corrigendum - ssdg tn 27.05
TRANSCRIPT
-
8/8/2019 Corrigendum - SSDG TN 27.05
1/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
CORRIGENDUM- 1
SELECTION OF IMPLEMENTING AGENCY (IA)
(FROM ALREADY EMPANELLED IMPLEMENTING AGENCIES)
FOR
IMPLEMENTING ELECTRONIC FORMS APPLICATION THROUGH STATEPORTAL AND STATE SERVICE DELIVERY GATEWAY
IN
THE STATE OF TAMIL NADU, INDIA
DATE: 27/05/2010
ISSUED BY
Tamil Nadu e-Governance Agency (TNeGA)
TUFIDCO-POWERFIN BUILDING
490, ANNA SALAI, NANDANAM
CHENNAI - 600035
-
8/8/2019 Corrigendum - SSDG TN 27.05
2/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
S.No RFP Clause No Description Existing Clause
1 Volume 1 - 1.2 (7)
& Volume 2
Critical Information
(7)
Last date (deadline)
for receipt of
proposals in
response to RFP
notice
21/05/2010 upto 3PM 14/06/2010
2 Volume 1 1.2(8)
& Volume 2
Critical Information
(8)
Place, Time and
Date of opening of
Technical proposals
received in response
to the RFP notice
21/05/2010, 3:30 PM 14/06/2010
mentioned a
3 Volume 1- 2.2.5 Gap Infrastructure The gap infrastructure in the form of
Connectivity (except the bandwidth
from the telecom service provider)
and Computing Infrastructure shall
be provided by the Implementing
Agency at the departmental
locations across the State so as tofacilitate delivery of services from
respective State departments office,
The gap i
Connectivit
Infrastructu
Implementi
locations ac
delivery of
departmentsrequests rai
Forms on th
-
8/8/2019 Corrigendum - SSDG TN 27.05
3/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
in response to the requests raised
through filled in Electronic Forms
on the State Portal.
4 Volume 1 4.5 (iii) CDAC CDAC shall provide the training for
Implementation Agencies at various
levels such as overview,
administration and trouble shooting
of SSDG
CDAC wi
Implementa
Deploymen
5 Volume 1 4.5 (vi)
to be included
CDAC n/a CDAC will
support for
operations
SSDG co
application
the suppor
responsibili
6 Volume 1 11 Project
Implementation
Schedule
Refer Anne
Implementa
-
8/8/2019 Corrigendum - SSDG TN 27.05
4/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
7 Volume 1 14 (iii) Penalty &
Liquidated Damages
The time Schedule for the entire
project is as detailed in this RFP.
In case of any delay solely on
account of the Implementing
Agency, a penalty of 10% on the
project value will be imposed for
delay of every 4 weeks and thereof
subject to a maximum of 12
weeks.
