphic sectionsCollecting geological samplesIntegrating the data with subsurfaceWell log interpretation
3D basin modelingGeophysical interpretation3D Seismic Interpretation SystemsSeismic data acquisition (2D&3D)Seismic data processing (2D & 3D)Seismic data interpretation3D reservoir modeling
Well design and planningField development planningBasic engineeringCost estimationProduction planningProduction optimization (EOR)Production operationsHeavy oil production operationsSulphur handling
35EXPLORATION AND APPRAISAL IN TURKEY
Antep Project
Sinan Project
Besni Project
36
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
GAS DISTRIBUTION
In 2004, Çalık Enerji moved into the energy distribution sector through the acquisition of Bursagaz as part of Turkey’s privatization of its natural gas distribution network. Bursa is the third major gas consumption center in Turkey after Istanbul and Ankara and as part of the deal, Çalık Group acquired a 30-year operator’s license. In 2007, the Group expanded its gas distribution operations through the acquisition of Kayserigaz, the natural gas distributor in and for the City of Kayseri. In line with its growth and restructuring strategies, between April 2007 and October 2008 the Group sold an 80% interest in each of Bursagaz and Kayserigaz to Ewe Enerji A.Ş., the Turkish subsidiary of Ewe Aktiengesellschaft, but remains as a strategic minority partner in both companies with a 10% stake. The remaining 10% of each of Bursagaz and Kayserigaz is held by the municipalities of Bursa and Kayseri.
ÇALIK ENERJİ CORPORATE PROFILE
37
Antep Project
BURSAGAZ2.8-3.0 BCM per year775,625 subscribers647,494 other users5010 km of distribution network80% network coverage3.4% market share of TurkeyTL 441 million revenue
KAYSERIGAZ0.385 BCM per year343,000 subscribers320,000 other users2100 km of distribution network75% network coverage1.2 % market share of TurkeyTL 160 million revenue
38
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
UPSTREAM CAPABILITIESUPSTREAM LICENSE PORTFOLIO (STATUS 2013)
DistrictLicense
Name Grant DateDate of Seismic
Acquisition
Date of Subsurface
Interpretation Date of Well Status
Siirt14494 04.01.2009 2010-2011 2012
2 wells drilled 2010-2011 Discovered 40 APIO oil
4495 04.01.2009
4778 20.11.2010 2011 2012 2013 Well will start in January 2013
5030 15.05.2012 2013 2014 2014 programmed
Gaziantep
4413 11.09.2008 2011 2012 2012Well drilled to a depth of 2000 m
and completed as dry hole
4414 11.09.2008
4415 11.09.2008
4416 11.09.2008
5076 20.06.2012 2013 2014 2015 programmed
5077 20.06.2012
5078 20.06.2012
4614 18.10.2010 2011 2013 2014 programmed
Van4909 10.07.2011 2014 2015 2015 programmed
4910 10.07.2011
Konya24705 18.03.2011 2014 2015 2015 programmed
4706 18.03.2011
Trakya 3864-5059 08.04.2004 * 20092 wells drilled
2008-2009 1,450m3/d
1 Siirt licenses are also used for unconventional play and it is the intention of Çalık Enerji to increase acreage position in this basin. 2 Konya licenses are for Gas Storage.
