  • 8/8/2019 Corrigendum - SSDG TN 27.05

    1/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    CORRIGENDUM- 1

    SELECTION OF IMPLEMENTING AGENCY (IA)

    (FROM ALREADY EMPANELLED IMPLEMENTING AGENCIES)

    FOR

    IMPLEMENTING ELECTRONIC FORMS APPLICATION THROUGH STATEPORTAL AND STATE SERVICE DELIVERY GATEWAY

    IN

    THE STATE OF TAMIL NADU, INDIA

    DATE: 27/05/2010

    ISSUED BY

    Tamil Nadu e-Governance Agency (TNeGA)

    TUFIDCO-POWERFIN BUILDING

    490, ANNA SALAI, NANDANAM

    CHENNAI - 600035

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    2/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    S.No RFP Clause No Description Existing Clause

    1 Volume 1 - 1.2 (7)

    & Volume 2

    Critical Information

    (7)

    Last date (deadline)

    for receipt of

    proposals in

    response to RFP

    notice

    21/05/2010 upto 3PM 14/06/2010

    2 Volume 1 1.2(8)

    & Volume 2

    Critical Information

    (8)

    Place, Time and

    Date of opening of

    Technical proposals

    received in response

    to the RFP notice

    21/05/2010, 3:30 PM 14/06/2010

    mentioned a

    3 Volume 1- 2.2.5 Gap Infrastructure The gap infrastructure in the form of

    Connectivity (except the bandwidth

    from the telecom service provider)

    and Computing Infrastructure shall

    be provided by the Implementing

    Agency at the departmental

    locations across the State so as tofacilitate delivery of services from

    respective State departments office,

    The gap i

    Connectivit

    Infrastructu

    Implementi

    locations ac

    delivery of

    departmentsrequests rai

    Forms on th

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    3/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    in response to the requests raised

    through filled in Electronic Forms

    on the State Portal.

    4 Volume 1 4.5 (iii) CDAC CDAC shall provide the training for

    Implementation Agencies at various

    levels such as overview,

    administration and trouble shooting

    of SSDG

    CDAC wi

    Implementa

    Deploymen

    5 Volume 1 4.5 (vi)

    to be included

    CDAC n/a CDAC will

    support for

    operations

    SSDG co

    application

    the suppor

    responsibili

    6 Volume 1 11 Project

    Implementation

    Schedule

    Refer Anne

    Implementa

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    4/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    7 Volume 1 14 (iii) Penalty &

    Liquidated Damages

    The time Schedule for the entire

    project is as detailed in this RFP.

    In case of any delay solely on

    account of the Implementing

    Agency, a penalty of 10% on the

    project value will be imposed for

    delay of every 4 weeks and thereof

    subject to a maximum of 12

    weeks.

    The time

    is as detai

    delay so

    Implemen

    2.5% on t

    be additio

    the projec

    days subje

    8 Volume 1- 14 (iv) Penalty &

    Liquidated Damages

    Beyond a delay of 12 weeks,

    TNeGA reserves the right to

    terminate the contract and select

    an alternate Implementing Agency

    to carry out the balance work

    Beyond a

    reserves

    contract

    Implemen

    balance w

    9 Volume 1 16 Service Level

    Requirements

    Errata for

    sub claus

    renumber

    10 Volume 1- 17 Governance Errata fo

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    5/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    occurring

    17.1 to 17

    11 Volume 1 16 in

    clause 16.2 as so

    renumbered

    Deployment SLR

    16.2 (iv)

    16.2 (v)

    Expressio

    end shall

    Expressio

    occurring

    12 Volume 1 16 in

    clause 16.2 as so

    renumbered

    Deployment SLR

    matrix S.No 6

    Lower performance Penalty - 10%

    of the total project value

    Breach Penalty - 20% of the total

    project value

    Lower pe

    5% of the

    Breach P

    project va

    13 Volume 1 16 in

    clause 16.2 as so

    renumbered

    Deployment SLR

    matrix S.No 7

    Breach Penalty - 20% of the value

    quoted for the same

    Breach P

    quoted fo

    14 Volume 1 16 in

    clause 16.2 as so

    renumbered

    Deployment SLR

    matrix S.No 9

    Project sign off and

    Launch

    Lower Performance Metric -

    Greater than 180 days and upto 200

    days

    Lower Performance Penalty - 10%

    of the total project valueBreach Metric - Greater than 200

    days and upto 220days

    Breach Penalty - 20% of the total

    Lower Per

    than 180 d

    Lower Per

    total projecBreach Me

    and upto 2

    Breach Pen

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    6/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    project value

    Greater than 220 days - Termination

    of contract

    value

    Greater tha

    contract

    15 Volume 1

    Annexure 4

    Indicative Bill of

    Materials

    Indicative Minimum specifications

    for Gap Infrastructure

    Refer Anne

    specificatio

    16 Volume 1

    Annexure 4

    (S.No.4)

