Page 1: Corporate Profile CFVL 20140205

| TELECOM | QUALITY | DELIVERY |

Crystal Future Venture Ltd.

Page 2: Corporate Profile CFVL 20140205

CFV Group

CRYSTALFUTURE VENTURE LIMITEDABOUT US

Page 3: Corporate Profile CFVL 20140205

CRYSTAL FUTURE VENTURE LIMITED (CFVL)

Technology Textile Chemical Real Estate

Crystal Future Venture Ltd.

(CFVL)

ZedandZed IT Services Ltd.

Crystal CompositeLtd.

BD Venture Ltd.

First Builders Ltd.

Technology DivisionManage IT Plus Ltd.

CFV Group: Since 1991

Total Employee : 2500+Annual Turnover : USD 100m+Establishment : 8 in Dhaka,

7 Regional

• Crystal Future Venture Limited is a sister concern of CFV Group.• CFV Group at a glance:

Sun Fashion Ltd.

Page 4: Corporate Profile CFVL 20140205

TECHNOLOGY DIVISION OF CFV GROUP

Technology Division

Crystal Future Venture Ltd.(CFVL)

ZedandZed IT Services Ltd.

Manage IT Plus Ltd.

Total Employee : 250+

Focus : Wireless and IT Products including Services & Integration & Optimization

Page 5: Corporate Profile CFVL 20140205

CRYSTAL FUTURE VENTURE LIMITED (CFVL)• Crystal Future Venture Limited (CFVL) is a fast growing private limited company registered with

Bangladesh Join Stock Company.• Crystal Future Venture Ltd. has been incorporated in 2007 & the corporate office is located in

Nikunja-01 at Dhaka. The Company started its operation with a goal to serve the telecomcompanies, telecom service providers, network operators by ensuring high qualityTelecommunication solutions and services to the ICT operators in Bangladesh as a service andsupport organization.

• Our objective is to address the need of our customers by providing world class services whichincludes: Project Management, RF Planning, Site Survey & Acquisition, Civil Construction,Structural Design, Tower Erection, BTS, and BSC, MSC, CSN & ASN Installation & Commissioning.Microwave equipment Installation, Commissioning & Testing, RF Optimization and developingdiscrete or integrated planning, end to end IT and Datacom connectivity using Microwave ordifferent radios and Structured Cabling WAN Setup & Installation, Support Services with ServiceLevel Agreement.

• With over 6 years' of Telecom & Datacom implementation, CFVL has developed a strong pool oflocal resources, project management skills and processes for turnkey deployment, complete sitesolutions (incorporating the network equipment, ancillary equipment for the civil infrastructure),combined with comprehensive Rollout Services Packages to get Customer’s network up andrunning quickly.

Page 6: Corporate Profile CFVL 20140205

CFVL ORGANOGRAM

Director - Operations

(Mr. Ananda Kumar Chatterjee)

DGM - Sales

Manager - Sales

Executive -Sales

Jnr. Executive -Sales

DGM -Operations

TI Manager -Huawei

20x BSC Engineer

20x Diploma Engineer

40xSnr Technician

20x Technician

TI Manager-Ericsson

5x BSC Engineer

5x Diploma Engineer

10xSnr Technician

5x Technician

TI Manager-NSN

15x BSC Engineer

15x Diploma Engineer

30xSnr Technician

15x Technician

TI Manager -Robi

15x BSC Engineer

15x Diploma Engineer

30xSnr Technician

15x Technician

RF Manager -ZTE

3x Snr RF Engineer

5x DTEngineer

5x Rigger

RF Manager -Ericsson

5 x Snr RF Engineer

3 x RF Engineer

4x RF LOS SUrvey

Engineer

5 x Rigger

DGM - FIN and ACCNT

Manager - FIN and ACCNT

Executive - FIN and ACCOUNT

DGM - HR and ADMIN

Manager - HR and Admin

Executive - HR and Admin

Managing Director

(Mr. Sabbir Ahmed Khan)

Chairman

(Mr. Sultan Ahmed)

Page 7: Corporate Profile CFVL 20140205

Mr. Ananda Kumar Chatterjee

Director & COO - CFVL.

Mr. Chatterjee joined Pacific BangladeshTelecom Ltd (the first private Mobileoperator in Bangladesh) in the year 1996and left the organization as a Vice President(Engineering) in 2004 and Joined TelebartaLtd. (PSTN operator based on CDMA WLLSystem) as a General Manager (Technical).

Mr. Sabbir Ahmed Khan

Managing Director, CFVL

Sabbir Khan was the President of MotorolaBangladesh, GM & Regional Director forMotorola South East Asia (Maldives, Nepal,Bhutan, Sri-Lanka, Bangladesh & Part ofPakistan).

