correct method of handling and stacking of rails

24
“Correct Method of Handling and Stacking of Railsby Prem Prakash kumar, IRSE ADEN/PKU S.E.Railway

Upload: prem-prakash-kumar

Post on 20-Jan-2017

540 views

Category:

Engineering


3 download

TRANSCRIPT

Page 1: Correct method of handling and stacking of rails

“Correct Method of Handling and Stacking of

Rails”

by Prem Prakash kumar, IRSE

ADEN/PKUS.E.Railway

Page 2: Correct method of handling and stacking of rails

The Rails, being the most vital component of track, require careful handling to achieve desired service life.

Any carelessness in loading, unloading, handling

and laying will not only contribute towards bad running but may cause bending, indentation or damage to the surface ,rendering the rails unserviceable and/or leading to premature failures of rails.

Handling

Page 3: Correct method of handling and stacking of rails

The use of higher UTS rails has been necessitated to meet the requirement of traffic.

Earlier 72 UTS rails were being used in track which were having less hardness and more ductility.

Due to less carbon content (0.45 to 0.60%), the hardness and UTS of 72 UTS rails was less and these were less prone to fracture.

Handling of 90 UTS and HHR

Page 4: Correct method of handling and stacking of rails

But with the introduction of BOXN wagons with cast wheels of higher hardness ,the 72 UTS rails were having alarming wear especially on curves.

To overcome this problem use of 90 UTS and 110 UTS rails started progressively. (carbon content in 90 UTS rails is 0.60 to 0.80%)

…..

Page 5: Correct method of handling and stacking of rails

90 UTS rails are less prone to wear due to more hardness but at the same time more susceptible to fracture.

90 UTS rails, being brittle in nature, are particularly susceptible to sudden fracture from locations of even minor dents /deformity. Hence lot of care has to be exercised in handling of rails at all stages.

......

Page 6: Correct method of handling and stacking of rails

Barely visible straightness variations renders a rail unacceptable and require careful handling and stacking. Therefore,

Avoid Heavy static loading sudden impact Single point slinging Excessive end drop and flange overlap while

lifting or moving

Protection of straightness

Page 7: Correct method of handling and stacking of rails

DOs

Two point slinging for rails up to 13m length. Increase slinging point at the rate of 1 per 6.5m

Keep rails horizontal and straight while lifting/carrying/stacking

Rails to be kept in upright [head up] in straight alignment.

Provide suitable spacer/dunnage to protect rails against point contact.

Page 8: Correct method of handling and stacking of rails

The single point slinging increases risk of excessive bending and surface damage to the rails.

“The overhang beyond outer lifting point should not be greater than one half the distance between lifting points.”

Single point slinging to be avoided. Use two point slinging for rail up to 13 m.

Slinging Principles

Page 9: Correct method of handling and stacking of rails

RAIL LENGTH

(M)

NO. OF LIFTING POINTS

DISTANCE BETWEEN

LIFTING

MAX. RAIL END

OVERHANG (M)

12-13 2 6-6.5 3-3.2526 4 6.5 3.2539 6 6.5 3.25130 20 6.5 3.25260 40 6.5 3.25

Recommended locations of handling points for various rail lengths

Page 10: Correct method of handling and stacking of rails

Materials, whether new or old, lying along side the track is always a potential source of danger and efforts should be made to handle it as per best practices and laid down guidelines.

Instruction regarding unloading and stacking of P. Way materials on Cess have been laid down in Para 310 of IRPWM.

Arrangement for Placement of Rails along the track ,as per Drawing No. RDSO/T-8413

Placement of Rails on Cess along the Track

Page 11: Correct method of handling and stacking of rails

After unloading the rails care should be taken to ensure that there is no infringement and the rails are placed on firm base to eliminate the possibility of their sliding down due to vibrations and infringing the moving dimensions.

Same care should be taken for rails released from the works of rail.

For panel of larger length (say beyond 250 m), special care shall be taken to ensure that the panels do not buckle/distort and infringe the moving dimensions as a result of bad handling and stacking.

Page 12: Correct method of handling and stacking of rails

Use of Wooden Gutka [Multiple line Section]

Page 13: Correct method of handling and stacking of rails

TRR(P) [Wrong Practices]

Page 14: Correct method of handling and stacking of rails

Released Rail [Wrong Practices]

Page 15: Correct method of handling and stacking of rails

Surface notches of even less than 0.75 mm in depth are liable to cause rail fracture in service. Therefore,

Avoid

Impact or abrasion of rails against separators in wagons.

Round link chain slings for securing the rails.

Crossing or flange overlap while stacking or making rail bundles. Suitable spacers to be used while making rail bundles.

Any rail support, handling or clamping device and rail pinch rollers which apply localized or point contact to the rail.

Protection of Rail Surface

Page 16: Correct method of handling and stacking of rails

Dos

Where conventional slings are employed, use of fabric, e.g. polypropylene slings/sleeves is recommended. As an alternative, if flat link chains are used, these should be fitted with fabric sleeves.

Ideally, lift the rails by using electro-magnetic lifting devices

Page 17: Correct method of handling and stacking of rails

Rails are thermally very sensitive and are likely to develop metallurgical defects, if exposed to localized heating, which produces very hard, brittle metallurgical structures which may lead to sudden failure.

Avoid Heating, flame cutting, on or adjacent to rails.Contact with electric arcs and molten metal

splashes ,i.e. from adjacent welding operations . Early removal of mould , inadequate preheating

in welding operations.

Prevention of Metallurgical Damage

Page 18: Correct method of handling and stacking of rails

Rails withstand normal degree of rusting but localised corrosion pitting may cause subsequent rail fracture.

Avoid Contact with injurious substances which cause

high corrosion of steel , i.e. such as acids, alkalis, salts, fertilizers etc.

DOs Stack rails on well drained platform preferably

of concrete base as per Drg. No. RDSO/T-6219

Protection from contact with injurious substances

Page 19: Correct method of handling and stacking of rails

Avoid Overlapping of rail flanges Crossing of layers when dunnage is used Leaning stack by placing rail ends (rails of the

same length) in vertical alignment. Localised point or line contact loading in

stacking Criss-cross stacking of rails of alternative layers

as at right angle as far as possible

Stacking

Page 20: Correct method of handling and stacking of rails

DOsStack rails of same length [as far as possible] on

firm level base of well drained platform providing uniform support, as per Drawing No. RDSO/T-6219.

Each stack of the rail should of the same section and class.

Successive layers may be of the same or decreasing width for stacking of unequal length of rails.

.....

Page 21: Correct method of handling and stacking of rails

Subsequent layers should be separated with uniformly placed suitable spacers or dunnage in vertical alignment with base supports.

Place rails of shorter length in upper layers.

Use of suitable rail handling equipment, such as electromagnetic lifting devices, rail grips etc.

.....

Page 22: Correct method of handling and stacking of rails

Prevalent Practices of Stacking

Page 23: Correct method of handling and stacking of rails

CE Circular No.-246 & 181Para 254,255 & 310 of IRPWMRevised FBW Manual-2012Technical Diary-2014 CT-35:RDSO Guidelines for Handling and

Stacking of Rails

Reference...

Page 24: Correct method of handling and stacking of rails

Thank You