The time
is as detai
delay so
Implemen
2.5% on t
be additio
the projec
days subje
8 Volume 1- 14 (iv) Penalty &
Liquidated Damages
Beyond a delay of 12 weeks,
TNeGA reserves the right to
terminate the contract and select
an alternate Implementing Agency
to carry out the balance work
Beyond a
reserves
contract
Implemen
balance w
9 Volume 1 16 Service Level
Requirements
Errata for
sub claus
renumber
10 Volume 1- 17 Governance Errata fo
-
8/8/2019 Corrigendum - SSDG TN 27.05
5/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
occurring
17.1 to 17
11 Volume 1 16 in
clause 16.2 as so
renumbered
Deployment SLR
16.2 (iv)
16.2 (v)
Expressio
end shall
Expressio
occurring
12 Volume 1 16 in
clause 16.2 as so
renumbered
Deployment SLR
matrix S.No 6
Lower performance Penalty - 10%
of the total project value
Breach Penalty - 20% of the total
project value
Lower pe
5% of the
Breach P
project va
13 Volume 1 16 in
clause 16.2 as so
renumbered
Deployment SLR
matrix S.No 7
Breach Penalty - 20% of the value
quoted for the same
Breach P
quoted fo
14 Volume 1 16 in
clause 16.2 as so
renumbered
Deployment SLR
matrix S.No 9
Project sign off and
Launch
Lower Performance Metric -
Greater than 180 days and upto 200
days
Lower Performance Penalty - 10%
of the total project valueBreach Metric - Greater than 200
days and upto 220days
Breach Penalty - 20% of the total
Lower Per
than 180 d
Lower Per
total projecBreach Me
and upto 2
Breach Pen
-
8/8/2019 Corrigendum - SSDG TN 27.05
6/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
project value
Greater than 220 days - Termination
of contract
value
Greater tha
contract
15 Volume 1
Annexure 4
Indicative Bill of
Materials
Indicative Minimum specifications
for Gap Infrastructure
Refer Anne
specificatio
16 Volume 1
Annexure 4
(S.No.4)
Indicative Bill of
Materials for Gap
Infrastructure
1 KVA True Online UPS Replaced wi
with 1 hour b
17 Volume 1
Annexure 4 (S.No
6) to be included
Indicative Bill of
Materials for Gap
Infrastructure
1 KVA True Online UPS Refer Annex
The online u
optional quo
summary of
evaluation pu
18 Volume 1
Annexure 4
Indicative Bill of
Materials
Minimum Hardware specifications
SSDG Hardware Stack
Refer Anne
Hardware s
Hardware S
19 Volume 1
Annexure 4
Indicative Bill of
Materials
Minimum Hardware specifications
State Portal
Refer Anne
Hardware s
20 Volume 2 1.15 Sealing and Marking DO NOT OPEN BEFORE 15:30 DO NOT O
-
8/8/2019 Corrigendum - SSDG TN 27.05
7/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
of Bids hours on 21.05.2010 on 14.06.20
21 Volume 2 1.18 Deadline for
submission of Bid
Bids must be received by TNeGA at
the address specified, not later than
15:00 hrs on 21.05.2010
Bids must b
address spe
on 14.06.20
22 Volume 2 3.3 Evaluation Criteria Refer Anne
criteria
23 Volume 2 5.2.8
(ii)
Arbitration In the event of any dispute or
differences arising under these
conditions or any special conditions
of the contract in connection with
this contract, the same shall be
referred to the Secretary to
Government, Information
Technology Department, GoTN for
final decision and the same shall be
binding on all parties.
In the even
arising und
special co
connection
implementa
and selecte
resolve issu
based on te
MSA. If n
then the s
Secretary
Technology
suitable dec
un resolve
-
8/8/2019 Corrigendum - SSDG TN 27.05
8/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
escalated f
Project Co
which shall
24 Volume 2
Annexure 9
Financial Proposal
Submission Formats
Consolidated cost
Summary
Format for Consolidated Cost
Summary
Format mod
in this corr
format prov
corrigendum
25 Volume 2
Annexure 9 Table
1
Financial Proposal
Submission Formats
Table 1 : Format for Financial Quote
for Hardware Supply for SSDG
Stack including warranty and
maintenance
To be quote
Annexure 6
26 Volume 2
Annexure 9 Table
6
Financial Proposal
Submission Formats
Table 6: Format for Financial Quote
for Development of electronic forms
To be quote
Annexure 7
27 Volume 2
Annexure 9- Table
7
Financial Proposal
Submission Formats
Table 7: Format for Financial Quote
for Training and Workshops
To be quote
Annexure 8
28 Volume 2-
Annexure 9 Table
9 (4)
Format for Financial
Quote for
Operations and
S.No. 4 Help Desk S.No 4. Rem
in a separat
per the form
-
8/8/2019 Corrigendum - SSDG TN 27.05
9/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
Support this corrigen
included as
Annexure 9
29 Volume 2
Annexure 9 Table
10
Format for
Technical
compliance
Any change
Requiremen
mentioned i
form a part
sheet menti
30 Annexure to
Volume 2 MSA
Clause 19 (2), (3),
(4), (6)
Dispute Resolution The expression State e gov group The express
shall be sub
31 Annexure to
Volume 2 MSA
Clause 9 (iii) & (iv)
Liquidated Damages Changes ma
changes ma
clause 4 (iii
S.No. 7 & 8
32 Annexure to
Volume 2 MSA Clause 19 (2)
Dispute Resolution For the expression NeGP The express
substituted
33 Annexure to Dispute Resolution The Government of Tamil Nadu The disput
-
8/8/2019 Corrigendum - SSDG TN 27.05
10/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
Volume 2 MSA
Clause 19 (7)
shall nominate sole Arbitrator for
purpose of the arbitration
proceedings.