    Indicative Bill of

    Materials for Gap

    Infrastructure

    1 KVA True Online UPS Replaced wi

    with 1 hour b

    17 Volume 1

    Annexure 4 (S.No

    6) to be included

    Indicative Bill of

    Materials for Gap

    Infrastructure

    1 KVA True Online UPS Refer Annex

    The online u

    optional quo

    summary of

    evaluation pu

    18 Volume 1

    Annexure 4

    Indicative Bill of

    Materials

    Minimum Hardware specifications

    SSDG Hardware Stack

    Refer Anne

    Hardware s

    Hardware S

    19 Volume 1

    Annexure 4

    Indicative Bill of

    Materials

    Minimum Hardware specifications

    State Portal

    Refer Anne

    Hardware s

    20 Volume 2 1.15 Sealing and Marking DO NOT OPEN BEFORE 15:30 DO NOT O

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    7/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    of Bids hours on 21.05.2010 on 14.06.20

    21 Volume 2 1.18 Deadline for

    submission of Bid

    Bids must be received by TNeGA at

    the address specified, not later than

    15:00 hrs on 21.05.2010

    Bids must b

    address spe

    on 14.06.20

    22 Volume 2 3.3 Evaluation Criteria Refer Anne

    criteria

    23 Volume 2 5.2.8

    (ii)

    Arbitration In the event of any dispute or

    differences arising under these

    conditions or any special conditions

    of the contract in connection with

    this contract, the same shall be

    referred to the Secretary to

    Government, Information

    Technology Department, GoTN for

    final decision and the same shall be

    binding on all parties.

    In the even

    arising und

    special co

    connection

    implementa

    and selecte

    resolve issu

    based on te

    MSA. If n

    then the s

    Secretary

    Technology

    suitable dec

    un resolve

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    8/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    escalated f

    Project Co

    which shall

    24 Volume 2

    Annexure 9

    Financial Proposal

    Submission Formats

    Consolidated cost

    Summary

    Format for Consolidated Cost

    Summary

    Format mod

    in this corr

    format prov

    corrigendum

    25 Volume 2

    Annexure 9 Table

    1

    Financial Proposal

    Submission Formats

    Table 1 : Format for Financial Quote

    for Hardware Supply for SSDG

    Stack including warranty and

    maintenance

    To be quote

    Annexure 6

    26 Volume 2

    Annexure 9 Table

    6

    Financial Proposal

    Submission Formats

    Table 6: Format for Financial Quote

    for Development of electronic forms

    To be quote

    Annexure 7

    27 Volume 2

    Annexure 9- Table

    7

    Financial Proposal

    Submission Formats

    Table 7: Format for Financial Quote

    for Training and Workshops

    To be quote

    Annexure 8

    28 Volume 2-

    Annexure 9 Table

    9 (4)

    Format for Financial

    Quote for

    Operations and

    S.No. 4 Help Desk S.No 4. Rem

    in a separat

    per the form

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    9/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    Support this corrigen

    included as

    Annexure 9

    29 Volume 2

    Annexure 9 Table

    10

    Format for

    Technical

    compliance

    Any change

    Requiremen

    mentioned i

    form a part

    sheet menti

    30 Annexure to

    Volume 2 MSA

    Clause 19 (2), (3),

    (4), (6)

    Dispute Resolution The expression State e gov group The express

    shall be sub

    31 Annexure to

    Volume 2 MSA

    Clause 9 (iii) & (iv)

    Liquidated Damages Changes ma

    changes ma

    clause 4 (iii

    S.No. 7 & 8

    32 Annexure to

    Volume 2 MSA Clause 19 (2)

    Dispute Resolution For the expression NeGP The express

    substituted

    33 Annexure to Dispute Resolution The Government of Tamil Nadu The disput

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    10/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    Volume 2 MSA

    Clause 19 (7)

    shall nominate sole Arbitrator for

    purpose of the arbitration

    proceedings.

    arbitrators,

    party and th

    an umpire

    the referen

    arbitration

    as the case

    parties, ma

    making and

    34 Annexure to

    Volume 2 MSA

    24

    Appendix B :

    Timelines

    Changes m

    changes ma

    as mentione

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    11/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    10

    IMPORTANT NOTICE:

    This Corrigendum & the Annexure forms part of the Original RFP Document

    Changes made to the RFP as mentioned under S.No 1 to 29 of the corrigendum above

    shall mutatis mutandis apply to MSA as well wherever similar provisions exists

    All other terms and conditions remains un altered

    Chief Executive Officer

    Tamil Nadu e-Governance Agency

    Enclosures

    Annexures

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    12/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    11

    ANNEXURE 1 Project Implementation Schedule

    Stage Activity / MilestoneTimelines (Calendar

    Days)

