corrections irs bridgecode
TRANSCRIPT
7/22/2019 Corrections IRS Bridgecode
http://slidepdf.com/reader/full/corrections-irs-bridgecode 1/3
No.CBS/Codes/A&C Date :28.03.200629
All Principal Chief Engineers
i) Central Railway, M umbai CST-400 001
ii) Eastern Railway, Fairlie Place, Kolkata-700 001iii) East Central Railway, Hazipuriv) East-Coast Railway, Bhubaneshwar
v) Northern Railway, Baroda House, New Delhi – 110 001vi) North Central Railway, Allahabad
vii) North Eastern Railway, Gorakhpur-273 001viii) North Western Railway, Jaipurix) Northeast Frontier Railway, Maligaon, Guwahati – 781 061x) Southern Railway, Park Town, Chennai –600 003
xi) South Central Railway, Rail Nilayam, Secunderabad – 500 371
xii) South East Central Railway, Bilaspurxiii) South Eastern Railway, Garden Reach, Kolkata – 700 043xiv) South West Railway, Hubli
xv) Western Railway, M umbai – 400 020
xvi) West Central Railway, Jabalpur.
Sub : A&C Slip No. 9 for IRS Concrete Bridge Code regarding ConcreteStrength.
Ref : 1. Rly. Board’s letter No. 2006/CE-I/Br/PPC dt. 08.03.06
*******Vide above referred letter, Railway Board have approved certain modifications in
the provision of for IRS Concrete Bridge Code regarding Portland Pozzolana Cement and
Portland Slag Cement. Addendum & Corrigendum Slip No.9, dt. 27.3.06 incorporatingabove modifications is enclosed herewith for information and necessary action.
Encl : A&C Slip No.9SD/-
(Lalloo Singh)Executive Director / B&S
Government of India-Ministry of RailwaysResearch Designs & Standard organization
Lucknow - 226011
7/22/2019 Corrections IRS Bridgecode
http://slidepdf.com/reader/full/corrections-irs-bridgecode 2/3
Government of IndiaMinistry of Railways
INDIAN RAILWAY S TANDARD CODE OF PRACTIC E FORPLAIN, REINFORCED AND PRESTRESS ED CONCRETE
FOR GENERAL BRIDGE CONSTRUCTION(CONCRETE BRIDGE CODE)
First Adopted –1936First Revision –1962
Second Revision –1997
ADDENDUM & CORRIGENDUM SLIP NO.9 Dated 27.3.06
1. Amend the following clauses as follows:
4.1.1 f) Replace “(See Note 1 & 4)” with “(See Note 1,4,5 & 6)”
g) Replace “(See Note 2 & 4)” with “(See Note 2,4, 5 & 6)”
4.1.1 NOTE 1 : Replace existing contents of Note 1 with the following:
“M ixing of 50% blast furnace slag with OPC cement at site shall not normally be
permitted. However, in except ional cases for bridges requiring higher levels of
durability using blended cement which is not available from manufacturersblending at site may be permitted subject to ensuring dedicated facilities and
complete mechanized process control to achieve sp ecified quality with the special
permission of Chief Engineer/Chief Bridge Engineer”.
4.1.1 NOTE 2: Replace existing contents of Note 2 with the following:
“Portland Pozzolana cement shall not be used for PSC works. When Portland
Pozzolana cement is used in plain and reinforced concrete, it is to be ensured that
proper damp curing of concrete at least for 14 days and supporting form work
shall not be removed till concrete attains at least 75% of the design strength”.
7/22/2019 Corrections IRS Bridgecode
http://slidepdf.com/reader/full/corrections-irs-bridgecode 3/3
-2-
Add Notes 5 & 6 below Note 4
Note 5: Compatibility of chemical admixtures and super plasticizers with Portland
Pozzolana cement and Portland blast furnace slag cement shall be ensured by
trials before use.
Note 6: Some other properties of concrete such as modulus of elasticity, tensile
strength, creep and shrinkage are not likely to be significantly different. For
design purposes, it will be sufficiently accurate to take the same value as thoseused for concrete made with OPC.
BY ORDER
SD/-
(Lalloo Singh)
Executive Director/B&SLUCKNOW
Dated: 27.3.2006