arbitrators,
party and th
an umpire
the referen
arbitration
as the case
parties, ma
making and
34 Annexure to
Volume 2 MSA
24
Appendix B :
Timelines
Changes m
changes ma
as mentione
-
8/8/2019 Corrigendum - SSDG TN 27.05
11/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
10
IMPORTANT NOTICE:
This Corrigendum & the Annexure forms part of the Original RFP Document
Changes made to the RFP as mentioned under S.No 1 to 29 of the corrigendum above
shall mutatis mutandis apply to MSA as well wherever similar provisions exists
All other terms and conditions remains un altered
Chief Executive Officer
Tamil Nadu e-Governance Agency
Enclosures
Annexures
-
8/8/2019 Corrigendum - SSDG TN 27.05
12/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
11
ANNEXURE 1 Project Implementation Schedule
Stage Activity / MilestoneTimelines (Calendar
Days)
I Issuance of LOA D=0 ( Start Date)II Execution of Agreement D+7
III Kick off Meeting D+9
IV Assessment and validation of physical infrastructure
assets at SDC / SWAN PoC and Gap Infrastructure
details from the point of view of installation of IT
hardware for Portal and SSDG
D+15
V Supply , of Hardware, System Software, peripherals
and other accessories to the State HQs & customer
premises
D+45
VI Conversion of Physical forms to e-forms D+60
VII Application Development for e-Forms D+60
VA Installation of Infrastructure at State Headquarters D+75
VB Installation and commissioning of Hardware , System
Software, Peripherals and other accessories
D+75
VC Network Broad Band connectivity for all Locations D+75
VIII Security Implementation D+80
IX Design , Documentation and Manuals for end users D+100
X Development of State Portal by NIC D1=D+80 = 80
XI Integration with State Portal D1 + 20 = 100
XII User Acceptance Test D1 + 50 = 130
XIII Training D1 + 80 = 160
XIV Project Sign off D2=D1 + 100 = 180
XV Quality Certification D3 = D2 + 30
XVI QC feedback incorporation and re certification if
required
D3+15
-
8/8/2019 Corrigendum - SSDG TN 27.05
13/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
12
ANNEXURE 2 Indicative Minimum specifications for Gap Infrastructure
I. Desktop computer system, Configuration with3years onsite comprehensive warrantyfrom the
date of commissioning
S.No Item Code Description Specification
1.1 GI /CPU 001 CPU & Chipset Intel Core 2 Duo Processor E7500 and above (2.93
Ghz, 3 MB L2 cache, 1066 Mhz. FSB) with an
overall score of 155(+/_ 2) using sysmark 2007,
Intel 4 series chipset or better in performance /
NVIDIA / ATI
1.2 GI /CPU 002 Motherboard ( Intel /
Gigabyte/ASUS/MSI/MNC
OEM)
2 PCI and 1 PCI Express X16. Integrated Graphics
Controller, 10/100/1000 MBps, Network card with
remote booting facility
1.3 GI /CPU 003 Memory 1 x 2 GB DDR2 SDRAM @ 800 MHz up gradable
upto 4 GB or higher
1.4 GI /CPU 004 Hard Disk Drive 500 GB or higher SATA HDD / 2x 250 GB or
higher SATA HDD
1.5 GI /CPU 005 Monitor 19 TFT (+/_ 0.5 inch) TFT / Wide LCD Colour
monitor. Resolution 1440 x 900 : Response time 5
ms
1.6 GI /CPU 006 Keyboard USB / PS2 Mechanical Keyboard OEM /