    I Issuance of LOA D=0 ( Start Date)II Execution of Agreement D+7

    III Kick off Meeting D+9

    IV Assessment and validation of physical infrastructure

    assets at SDC / SWAN PoC and Gap Infrastructure

    details from the point of view of installation of IT

    hardware for Portal and SSDG

    D+15

    V Supply , of Hardware, System Software, peripherals

    and other accessories to the State HQs & customer

    premises

    D+45

    VI Conversion of Physical forms to e-forms D+60

    VII Application Development for e-Forms D+60

    VA Installation of Infrastructure at State Headquarters D+75

    VB Installation and commissioning of Hardware , System

    Software, Peripherals and other accessories

    D+75

    VC Network Broad Band connectivity for all Locations D+75

    VIII Security Implementation D+80

    IX Design , Documentation and Manuals for end users D+100

    X Development of State Portal by NIC D1=D+80 = 80

    XI Integration with State Portal D1 + 20 = 100

    XII User Acceptance Test D1 + 50 = 130

    XIII Training D1 + 80 = 160

    XIV Project Sign off D2=D1 + 100 = 180

    XV Quality Certification D3 = D2 + 30

    XVI QC feedback incorporation and re certification if

    required

    D3+15

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    13/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    12

    ANNEXURE 2 Indicative Minimum specifications for Gap Infrastructure

    I. Desktop computer system, Configuration with3years onsite comprehensive warrantyfrom the

    date of commissioning

    S.No Item Code Description Specification

    1.1 GI /CPU 001 CPU & Chipset Intel Core 2 Duo Processor E7500 and above (2.93

    Ghz, 3 MB L2 cache, 1066 Mhz. FSB) with an

    overall score of 155(+/_ 2) using sysmark 2007,

    Intel 4 series chipset or better in performance /

    NVIDIA / ATI

    1.2 GI /CPU 002 Motherboard ( Intel /

    Gigabyte/ASUS/MSI/MNC

    OEM)

    2 PCI and 1 PCI Express X16. Integrated Graphics

    Controller, 10/100/1000 MBps, Network card with

    remote booting facility

    1.3 GI /CPU 003 Memory 1 x 2 GB DDR2 SDRAM @ 800 MHz up gradable

    upto 4 GB or higher

    1.4 GI /CPU 004 Hard Disk Drive 500 GB or higher SATA HDD / 2x 250 GB or

    higher SATA HDD

    1.5 GI /CPU 005 Monitor 19 TFT (+/_ 0.5 inch) TFT / Wide LCD Colour

    monitor. Resolution 1440 x 900 : Response time 5

    ms

    1.6 GI /CPU 006 Keyboard USB / PS2 Mechanical Keyboard OEM /

    TVSE or High Quality OEM Membrane keyboard

    1.7 GI /CPU 007 Mouse Optical Mouse with Mouse Pad

    1.8 GI /CPU 008 Bays 3 Bays or more

    1.9 GI /CPU 009 Ports 1 Serial Port, 6 USB Port (2 in front), 1 Parallel

    Port & 2 PS 2 Port or 2 additional USB ports

    1.10 GI /CPU 010 Cabinet Mini tower type / Desktop Systems

    1.11 GI /CPU 011 DMI DMI 2.0 Compliance and Support

    1.12 GI /CPU 012 Networking features 10/100/1000 Network Card with remote booting

    facility, remote system installation Asset

    tracking and security management, remote shut

    down and wake up

    1.13 GI /CPU 013 Power Energy star compliance 5.0, Screen blanking,

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    14/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    13

    Management hard Disk and System Idle Mode in Power On,

    Set up Password, Power Supply Surge protected

    1.14 GI /CPU 014 Preloaded software Norton, McAfee or equivalent antivirus (Latest

    version) or equivalent AV for Linux

    1.15 GI /OS 015 Operating

    System

    LINUX Desktop OS preloaded with media and

    documentation and certificate of authenticity

    (BOSS or equivalent)

    2 GI /LP 016 Laser Printer Print Speed 25 ppm, Mono Laser Printer up to

    effective 1200 resolution (1200 x 600 DPI )

    Input Capacity-Upto 250 sheets

    Duplex printing (printing on both side of paper)-

    Automatic (Standard)

    Paper handling- Single sheet multipurpose input

    slot 250 sheet input tray

    Media type paper, envelop, labels, cardstock,

    transparencies, heavy media

    Memory-32MB

    Connectivity Std- USB 2.0 compatible port/ IEEE

    1284-B complaint parallel port, 10/100 Ethernet

    Port or higher

    Inbuilt Processor (400 mhz /more)

    A4 size, 25.ppm. Duplex.