39
40
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
thraCE liCEnSE nO. 3864 –firSt GaS DiSCOvErY Of ÇaliK EnErJİ• Geochemical field survey conducted and 5.700 field samples collected and
analyzed in 2007. • Geological field study was completed in 2009• 100 Km 2D new seismic data acquired and interpreted in 2009.• Banarlı 3-4 wells drilled in 2008 and 2009• Exploration well Karaca-1 drilled in 2010• One well was completed as gas producer in 2010• Producing form Banarlı-3 at 1,450 scm/d
upsTrEam capabılıTıEsUPSTREAM LICENSE PORTFOLIO (STATUS 2013)
KOnYa liCEnSE nO. 4705 – 4706: aPPraiSinG unDErGrOunD GaS StOraGE POtEntial • First Private Gas Storage Project• To be come the second gas storage in the country when realized• 1.0 Bcm capacity• Potential partnership with two major Companies
Storage Place : Tuz Gölü (Aksaray-Konya) Storage Type : Salt Dome Storage Capacity : 1.0 bcm (Working Gas) Total Gas Volume : 1.4 bcm (Total Volume) Inj./Withdrw. Pres : 188-75 bar
Sİİrt liCEnSE nO. 4494 , 4495, 4778 anD 5030: aPPraiSinG unCOnvEntiOnal rESOurCE POtEntial• Prospective Silurian shale that holds shale oil potential• The 5 cores from Çalıktepe-2 proved that light oil has been generated and trapped in
the shale• The Çalıktepe-1 and 2 wells have been cased and suspended for shale testing• Appraising the unconventional resource potential:
• Targeted drilling (vertical)• 2013 program: frac and test Silurian shale to assess resource potential
• Knowledge acquisition from Canadian shale oil expert• Resource growth based on presence of Silurian shale in 3 of our licenses• Prospective resource estimate 95 MMbbls (P50) for 3 licenses • Planning to acquire more unconventional acreage
Sİİrt liCEnSE nO. 4494 – 4495 – firSt Oil DiSCOvErY Of ÇaliK EnErJİ(Çalıktepe-1 First Discovery 40o API 2010)• Çalıktepe-1 well was drilled in 2010 to 2,500 m. • Çalıktepe-1 well made a discovery of Silurian sourced Ordovician sandstone.• 215 Km 2D Seismic and 230 Km2 3D seismic data collected and interpreted by the
second quarter of 2011.• 1 Appraisal well drilled in second half of 2011.• Expected recoverable oil resource is 4 to 50 MMbbl.
41
Capabilities are in our people…Demand in CIS and Middle East oil field service market caused the members of the team to gather and gain extensive experience over several years.
Our field services team has the operating experience in areas such as over- and under-balance drilling, hole enlargement, core drilling, completion operations, side tracking, well control, lost circulation management. Well design and realization of drilling & work-over operations to international oil field standards.
If desired by the customer our field services team can provide project management, construction, installation and commissioning services for the oil & gas production facilities of our customers. These are delivered in collaboration with our Engineering & Construction division.
Our people have acquired their experience in the oil- and gas fields from challenging petroleum operations areas such as Kazakhstan, Turkmenistan, Iraq, Libya, Syria, Azerbaijan, Iran, Egypt, Saudi Arabia and Turkey.
Our people work as one team…
The team has proven its ability to:
• Translate individual expertise into integrated and reliable delivery of field services to our customer.
• Apply the operating team’s collective expertise to finding and implementing engineering and operating solutions to the most demanding challenges our customers may face.
UPSTREAM CAPABILITIESFIELD SERVICES – OUR CAPABILITIES
42
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
Integrated Project Management Our approach is to deliver high quality services to the customer through the proven abilities and skills of our engineers and operators, and working in harmony with the customer to deliver operating results to international oil field standards.
Our Field Operations Group includes world class geologists, engineers, analysts and management teams.
Our team can manage integrated field service projects on behalf of our customer, with the collective expertise of on-site and headquarter staff always focused on delivering quality services to our customers.
We implement improvement steps by learning from delivered services. Thereby we ensure long term working relationships with customers and host country petroleum authorities alike.
Integrated Well Services Our strength is to provide an integrated service to the customer and working closely with the authorities of the project country for the best mutual understanding so that the project objectives are clearly understood and interests are aligned. The core competence is in providing necessary expertise in technical and commercial disciplines to the oil and gas industry at reasonable cost. Innovation and best industry practices are the fundamentals for creating value for our customers throughout the life of their assets, from exploration and appraisal, through development and production.
UPSTREAM CAPABILITIESFIELD SERVICE OPERATIONS – THE VALUE PROPOSITION TO OUR CUSTOMERS
ÇALIK ENERJİ CORPORATE PROFILE
43
Areas of OperationGeographically focused with service capabilities near the fields; established market: Turkmenistan
Experienced WorkforceEmployees acquired expertise from a long service as drilling & production operators of the Turkish Petroleum Corporation. We strive for best practice implementation.
GrowthOur goal is to grow our custom base, service offerings and geographic markets, always in harmony with our value offering to the customer
Startup FlexibilitiesIdentifying the optimum place for job execution to maximize equipment performance. Organize crews into focused teams to complete multiple tasks simultaneously. Key staff on site during rigs up to improve quality of job execution
Pre-Job PoliciesEfficient communication with customer during design & work planning process; continuity of technical staff to avoid repetition and save customers time
Operational ExcellenceMonitoring of equipment to spot potential problems. On site maintenance of equipment. Proactive replacement of wear items before failure can take place.