TVSE or High Quality OEM Membrane keyboard
1.7 GI /CPU 007 Mouse Optical Mouse with Mouse Pad
1.8 GI /CPU 008 Bays 3 Bays or more
1.9 GI /CPU 009 Ports 1 Serial Port, 6 USB Port (2 in front), 1 Parallel
Port & 2 PS 2 Port or 2 additional USB ports
1.10 GI /CPU 010 Cabinet Mini tower type / Desktop Systems
1.11 GI /CPU 011 DMI DMI 2.0 Compliance and Support
1.12 GI /CPU 012 Networking features 10/100/1000 Network Card with remote booting
facility, remote system installation Asset
tracking and security management, remote shut
down and wake up
1.13 GI /CPU 013 Power Energy star compliance 5.0, Screen blanking,
-
8/8/2019 Corrigendum - SSDG TN 27.05
14/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
13
Management hard Disk and System Idle Mode in Power On,
Set up Password, Power Supply Surge protected
1.14 GI /CPU 014 Preloaded software Norton, McAfee or equivalent antivirus (Latest
version) or equivalent AV for Linux
1.15 GI /OS 015 Operating
System
LINUX Desktop OS preloaded with media and
documentation and certificate of authenticity
(BOSS or equivalent)
2 GI /LP 016 Laser Printer Print Speed 25 ppm, Mono Laser Printer up to
effective 1200 resolution (1200 x 600 DPI )
Input Capacity-Upto 250 sheets
Duplex printing (printing on both side of paper)-
Automatic (Standard)
Paper handling- Single sheet multipurpose input
slot 250 sheet input tray
Media type paper, envelop, labels, cardstock,
transparencies, heavy media
Memory-32MB
Connectivity Std- USB 2.0 compatible port/ IEEE
1284-B complaint parallel port, 10/100 Ethernet
Port or higher
Inbuilt Processor (400 mhz /more)
A4 size, 25.ppm. Duplex.
3 GI /SN 017 Scanner
TWAIN Compliant
Up to 3600 dpi
Interfaces: Hi-Speed USB (compatible with USB
2.0 specifications)
Task speed: 4 x 6-in color photo to file: about 10
sec for multiple image scan, about 31 sec for single
image scan; OCR 8.5 x 11-in text to Word or open
source: about 33 sec; 4 x 6-in color photo to
share/e-mail; about 34 sec for single image scan
4 GI /UP 018 1.0KVA Line InteractiveUPS with 1 hour back
up
Type: MOSFET / IGBT; Input : Voltage Mains-
150 270 V AC, Single phase; Frequency with
Tolerance 50 Hz, +/- 3% ; Battery- Sealed
-
8/8/2019 Corrigendum - SSDG TN 27.05
15/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
14
ISO Quality Certified maintenance free SMF type ( AH and no of
batteries shall be suitably selected for the required
back up time at 600 W resistive load or 1.0 KVA
load with 0.6 PF. The details are to be specified by
the tenderer along with the make of the battery, no
of batteries and voltage & AH of each battery;
Battery Storage Box- External battery storage box
for batteries with safety provisions to be supplied
along with the UPS system, if batteries are not
provided inside the UPS system. Output
Nominal Voltage 220 V AC , Single phase (+/-
10%) with voltage regulation 198 V to 242 V ,
Frequency 50 Hz +/- (0.2) Hz, Waveform
Quasi/Pure sine wave with transfer time 4-6 msec
with load power factor 0.6 lag to unity.