    3 GI /SN 017 Scanner

    TWAIN Compliant

    Up to 3600 dpi

    Interfaces: Hi-Speed USB (compatible with USB

    2.0 specifications)

    Task speed: 4 x 6-in color photo to file: about 10

    sec for multiple image scan, about 31 sec for single

    image scan; OCR 8.5 x 11-in text to Word or open

    source: about 33 sec; 4 x 6-in color photo to

    share/e-mail; about 34 sec for single image scan

    4 GI /UP 018 1.0KVA Line InteractiveUPS with 1 hour back

    up

    Type: MOSFET / IGBT; Input : Voltage Mains-

    150 270 V AC, Single phase; Frequency with

    Tolerance 50 Hz, +/- 3% ; Battery- Sealed

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    15/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    14

    ISO Quality Certified maintenance free SMF type ( AH and no of

    batteries shall be suitably selected for the required

    back up time at 600 W resistive load or 1.0 KVA

    load with 0.6 PF. The details are to be specified by

    the tenderer along with the make of the battery, no

    of batteries and voltage & AH of each battery;

    Battery Storage Box- External battery storage box

    for batteries with safety provisions to be supplied

    along with the UPS system, if batteries are not

    provided inside the UPS system. Output

    Nominal Voltage 220 V AC , Single phase (+/-

    10%) with voltage regulation 198 V to 242 V ,

    Frequency 50 Hz +/- (0.2) Hz, Waveform

    Quasi/Pure sine wave with transfer time 4-6 msec

    with load power factor 0.6 lag to unity.

    Automatic voltage regulator to be provided.

    Protections Fuses for input, Overload,

    over/under voltage, short circuit, battery reverse

    and Lightening protection

    5 GI/LAN/022 LAN Cabling &

    Accessories

    CAT 6e cable, Cat 6-I/O outlet with SMB, CAT6 3

    feet /7 feet patch cord,CAT6 24 port patch panel,

    6U rack / 9U rack wall mount, 16 / 24 port

    unmanageable switch 10/100 mbps, 24 port

    manageable switch, cable laying, & 20mm

    conduit/channel

    6 GI/ UP / 019

    (Optional)

    True Online UPS 1 KVA

    With 1 hour back up

    ISO Quality Certified

    Capacity 1.0 KVA True Online UPS. Type :

    MOFSET/IGBT(make and current capacity to be

    specified); INPUT Mains Voltage Regulation:

    150-270 V AC, Single Phase, Input power factor:

    >0.9; Frequency with tolerance: 50Hz +/- 3Hz;

    Battery: Sealed maintenance free (SMF) AH and

    No of Batteries shall be suitably selected for the

    required back up time at 700w resistive load or 1.0

    KVA load with 0.7 PF. The details are to be

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    16/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    15

    specified along with the make of the battery; DC

    Bus Voltage: to be specified by the tenderer. Make

    of the Battery: Reputed brand only to be quoted.

    Specify the manufacturer make , model and enclose

    technical sheet; Battery Storage Box / Rack :

    External battery storage box for the batteries with

    safety provisions to be supplied along with the

    UPS system; Output : Nominal Voltage 230 V

    AC single phase (+/_ 1%); Voltage Regulation: +/-

    1%; Frequency: 50 Hz, +/- (0.2)Hz; Waveform

    Pure Sinewave; Load Power Factor 0.7 lag to

    unity

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    17/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    16

    ANNEXURE 3:Minimum Hardware Specifications SSDG Hardware Stack

    S.No Description Quantity

    1 Blade Servers Chassis 2

    2 Blades Dual CPU Blade 83 Tape Drive with Backup Software 1

    4 Rack Mount Server (Single CPU) for storage 1

    5 Rack 1

    6 Switch 1

    7 Rack Mount Server ( Single CPU) for LB rack 2

    S.No Item Code Component Required Minimum specifications

    1 Blade Server Chassis

    1.1 SSDG/BSC/001 Chassis Blade Chassis to accommodate a

    minimum of 10 hot pluggable and hot

    swap half size blades with SAS HDD.

    1.2 SSDG/BSC/002 Ethernet Switch Chassis should support Redundant

    Ethernet Switch Modules -having

    minimum 2 uplink ports each.

    (Internally connecting all processor

    blades).

    1.3 SSDG/BSC/003 Management

    Module

    Should be able to Manage, Administer

    and Monitor through Network. A

    redundant management module is also

    required in the blade center chassis. It

    should also have capabilities to

    manage servers remotely.

    1.4 SSDG/BSC/004 Power Modules 100% redundancy on power supplies to

    be provided inside the Blade Chassis.

    1.5 SSDG/BSC/005 Cooling 100% Redundant Cooling to be

    provided inside the Chassis.

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    18/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    17

    1.6 SSDG/BSC/006 Management

    Software

    The software should be from OEM

    itself.

    Note: The chassis should support minimum 10 half size servers.

    2 Blades Dual CPU Blade

    2.1 SSDG/DCB/007 Processor X86_64 architecture, 2 (socket) X

    multi-core (quad core or more) with

    minimum 2 GHz clock speed and 1066

    MHz FSB or more.