UPSTREAM CAPABILITIESFIELD SERVICES – OUR OPERATING POLICY
43
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
44UPSTREAM CAPABILITIESFIELD SERVICE OPERATIONS – OUR TRACK RECORD
UPSTREAM CAPABILITIESOUR COMMITMENT TO SUSTAINABLE DEVELOPMENT
- Completed more than 100.000 meters of drilling in Turkmenistan
- Successful implementation of the integrated project management system
- Deep drilling (26 wells) in high pressure and sour operating conditions present in 4 different fields of Turkmenistan
- Drilling operations have been done in collaboration with world class drilling contractor
- Demonstrated capability in the following areas of expertise:
• High HSE standards; no lost time due to injury or accident
• High tech western technology used in challenging drilling environment:
• High pressure and high temperature (12000 psi and 156OC)
- High H2S content (6-7% by volume)- Hard rock formations- Salt formations- Reactive Shales- Shallow Gas- Penetration through depleted
reservoir zones
• Target depths of 3000 – 5000 meters both for oil and gas
• Integrated project management for multi-site operations:
• Planning and technical operation,• Procurement & Logistics Customer benefit from our field service operations – customer increased production by 64%
We use our operating capacity in harmony with the sustainable development objectives of the country where we operate:
• Economic efficiency of our operations• Social benefit of our operations• Environmental compatibility of our
operations
We are conscious of the fact that our operations must have a positive impact for the people of our host country.
Field NameBefore Çalık Enerji
(Bbl/d)After Çalık Enerji
(Bbl/d)Total Investment
(Million USD)
Nebitlije 2,000 7,500 155
G. Kamıshlıja 14,000 21,250 320
Akpatlawuk 9,000 13,000 185
TOTAL 25,000 41,750 660
45
» Certificates - ISO 9001:2008- ISO 14001:2004- OHSAS 18001:2007
» Policies - Commitment to continuously improve
services within the framework of ISO 9001:2008 Quality Management System while meeting the legal requirements of the host country
- Commitment to implement ISO 14001 Environmental Management System
- Commitment to preserve human health and safety by implementing OHSAS 18001 Occupational Health and Safety System
» risk management - Prior to operation start, hazards
and risks are defined and mitigated through operational safeguard planning.
- A pre-project appraisal to optimize project costs, schedules and economics is provided to the customer.
- This is followed by execution plan which includes basis of design, costs over time, risk management actions, HSE management responsibilities and action plans, all based on the customer’s statement of requirements.
UPSTREAM CAPABILITIESOUR QUALITY, HSE POLICIES & RISK MANAGEMENT POLICIES
46
ÇALIK ENERJİ CORPORATE PROFILE
Oil & GaS MID- & DOWNSTREAM
MID- & DOWNSTREAMOUR CAPABILITIES
• Tank farm, pipeline & refinery infrastructure
• Product marketing & sales
• Feasibility• Conceptual design• Technology selection• Cost estimation• Project execution
planning• Operations planning• Contractor supervision
• Economic analysis• Regulatory compliance
framework• EPC contracts - strategy,
negotiation, supervision• Ownership structure -
definition, negotiation, implementation
• Financing structure - definition, negotiation, implementation
• Product logistics & sales - planning, implementation, supervision
ScopeTechnical definition
of petroleum infrastructure
Commercial definition
ÇALIK ENERJİ CORPORATE PROFILE
47
Samsun Ceyhan Crude Oil Pipeline Project•Licensegranted@2006•JVwithItaly’sENIGroup•Capacity:50-70 mtY•Length:555 km•UnloadingTerminal@Samsun•LoadingTerminal@Ceyhan•Pumps/ReducingStationsFeed Completed
MIDSTREAMTRANS ANATOLIAN CRUDE OIL PIPELINE INVESTMENT PROJECT
turKEY
ruSSia
GEOrGia
aZErBaiJan
iran
iraQ
KaZaKhStan
ANKARA
CEYHAN
MOSUL
Existing PipelinesSamsun - Ceyhan Pipelines
KERKÜK
SAMSUN
Samsun Ceyhan Crude Oil Pipeline
Project
Refinery Project
NOVOROSSIYSK
BAKU
İZMİR
Adana Eastern Mediterranean
Refinery•Grass-RootsRefinery•Capacity:200,000 BBl/D - 10 mt/Y•Location:Yumurtalık / Ceyhan-adana•Type:high Conversion (hydrocracker/coker)•Feed:medium heavy•LicensehasbeengrantedtoÇalıkEnerjiPre - Feed Completed
48
ÇALIK ENERJİ CORPORATE PROFILE
OIL & GAS UPSTREAM
DOWNSTREAMPETROLEUM TRADING - BITUMEN IMPORT
» OPEratiOnS EU quality Bitumen Grades• Partnership with global
commodity trade • Deliveries to major ports• Operational capabilities up
to 200 kT
» lOGiStiCS • Delivery by world class
bitumen vessels • Ship and custom clearance• Ship/shore product transfer• Delivery on trucks after
customs clearance• Loading at high speed and
high temperature• Health, Safety and
Environment control procedure
amBarli
DİlOvaSi
DİKİlİ
alİaĞa
CEYhan
SamSuntraBZOn
EU Refinery to Port
From Ship to Road trucks
Marketing Operations
Sales LogisticsControl Process
» SalES • Strong customer base• Strict quality assurance• Supply security• Alternative supply sources• Innovative commercial
arrangements
49
ÇALIK ENERJİ SAN. VE TİC. A.Ş.