Automatic voltage regulator to be provided.
Protections Fuses for input, Overload,
over/under voltage, short circuit, battery reverse
and Lightening protection
5 GI/LAN/022 LAN Cabling &
Accessories
CAT 6e cable, Cat 6-I/O outlet with SMB, CAT6 3
feet /7 feet patch cord,CAT6 24 port patch panel,
6U rack / 9U rack wall mount, 16 / 24 port
unmanageable switch 10/100 mbps, 24 port
manageable switch, cable laying, & 20mm
conduit/channel
6 GI/ UP / 019
(Optional)
True Online UPS 1 KVA
With 1 hour back up
ISO Quality Certified
Capacity 1.0 KVA True Online UPS. Type :
MOFSET/IGBT(make and current capacity to be
specified); INPUT Mains Voltage Regulation:
150-270 V AC, Single Phase, Input power factor:
>0.9; Frequency with tolerance: 50Hz +/- 3Hz;
Battery: Sealed maintenance free (SMF) AH and
No of Batteries shall be suitably selected for the
required back up time at 700w resistive load or 1.0
KVA load with 0.7 PF. The details are to be
-
8/8/2019 Corrigendum - SSDG TN 27.05
16/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
15
specified along with the make of the battery; DC
Bus Voltage: to be specified by the tenderer. Make
of the Battery: Reputed brand only to be quoted.
Specify the manufacturer make , model and enclose
technical sheet; Battery Storage Box / Rack :
External battery storage box for the batteries with
safety provisions to be supplied along with the
UPS system; Output : Nominal Voltage 230 V
AC single phase (+/_ 1%); Voltage Regulation: +/-
1%; Frequency: 50 Hz, +/- (0.2)Hz; Waveform
Pure Sinewave; Load Power Factor 0.7 lag to
unity
-
8/8/2019 Corrigendum - SSDG TN 27.05
17/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
16
ANNEXURE 3:Minimum Hardware Specifications SSDG Hardware Stack
S.No Description Quantity
1 Blade Servers Chassis 2
2 Blades Dual CPU Blade 83 Tape Drive with Backup Software 1
4 Rack Mount Server (Single CPU) for storage 1
5 Rack 1
6 Switch 1
7 Rack Mount Server ( Single CPU) for LB rack 2
S.No Item Code Component Required Minimum specifications
1 Blade Server Chassis
1.1 SSDG/BSC/001 Chassis Blade Chassis to accommodate a
minimum of 10 hot pluggable and hot
swap half size blades with SAS HDD.
1.2 SSDG/BSC/002 Ethernet Switch Chassis should support Redundant
Ethernet Switch Modules -having
minimum 2 uplink ports each.
(Internally connecting all processor
blades).
1.3 SSDG/BSC/003 Management
Module
Should be able to Manage, Administer
and Monitor through Network. A
redundant management module is also
required in the blade center chassis. It
should also have capabilities to
manage servers remotely.
1.4 SSDG/BSC/004 Power Modules 100% redundancy on power supplies to
be provided inside the Blade Chassis.
1.5 SSDG/BSC/005 Cooling 100% Redundant Cooling to be
provided inside the Chassis.
-
8/8/2019 Corrigendum - SSDG TN 27.05
18/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
17
1.6 SSDG/BSC/006 Management
Software
The software should be from OEM
itself.
Note: The chassis should support minimum 10 half size servers.
2 Blades Dual CPU Blade
2.1 SSDG/DCB/007 Processor X86_64 architecture, 2 (socket) X
multi-core (quad core or more) with
minimum 2 GHz clock speed and 1066
MHz FSB or more.
2.2 SSDG/DCB/008 Memory 16 GB, PC2-5300 or higher speed
DDR2 fully buffered DIMMs with
ECC. Expandability to a minimum of
32 GB
2.3 SSDG/DCB/009 Chipset Intel 5000 sequence or higher
2.4 SSDG/DCB/010 HDD 2 * 146 GB 10K/15K hot-swappable
SFF SAS Drive
2.5 SSDG/DCB/011 Controller Dual Channel SAS Controller with
RAID 1 inbuilt.