    2.2 SSDG/DCB/008 Memory 16 GB, PC2-5300 or higher speed

    DDR2 fully buffered DIMMs with

    ECC. Expandability to a minimum of

    32 GB

    2.3 SSDG/DCB/009 Chipset Intel 5000 sequence or higher

    2.4 SSDG/DCB/010 HDD 2 * 146 GB 10K/15K hot-swappable

    SFF SAS Drive

    2.5 SSDG/DCB/011 Controller Dual Channel SAS Controller with

    RAID 1 inbuilt.

    2.6 SSDG/DCB/012 Networking Dual Gigabit Ethernet Controller/ full

    duplex

    2.7 SSDG/DCB/013 External Ports 2 USB, Graphics

    2.8 SSDG/DCB/014 Power supply Enclosure-based power

    2.9 SSDG/DCB/015 Operating systems

    support

    The hardware should support Red Hat

    Enterprise Linux v5 x86_64

    (Advanced Platform)

    3 Tape Drive with SCSI Controller

    3.1 SSDG/TD/016 Technology LTO3/ LTO4

    3.2 SSDG/TD/017 Form Factor Preferably Rack Mountable with rack

    mount accessories

    3.3 SSDG/TD/018 Capacity 2 TB (Native) & 4TB GB

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    19/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    18

    (Compressed)

    3.4 SSDG/TD/019 Interface Ultra320 SCSI controller to connect

    the drive to the server specified in Item

    1

    3.5 SSDG/TD/020 Management

    Software

    Bundled with the drive

    3.6 SSDG/TD/021 Operating System

    support

    The hardware should support Red Hat

    Enterprise Linux v5 x86_64

    (Advanced Platform)

    3.7 SSDG/TD/022 Backup Software Licensed copy of the backup software

    for the drive offered. Backup Software

    (licensed) should support PostgreSQL

    on Linux.

    3.8 SSDG/TD/022 Color Matching with the servers

    3.9 SSDG/TD/023 Cleaning cartridge One cartridge must be included in the

    offer.

    3.10 SSDG/TD/024 Data Cartridge Five cartridges of 1 TB native capacity

    must be included in the offer

    Note: The requirements given are the minimum for storage.

    4 Rack Mount Server (Single CPU) for Storage

    4.1 SSDG/RMS/025 Processor X86_64 architecture, 2 (socket) X

    multi-core (quad core or more) with

    minimum 2 GHz clock speed and 1066

    MHz FSB or more.

    4.2 SSDG/RMS/026 Chipset Intel 5000 sequence or higher

    4.3 SSDG/RMS/027 Memory 8 GB, PC2-5300 or higher speed

    DDR2 fully buffered DIMMs with

    ECC. Expandability to a minimum of

    32 GB

    4.4 SSDG/RMS/028 Disk Drives 5 x 1000GB SAS 7200 or higher RPM

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    20/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    19

    SFF SP HDD

    4.5 SSDG/RMS/029 Disk bays Minimum 8 hot-swappable hard disk

    drive bays

    4.6 SSDG/RMS/030 Disk Controller SAS controller supporting 3Gb data

    transfer speed and RAID 0, 1, 1+0, 5

    with 256MB cache support.

    4.7 SSDG/RMS/031 Networking Dual Gigabit Ethernet Controller/ full

    duplex

    4.8 SSDG/RMS/032 External Ports USB, Serial, Graphics, Management

    port

    4.9 SSDG/RMS/033 Power Supply Hot swap Power Supply with

    Redundant Power Supply

    4.10 SSDG/RMS/034 Operating systems

    support

    The hardware should support Red Hat

    Enterprise Linux v5 x86_64

    (Advanced Platform)

    4.11 SSDG/RMS/035 Display Controller On-board Graphics controller with

    minimum 8-MB Video memory

    4.12 SSDG/RMS/036 Combo drive CD-RW/DVD-ROM

    Note: The Server is required as SAN

    5 Server Rack

    5.1 SSDG/SR/036 42U OEM Adequate Rack For the

    installation of Servers, tape Library,

    Switches and other rack mounted

    equipments

    5.2 SSDG/SR/037 PDU 2 Power Distribution Unit and bars for

    rack equipment.

    5.3 SSDG/SR/038 Extras Should include cable management

    equipment to incorporate network, and

    power cables.

    5.4 SSDG/SR/039 Dimension Should support installation of supplied

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    21/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    20

    hardware mentioned in this offer.