GENERAL MANAGEMENT
Yaşam Caddesi Ak Plaza Nr: 7 Kat: 17
Po Box: 06510 Söğütözü, Ankara, Turkey
Tel: (00 90) 312 207 71 00
Fax: (00 90) 312 207 71 71
HEAD OFFICE
Büyükdere Caddesi Nr: 163
34394 Zincirlikuyu, Istanbul, Turkey
Tel: (00 90) 212 306 50 00-97
Fax: (00 90) 212 306 29 66
ÇALIK ENERJİ ALBANIA OFFICE
Tirana Business Center Bulevardi
“Zogu 1” Tirana, Albania
Tel: (00 355) 422 73 45 – 422 69 49
Fax: (00 355) 422 73 39
ÇALIK ENERJİ TURKMENISTAN OFFICE
Altın Asır Marketing Center Goroglu Street Nr: 77,
744000, Ashgabat, Turkmenistan
Tel: (00 99 312) 39 23 65
Fax: (00 99 312) 39 23 79
ÇALIK ENERJİ FZE
Jafsa Viewvs 19 (Lob) 11.Floor
Office No:1106 JAFZA / Dubai, U.A.E.
Tel: (00 971 4) 884 91 47
Faks: (00 971 4) 884 91 48.
ÇALIK ENERJİ IRAQ OFFICE (POWER SYSTEMS)
Al Wazırıyah Surveying 301/5th Street Nr: 15 Baghdad, Iraq
ÇALIK ENERJİ NAVOI OFFICE
Tashkent City, Mirzo Ulugbek, Afrosiyob St., 14,
(Roison Business Center, 5. Floor ) Tashkent, Uzbekistan
Tel: (00 998 71) 256 01 28, 256 01 29
Fax:(00 998 71) 256 01 42
ÇALIK ENERJİ DAPRAŞ
Büyükdere Cad. Nr:163 34394
Zincirlikuyu, Istanbul, Turkey
Tel: (00 90) 212 306 50 17
Fax: (00 90) 212 212 29 68
TAPCO PETROL BORU HATTI SANAYİ VE TİCARET A.Ş.
Büyükdere Cad. No:163 3439
Zincirlikuyu, Istanbul, Turkey
Tel: (00 90) 212 306 51 90
Fax: (00 90) 212 306 58 90
YEŞİLIRMAK ELEKTRİK DAĞITIM A.Ş. (YEDAŞ)
Mimar Sinan Mah. Atatürk Bul. Nr:19
55200 Atakum, Samsun, Turkey
Tel: (00 90) 362 311 44 00
Fax: (00 90) 362 400 42 05
Contents
In Brief
Engineering & Construction
Power Systems
Oil & Gas
CORPORATE PROFILE
ÇALIK ENERJİ SAN. VE TİC. A.Ş.Büyükdere Caddesi Nr: 163 34394 Zincirlikuyu, Istanbul, TurkeyTel: (00 90) 212 306 50 00-97Fax: (00 90) 212 306 29 66www.calikenerji.com
OPERATIONAL EXCELLENCE...