2.6 SSDG/DCB/012 Networking Dual Gigabit Ethernet Controller/ full
duplex
2.7 SSDG/DCB/013 External Ports 2 USB, Graphics
2.8 SSDG/DCB/014 Power supply Enclosure-based power
2.9 SSDG/DCB/015 Operating systems
support
The hardware should support Red Hat
Enterprise Linux v5 x86_64
(Advanced Platform)
3 Tape Drive with SCSI Controller
3.1 SSDG/TD/016 Technology LTO3/ LTO4
3.2 SSDG/TD/017 Form Factor Preferably Rack Mountable with rack
mount accessories
3.3 SSDG/TD/018 Capacity 2 TB (Native) & 4TB GB
-
8/8/2019 Corrigendum - SSDG TN 27.05
19/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
18
(Compressed)
3.4 SSDG/TD/019 Interface Ultra320 SCSI controller to connect
the drive to the server specified in Item
1
3.5 SSDG/TD/020 Management
Software
Bundled with the drive
3.6 SSDG/TD/021 Operating System
support
The hardware should support Red Hat
Enterprise Linux v5 x86_64
(Advanced Platform)
3.7 SSDG/TD/022 Backup Software Licensed copy of the backup software
for the drive offered. Backup Software
(licensed) should support PostgreSQL
on Linux.
3.8 SSDG/TD/022 Color Matching with the servers
3.9 SSDG/TD/023 Cleaning cartridge One cartridge must be included in the
offer.
3.10 SSDG/TD/024 Data Cartridge Five cartridges of 1 TB native capacity
must be included in the offer
Note: The requirements given are the minimum for storage.
4 Rack Mount Server (Single CPU) for Storage
4.1 SSDG/RMS/025 Processor X86_64 architecture, 2 (socket) X
multi-core (quad core or more) with
minimum 2 GHz clock speed and 1066
MHz FSB or more.
4.2 SSDG/RMS/026 Chipset Intel 5000 sequence or higher
4.3 SSDG/RMS/027 Memory 8 GB, PC2-5300 or higher speed
DDR2 fully buffered DIMMs with
ECC. Expandability to a minimum of
32 GB
4.4 SSDG/RMS/028 Disk Drives 5 x 1000GB SAS 7200 or higher RPM
-
8/8/2019 Corrigendum - SSDG TN 27.05
20/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
19
SFF SP HDD
4.5 SSDG/RMS/029 Disk bays Minimum 8 hot-swappable hard disk
drive bays
4.6 SSDG/RMS/030 Disk Controller SAS controller supporting 3Gb data
transfer speed and RAID 0, 1, 1+0, 5
with 256MB cache support.
4.7 SSDG/RMS/031 Networking Dual Gigabit Ethernet Controller/ full
duplex
4.8 SSDG/RMS/032 External Ports USB, Serial, Graphics, Management
port
4.9 SSDG/RMS/033 Power Supply Hot swap Power Supply with
Redundant Power Supply
4.10 SSDG/RMS/034 Operating systems
support
The hardware should support Red Hat
Enterprise Linux v5 x86_64
(Advanced Platform)
4.11 SSDG/RMS/035 Display Controller On-board Graphics controller with
minimum 8-MB Video memory
4.12 SSDG/RMS/036 Combo drive CD-RW/DVD-ROM
Note: The Server is required as SAN
5 Server Rack
5.1 SSDG/SR/036 42U OEM Adequate Rack For the
installation of Servers, tape Library,
Switches and other rack mounted
equipments
5.2 SSDG/SR/037 PDU 2 Power Distribution Unit and bars for
rack equipment.
5.3 SSDG/SR/038 Extras Should include cable management
equipment to incorporate network, and
power cables.