    6 Switch

    6.1 SSDG/SW/040 Make Must be specified

    6.2 SSDG/SW/041 Model Must be specified

    6.3 SSDG/SW/042 Number of ports

    and Interface

    24 Gigabit Ethernet UTP ports +

    Gigabit SFP slot for fiber connection

    6.4 SSDG/SW/043 Switching Speed 48 Gbps, non-blocking

    6.5 SSDG/SW/044 MAC addresses 8000 or more

    6.6 SSDG/SW/045 VLANs 256 or more (IEEE 802.1Q)

    6.7 SSDG/SW/046 SNMP Should support SNMP Version v1,v2c,

    v3 & RMON

    6.8 SSDG/SW/047 Security Features IEEE 802.1X

    MAC based access control

    Link Aggregation

    Spanning Tree Protocol (IEEE 802.1D)

    IGMP Snooping, Storm Control

    6.9 SSDG/SW/048 Management Should be SNMP manageable.

    Should support RMON

    Should support Firmware Upgrade

    Should support port mirroring

    6.10 SSDG/SW/049 Standards /

    Features

    Full Duplex Operation, Spanning Tree

    Protocol

    Network Login (web-based

    DHCP/HTTP/RADIUS mechanism)

    4 QoS queues/port

    9216 Byte maximum packet size

    (Jumbo Frame)

    MAC Address based Filtering Support

    Link Aggregation using IEEE 802.3ad

    Flow Control (IEEE 802.3X)

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    22/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    21

    Traffic prioritization (IEEE 802.1p)

    6.11 SSDG/SW/050 Power Supply Internal power supply

    6.12 SSDG/SW/051 Rack mounting

    Accessories

    Must be included in the offer.

    6.13 SSDG/SW/052 Device

    management

    software

    Standard software bundled along with

    the switch must be included in the

    offer

    6.14 SSDG/SW/053 Console cable Must be included in the offer.

    6.15 SSDG/SW/054 Documentation Original documentation in the form of

    Hard Copy / CDs must be included in

    the offer.

    7 Rack Mount Server (Single CPU) for LB

    7.1 SSDG/

    RMS/LB/055

    Processor X86_64 architecture, 2 (socket) X

    multi-core (quad core or more) with

    minimum 2 GHz clock speed and 1066

    MHz FSB or more.

    7.2 SSDG/RMS/LB/056

    Chipset Intel 5000 sequence or higher

    7.3 SSDG/

    RMS/LB/057

    Memory 4 GB, PC2-5300 or higher speed

    DDR2 fully buffered DIMMs with

    ECC. Expandability to a minimum of

    32 GB

    7.4 SSDG/

    RMS/LB/058

    Disk Drives 2 x 500GB SAS 7200 or higher RPM

    SFF SP HDD (hot swappable)

    7.5 SSDG/

    RMS/LB/059

    Disk Controller SAS controller supporting 3Gb data

    transfer speed and RAID 0, 1, 1+0 with

    256MB cache support.

    7.6 SSDG/

    RMS/LB/060

    Networking Dual Gigabit Ethernet Controller/ full

    duplex, SSL Card with SSL

    acceleration s/w and necessary drivers

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    23/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    22

    7.7 SSDG/

    RMS/LB/061

    External Ports USB, Serial, Graphics, Management

    port

    7.8 SSDG/RMS/LB/062

    Power Supply Hot swap Power Supply with

    Redundant Power Supply

    7.9 SSDG/

    RMS/LB/063

    Operating System

    Support

    The hardware should support Red Hat

    Enterprise Linux v5 x86_64 (Advanced

    Platform)

    7.10 SSDG/

    RMS/LB/064

    Display Controller On-board Graphics controller with

    minimum 8-MB Video memory

    7.11 SSDG/RMS/LB/065

    Combo Drive CD-RW/DVD-ROM

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    24/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    23

    ANNEXURE 4 : Minimum Hardware specifications State Portal

    S.No Item Code Required Minimum specifications

    1 Web/Portal & CMS Servers (Production) 4 Nos

    1.1 SP/CMS/001 2U Rack Mountable

    1.2 SP/CMS/002 Two no. of quad core 64bit high-end processor, 2.8 Ghz or higher

    1.3 SP/CMS/003 64 GB RAM with ECC, expendable up to 128GB

    1.4 SP/CMS/004 5 X 300GB SAS SFF Hot pluggable disk drives

    1.5 SP/CMS/005 5-Port SAS RAID Controller having 128 MB buffer memory with

    battery backup and supporting RAID level 0,1 & 5.

    1.6 SP/CMS/006 Integrated Four port 10/100/1000 Base T Ethernet Controller, auto

    sense, full duplex with RJ45 connector on 2 separate controllers

    1.7 SP/CMS/007 Integrated on-board video controller with 16MB memory.

    1.8 SP/CMS/008 Ports: 1 xSerial Port, 1 xVGA, 5 xUSB, 4xRJ45, 1x Management

    port, KBD & Mouse through USB port.

    1.9 SP/CMS/009 Dual port HBA card configurable for 4 Gbps per port along with

    two no. of 5 meter Optical fiber (multimode) LC to LC cables.

    1.10 SP/CMS/010 One internal DVD Writer

    1.11 SP/CMS/011 Redundant (1+1), hot swappable Power Supply.

    1.12 SP/CMS/012 Dedicated port for Hardware Based, OS independent out of band

    remote management.

    1.13 SP/CMS/013 Server Management Features: Remote Management of the Server

    over LAN, Server Health Logging, and System Management

    software bundled in media.