MEET THE LEADERS

• He has completed his masters in project Management from GorgeWashington University, USA and completed multiple multimillion$ Projects in different countries.

• During his tenure Sabbir has been awarded like• Millennium High Performance Award,• Sales Achievement Award,• Sales Man of the Year Award and• Chairman’s Club WNNR’s award

• He has completed is B.Sc. Engineering in Electrical andElectronics from Bangladesh University of Engineering &Technology (BUET) and worked for Telebarta up to June 2009and left the organization as Head of Technical.

• During his job span in Telecom field he has completed many largeprojects as a project Manager & Director, developed as skilledand professional team with more than 300 human resource andmade many large volume development and operations with hisleadership as a Technical Head.

Page 8: Corporate Profile CFVL 20140205

SERVICE OFFER

• Network Planning & Design• Project Management• TELCO ANE Supply• Network Deployment • Site Acquisition & Preparation• Telco Tower Supply, Installation

• Installation • Commissioning• Integration• Optimization

• Network Operation & Maintenance• Infrastructure Management• RF Planning/Simulation• RF Optimization

Page 9: Corporate Profile CFVL 20140205

OUR CLIENTS

• In Last several years we have worked with most of the leading Private Telecom operators and service providers of Bangladesh and we are still continuing our business with them. We take the pride to claim our self as the partner of success of the following organizations:

Grameen Phone Ltd. Robi Axiata BD Ltd. Orascom Telecom. Bangladesh Ltd (Banglalink) Augere Bangladesh (Qubee). Banglalion Pacific Bangladesh Telecom Ltd. Huawei Technologies(BD) Limited Nokia Siemens Networks Ltd. Airtel Bangladesh Limited. LM Ericsson Bangladesh Ltd. ZTE Corporation Teletalk Bangladesh Ltd.

Page 10: Corporate Profile CFVL 20140205

CFVL ACHIEVEMENTS - IN NUMBERS

7 + yearsin Operation, growing

stronger

2000+ sites2G and 3G optimization,

200+ sites WIMAX Optimization

3000+ sites – BTS

Installation and Commissioning

8000+Sites – BTS Swap

3500+ sites –

O&M in 2 Major Regions

60+ Resources

Outsourced to major Telecom

Vendors and Operators

Page 11: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Year 2010

Project Name: Warid Network Optimization awarded to CFVL by LM Ericsson BD Ltd Site Quantity: 499

Project deliverables:

• Drive Test & log file analysis• Post processing and reporting using TEMS, Map info, Actix Tools• Responsible to meet the Target KPI• Radio Network Optimization- Monitoring & analysis the Radio Network Statistics. (Using I

Manager M2000).• Optimize and Parameter tuning for HSR , LU, Paging, CSSR &CDR• Establishment Success rate in Voice & Packet services.

Page 12: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Year 2011:

Project Name: Banglalion WiMax Optimization project awarded to CFVL by ZTE Corporation Site Quantity: 120

Project deliverables:

• Drive test & log file analysis• Analysis of CINR, RSSI, Downlink MCS, Throughput, Handover• Successes Rate, interference, network entry time, Jitter test• Monitoring and analyzing the Wimax Radio Network Statistics from M2000 on daily, monthly

& weekly basis to achieve & maintain the Radio Network Performance as per the contractedKPIs

• Maintaining the benchmark KPI for the network up gradation.• Observe & maintain the major KPI up to mark after new site deployment.

Page 13: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Year 2012 & Part of 2013

Project Name: Robi Network Optimization (ALU swap) project awarded to CFVL by LMEricsson BD Ltd. Site Quantity: 420

Project Deliverables:

• Perform Drive Test to problem analysis• Performance analysis on Pre & Post drive test activity• Report preparations according to customer requirement template• Action to improve impacted BSC & Cell performance• Daily Alarm analysis on BSC/Cell) with performance & escalated to Operation team for

rectifications• Defined HO Relationship & Neighbor relationship• Daily worst cell analysis for all critical KPI’s & action for correction

Page 14: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Year 2013:

Project Name: Robi 3G Drive Test Project (2013-2015) awarded to CFVL by LM Ericsson BDLtd. Resource Quantity: Presently 6 DT Teams are working.

Project deliverables:• Collect data in the field for 2G and 3G• Set up, configuration and administration of tools and equipment (GIS, MapInfo• 2G/EGPRS/3G/HSPA measurements.• Drive testing sessions of troubleshooting, performance tuning, verifying GSM/GPRS network coverage

and quality in different locations by using TEMS Investigation version 13 or above• Testing of different types of calls (Voice long calls and short calls, data Calls)• Packet long downloads• KPI measurements (Voice, Data/Packet)• New site verification and Benchmarking (Pre and Post)• Preliminary post-processing of measured data to support Optimizers.• Responsible for reporting, quality assurance, technical support, and customer interface.