5.4 SSDG/SR/039 Dimension Should support installation of supplied
-
8/8/2019 Corrigendum - SSDG TN 27.05
21/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
20
hardware mentioned in this offer.
6 Switch
6.1 SSDG/SW/040 Make Must be specified
6.2 SSDG/SW/041 Model Must be specified
6.3 SSDG/SW/042 Number of ports
and Interface
24 Gigabit Ethernet UTP ports +
Gigabit SFP slot for fiber connection
6.4 SSDG/SW/043 Switching Speed 48 Gbps, non-blocking
6.5 SSDG/SW/044 MAC addresses 8000 or more
6.6 SSDG/SW/045 VLANs 256 or more (IEEE 802.1Q)
6.7 SSDG/SW/046 SNMP Should support SNMP Version v1,v2c,
v3 & RMON
6.8 SSDG/SW/047 Security Features IEEE 802.1X
MAC based access control
Link Aggregation
Spanning Tree Protocol (IEEE 802.1D)
IGMP Snooping, Storm Control
6.9 SSDG/SW/048 Management Should be SNMP manageable.
Should support RMON
Should support Firmware Upgrade
Should support port mirroring
6.10 SSDG/SW/049 Standards /
Features
Full Duplex Operation, Spanning Tree
Protocol
Network Login (web-based
DHCP/HTTP/RADIUS mechanism)
4 QoS queues/port
9216 Byte maximum packet size
(Jumbo Frame)
MAC Address based Filtering Support
Link Aggregation using IEEE 802.3ad
Flow Control (IEEE 802.3X)
-
8/8/2019 Corrigendum - SSDG TN 27.05
22/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
21
Traffic prioritization (IEEE 802.1p)
6.11 SSDG/SW/050 Power Supply Internal power supply
6.12 SSDG/SW/051 Rack mounting
Accessories
Must be included in the offer.
6.13 SSDG/SW/052 Device
management
software
Standard software bundled along with
the switch must be included in the
offer
6.14 SSDG/SW/053 Console cable Must be included in the offer.
6.15 SSDG/SW/054 Documentation Original documentation in the form of
Hard Copy / CDs must be included in
the offer.
7 Rack Mount Server (Single CPU) for LB
7.1 SSDG/
RMS/LB/055
Processor X86_64 architecture, 2 (socket) X
multi-core (quad core or more) with
minimum 2 GHz clock speed and 1066
MHz FSB or more.
7.2 SSDG/RMS/LB/056
Chipset Intel 5000 sequence or higher
7.3 SSDG/
RMS/LB/057
Memory 4 GB, PC2-5300 or higher speed
DDR2 fully buffered DIMMs with
ECC. Expandability to a minimum of
32 GB
7.4 SSDG/
RMS/LB/058
Disk Drives 2 x 500GB SAS 7200 or higher RPM
SFF SP HDD (hot swappable)
7.5 SSDG/
RMS/LB/059
Disk Controller SAS controller supporting 3Gb data
transfer speed and RAID 0, 1, 1+0 with
256MB cache support.
7.6 SSDG/
RMS/LB/060
Networking Dual Gigabit Ethernet Controller/ full
duplex, SSL Card with SSL
acceleration s/w and necessary drivers
-
8/8/2019 Corrigendum - SSDG TN 27.05
23/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
22
7.7 SSDG/
RMS/LB/061
External Ports USB, Serial, Graphics, Management
port
7.8 SSDG/RMS/LB/062
Power Supply Hot swap Power Supply with
Redundant Power Supply
7.9 SSDG/
RMS/LB/063
Operating System
Support
The hardware should support Red Hat
Enterprise Linux v5 x86_64 (Advanced
Platform)
7.10 SSDG/
RMS/LB/064
Display Controller On-board Graphics controller with
minimum 8-MB Video memory
7.11 SSDG/RMS/LB/065
Combo Drive CD-RW/DVD-ROM
-
8/8/2019 Corrigendum - SSDG TN 27.05
24/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
23
ANNEXURE 4 : Minimum Hardware specifications State Portal
S.No Item Code Required Minimum specifications
1 Web/Portal & CMS Servers (Production) 4 Nos
1.1 SP/CMS/001 2U Rack Mountable
1.2 SP/CMS/002 Two no. of quad core 64bit high-end processor, 2.8 Ghz or higher
1.3 SP/CMS/003 64 GB RAM with ECC, expendable up to 128GB
1.4 SP/CMS/004 5 X 300GB SAS SFF Hot pluggable disk drives
1.5 SP/CMS/005 5-Port SAS RAID Controller having 128 MB buffer memory with
battery backup and supporting RAID level 0,1 & 5.