    1.14 SP/CMS/014 OS Support : Linux (Enterprise) Server

    1.15 SP/CMS/015 5 years on Site Comprehensive Warranty with 99.95 % up time.2 Database Servers (Production) 2 Nos

    2.1 SP/DS/016 2U Rack Mountable

    2.2 SP/DS/017 Two no. of quad core 64bit high-end processor 2.8 Ghz or higher

    2.3 SP/DS/018 32 GB RAM with ECC, expendable up to 64 GB

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    25/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    24

    2.4 SP/DS/019 5 X 300GB SAS SFF Hot pluggable disk drives

    2.5 SP/DS/020 5-Port SAS RAID Controller having 128 MB buffer memory with

    battery backup and supporting RAID level 0,1 & 5.

    2.6 SP/DS/021 Integrated Four port 10/100/1000 Base T Ethernet Controller, auto

    sense, full duplex with RJ45 connector on 2 separate controllers

    2.7 SP/DS/022 Integrated on-board video controller with 16MB memory.

    2.8 SP/DS/023 Ports: 1 xSerial Port, 1 xVGA, 5 xUSB, 4xRJ45, 1x

    Management port, KBD & Mouse through USB port.

    2.9 SP/DS/024 Dual port HBA card configurable for 4 Gbps per port along with

    two no. of 5 meter Optical fiber (multimode) LC to LC cables.

    2.10 SP/DS/025 One internal DVD Writer

    2.11 SP/DS/026 Redundant (1+1), hot swappable Power Supply.

    2.12 SP/DS/027 Dedicated port for Hardware Based, OS independent out of band

    remote management.

    2.13 SP/DS/028 Server Management Features: Remote Management of the Server

    over LAN, Server Health Logging, and System Management

    software bundled in media.

    2.14 SP/DS/029 OS Support : Linux (Enterprise) Server

    2.15 SP/DS/030 5 years on Site Comprehensive Warranty with 99.95 % up time.

    3 Web/Portal, CMS, Database Servers (Staging) 3 Nos

    3.1 SP/STG/031 2U Rack Mountable

    3.2 SP/STG/032 Two no. of quad core 64bit high-end processor 2.8 Ghz or higher

    3.3 SP/STG/033 32 GB RAM with ECC, expendable up to 64 GB

    3.4 SP/STG/034 5 X 300GB SAS SFF Hot pluggable disk drives

    3.5 SP/STG/035 5-Port SAS RAID Controller having 128 MB buffer memory with

    battery backup and supporting RAID level 0,1 & 5.3.6 SP/STG/036 Integrated Four port 10/100/1000 Base T Ethernet Controller, auto

    sense, full duplex with RJ45 connector on 2 separate controllers

    3.7 SP/STG/037 Integrated on-board video controller with 16MB memory.

    3.8 SP/STG/038 Ports: 1 xSerial Port, 1 xVGA, 5 xUSB, 4xRJ45, 1x Management

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    26/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    25

    port, KBD & Mouse through USB port.

    3.9 SP/STG/039 Dual port HBA card configurable for 4 Gbps per port along with

    two no. of 5 meter Optical fiber (multimode) LC to LC cables.

    3.10 SP/STG/040 One internal DVD Writer

    3.11 SP/STG/041 Redundant (1+1), hot swappable Power Supply.

    3.12 SP/STG/042 Dedicated port for Hardware Based, OS independent out of band

    remote management.

    3.13 SP/STG/043 Server Management Features: Remote Management of the Server

    over LAN, Server Health Logging, and System Management

    software bundled in media.

    3.14 SP/STG/044 OS Support : Linux (Enterprise) Server

    3.15 SP/STG/045 5 years on Site Comprehensive Warranty with 99.95 % up time.

    4 Additional Items Required

    4.1 SP/ADI/046 Two 42U Rack with 2 power strips each

    4.2 SP/ADI/047 Two 8 Port KVM Switch with accessories ( KB, Mouse, Cable

    Harness etc) Rack Compatible

    4.3 SP/ADI/048 Two 17 inch TFT Monitor(Foldable), 2key boards/mouse(rack

    compatible)

    4.4 SP/ADI/049 Layer 2 Manageable Ethernet Switch with 24 Ports

    4.5 SP/ADI/050 Rack mountable NAS Space required : 2 TB (usable capacity)

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    27/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    26