Page 15: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Project Name: Network Performance Improvement (NPI)-2013-2015 awarded to CFVL by LM Ericsson BD Ltd. Resource Quantity: Presently 3 Engineers are working.

Project deliverables:• Daily Report fetching with Ericsson BO• Daily Analysis (BSC & Cell level performance)• Action to improve impacted BSC & Cell performance• CR request (if required) to Team lead for execution• Perform DT with the help of DT team to problem analysis• DT log analysis & action plan for improvement • Report/Presentation preparations as & when required• Maintaining BSC & Cell performance as per target• Technical suggestion to field team for improvement

• Daily Alarm (BSC/Cell) analysis with performance & escalated to Operation team for rectifications

• Daily/weekly parameter audit & action for correction• Network (RF) inconsistency check & corrective action• Performance analysis (Pre & Post activity)• Frequency Tuning to improve network performance• Neighbor audit & action for improvement• Weekly Neighbor inconsistency check & correction• Daily worst cell analysis for all critical KPI’s & action

for correction

Page 16: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Project Name: Network Performance Management (NPM)-2013-2015 awarded to CFVL by Huawei Technologies BD Ltd.

Resource Quantity: Presently 7 DT Teams are working.

Project Deliverables:

• Drive Test/Walk Test route preparation following test requirements.

• Conduct Drive Test/Walk Test (field measurement) following test cases defined by planning/Optimization Engineer, and provide correct & valid log file.

• Collect necessary such as radio environment photo and blocking Evidence.

• DT log file analysis and provide the initial findings

Page 17: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Project Name: Robi DT project 2013-2015 awarded to CFVL by Robi Axiata BD Ltd.

Resource Quantity: Presently 4 DT Teams are working.

Project Deliverables:

• Regular CS Drive Test.

• Integration of New Sites

• Pre & Post swap Drive Test

• Troubleshooting Drive Test

• Reparenting/SW upgrade & other Special kind of Drive Test

• Network Tuning & Optimization.

Page 18: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - RF

Project Name: Robi Area Survey project awarded to CFVL by Robi Axiata BD Ltd.

Site Quantity: 169

Project Deliverables:

• Collect location Information

• Description of the Area

• Existing Coverage Information

• Short Description of accessing the surveyed area from nearest upazila headquarter.

Page 19: Corporate Profile CFVL 20140205

TECHNICAL RESOURCE OUTSOURCING SERVICE• CFVL is carrying out the responsibility of technical resource supply to vendors and

operators as required.

• We have started the journey in this track since 2011 and presently involved with LMEricsson Bangladesh Ltd , Huawei Technologies (BD) Ltd and Robi Axiata Ltd.

• All of the supplied resources are in our payroll but they are working for our customers intheir premises.

• We support our customers from headhunting to necessary resource servicesmaintaining necessary compliances and organizational requirements.

Customer Name Resource Category

LM Ericsson BD Ltd. Tx LOS Survey, Technical Support Group (TSG) including 2G/3G

Huawei Technologies BD Ltd 2G and 3G Optimization

Robi Axiata BD Ltd RNP

Page 20: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - TI

LM Ericsson BD Ltd - Airtel/Robi Project:

BTS Installation and Commissioning

EGSM

Microwave I Survey, Installation, Commissioning & Testing(Robi & Airtel)

Microwave Installation, Commissioning & Testing (Multivendor)

Page 21: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - TI

Huawei BD Ltd - Grameen Phone and Airtel Project: Site Survey, RF Survey

ANE Supply

BTS swap (Grameen Phone & Airtel)

Expansion & Installation.

Last Mile Delivery

Box & Packaging

Managed Service

Page 22: Corporate Profile CFVL 20140205

SOME SUCCESSFUL PROJECTS - TI

Nokia Siemens Networks BD Ltd - Robi Project:

BTS swap (Robi)

Expansion & Installation. (Robi)

Expansion & Installation. (OTB)

Technical Site Survey .

TRX Addition & Deletion.

Page 23: Corporate Profile CFVL 20140205

OUR HEAD COUNTS AND GROWTH

Year Y2009 Y2010 Y2011 Y2012 Y2013

Employee Qty 55 115 310 168 350

Page 24: Corporate Profile CFVL 20140205

QUALITY AND SERVICE DELIVERY- ASSURED!

• We have industry grade quality control and service deliveryassurance process flow established, where all our Engineersand Technicians are fully trained and monitored.

• We have dedicated customer facing teams and we listen toyou 24/7!

• We ensure from implementation to reporting/documentation, everything are performed with highest levelintegrity and ensuring the best result.

• …..and this is our difference and key-strength to serve you.

Page 25: Corporate Profile CFVL 20140205