    ANNEXURE 5 : Evaluation Criteria

    S.No Evaluation Criteria Marks Total

    Project Experience

    Understanding the Scope of Work 5

    Satisfactory performance of ICT projects undertaken

    currently under NeGP/ MMP/State e-Governance Projects10

    1

    Government Projects experience in State / Central in the

    areas of Gap Infrastructure, Business Process

    Reengineering, Capacity Building

    5

    20

    Project Implementation Plan

    Detailed implementation plan including Hardware

    deployment, Software development, Network

    Management , Logistics , development & deployment of

    eforms, Management of Content services, coordination

    and synchronization plans with various stake holders for

    State Portal, eforms, CSP etc

    10

    2

    Quality Systems and Approach to Risk Identification and

    Mitigation

    5

    15

    Approach and Methodology3

    Approach and Methodology for Project Management,

    Project Transition, Team Management, Handover and Exit

    Management

    15

    15

    Resource Deployment

    Team Composition for Project Implementation, Training,

    Application Development, Support Services,10

    4

    Project Management Team Qualifications and

    Experience10

    20

    5 Training Implementation Plan 5 5

    6 Responsiveness to Technical Requirements and SLA 15 15

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    28/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    27

    Implementation and Management methodology

    proposed

    7 Presentation 10 10

    Total 100

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    29/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    ANNEXURE 6 : Format for Financial Quote for Hardware Supply for SSDG Stack including w

    S.No Item Code Equipment OEMMake/

    Version

    Unit

    Rate

    (In Rs.)

    No o

    Unit

    1 SSDG/BSC/001 to

    SSDG/BSC/006Blade Server Chassis

    2

    2 SSDG/DCB/007 to

    SSDG/DCB/015Blades- Dual CPU Blades

    8

    3 SSDG/TD/016 to

    SSDG/TD/024

    Tape Drive with Backup

    Software

    1

    4 SSDG/SW/040 to

    SSDG/SW/054

    Switch1

    5 SSDG/RMS/025 to

    SSDG/RMS/036

    Rack Mount Server (Single

    CPU) for Storage

    1

    6 SSDG/SR/036 to

    SSDG/SR/039Rack

    1

    7 SSDG/ RMS/LB/055

    to SSDG/

    RMS/LB/065

    Rack Mount Server (Single

    CPU) for LB

    2

    Total Cost for SSDG Stack (In Rs.)

    Amount in Words : Indian Rupees

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    30/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    29

    ANNEXURE 7: Table 6: Format for Financial Quote for Development of electronic

    forms

    S.No Description Unit Cost Qty* Cost

    (Rs.)

    Applicable

    Taxes

    Total

    Cost

    (Rs.)

    1 Cost of development of one

    electronic form containing

    upto 30 fields

    30

    2 Cost of development of one

    electronic form containing

    more than 30 fields

    30

    Total

    Amount in Words: Indian Rupees

    * The Nos mentioned above is for evaluation purposes. The actual number of forms

    to be developed would be decided during the time of implementation and the unit

    cost would be considered

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    31/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    ANNEXURE 8: Table 7: Format for Financial Quote for Training and Work

    S.No Training ModuleCost per

    Participant

    No of

    Participants

    per batch

    Cost of

    Training

    (Rs.) per

    batch

    Taxes

    (Rs.)

    Total C

    Traini

    batch

    1 Sensitization 30

    2 Leadership 30

    3 Change Management 30

    4 Project Management 30

    5 Technology Management 30

    6 Government ProcessReengineering

    30

    7 Basic IT Training 30

    8 General Awareness 30

    9 Other Training modules

    related to

    application/interface tools

    etc

    30

    Total 30

    Amount in Words: Indian Rupees

    *Note: The total no of batches mentioned above is for evaluation purposes , the same may vary dur

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    32/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2

    ANNEXURE 9: Format for Financial Quote for Help Desk

    S.No Cost per Seat No of Seats Cost in Rs Applicable

    Taxes (Rs)

    Total

    (R1 5

    Total

    Amount in Words: Indian Rupees

    Note: The Cost per Seat is all inclusive

    ANNEXURE 10: Format for Financial Quote for Online UPS

    Note: The prices quoted for the item in Annexure 10 above will not be considered for evaluation purpose

    provided separate and would be included as Table 3B to the original RFP document

    S.No Equipment OEM Make /

    Version

    Unit

    Rate

    No

    of

    Units

    Cost

    in

    Rs

    Taxes To

    1 423

    Total

    Amount in Words: Indian Rupees

  • 8/8/2019 Corrigendum - SSDG TN 27.05

    33/33

    TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010

    ANNEXURE 11: CONSOLIDATED COST SUMMARY

    Description

    Amount without

    Tax in Figure

    (Rs.) - (A)

    Applicable

    Taxes in figures

    (Rs.) (B)

    Total Amount in

    Figure (Rs.)

    A+B

    A.

    Total Capital Cost Including

    Maintenance

    Total of Table 1+Table

    2+Table3+Table4+Table

    5+Table 6

    B.Total Cost for Training andWorkshops

    ( Ref Table 7 for break up)

    C.Total Costs for Implementation

    (Ref Table 8 for break up)

    D.

    Total Costs for Operations and

    Support

    (Ref Table 9 for break up)

    E.Total Costs for Help Desk

    (Ref Table 9 A for break up)

    F.GRAND TOTAL (A+B+C+D)

    inclusive of all taxes

    Amount in Words: Indian Rupees