1.6 SP/CMS/006 Integrated Four port 10/100/1000 Base T Ethernet Controller, auto
sense, full duplex with RJ45 connector on 2 separate controllers
1.7 SP/CMS/007 Integrated on-board video controller with 16MB memory.
1.8 SP/CMS/008 Ports: 1 xSerial Port, 1 xVGA, 5 xUSB, 4xRJ45, 1x Management
port, KBD & Mouse through USB port.
1.9 SP/CMS/009 Dual port HBA card configurable for 4 Gbps per port along with
two no. of 5 meter Optical fiber (multimode) LC to LC cables.
1.10 SP/CMS/010 One internal DVD Writer
1.11 SP/CMS/011 Redundant (1+1), hot swappable Power Supply.
1.12 SP/CMS/012 Dedicated port for Hardware Based, OS independent out of band
remote management.
1.13 SP/CMS/013 Server Management Features: Remote Management of the Server
over LAN, Server Health Logging, and System Management
software bundled in media.
1.14 SP/CMS/014 OS Support : Linux (Enterprise) Server
1.15 SP/CMS/015 5 years on Site Comprehensive Warranty with 99.95 % up time.2 Database Servers (Production) 2 Nos
2.1 SP/DS/016 2U Rack Mountable
2.2 SP/DS/017 Two no. of quad core 64bit high-end processor 2.8 Ghz or higher
2.3 SP/DS/018 32 GB RAM with ECC, expendable up to 64 GB
-
8/8/2019 Corrigendum - SSDG TN 27.05
25/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
24
2.4 SP/DS/019 5 X 300GB SAS SFF Hot pluggable disk drives
2.5 SP/DS/020 5-Port SAS RAID Controller having 128 MB buffer memory with
battery backup and supporting RAID level 0,1 & 5.
2.6 SP/DS/021 Integrated Four port 10/100/1000 Base T Ethernet Controller, auto
sense, full duplex with RJ45 connector on 2 separate controllers
2.7 SP/DS/022 Integrated on-board video controller with 16MB memory.
2.8 SP/DS/023 Ports: 1 xSerial Port, 1 xVGA, 5 xUSB, 4xRJ45, 1x
Management port, KBD & Mouse through USB port.
2.9 SP/DS/024 Dual port HBA card configurable for 4 Gbps per port along with
two no. of 5 meter Optical fiber (multimode) LC to LC cables.
2.10 SP/DS/025 One internal DVD Writer
2.11 SP/DS/026 Redundant (1+1), hot swappable Power Supply.
2.12 SP/DS/027 Dedicated port for Hardware Based, OS independent out of band
remote management.
2.13 SP/DS/028 Server Management Features: Remote Management of the Server
over LAN, Server Health Logging, and System Management
software bundled in media.
2.14 SP/DS/029 OS Support : Linux (Enterprise) Server
2.15 SP/DS/030 5 years on Site Comprehensive Warranty with 99.95 % up time.
3 Web/Portal, CMS, Database Servers (Staging) 3 Nos
3.1 SP/STG/031 2U Rack Mountable
3.2 SP/STG/032 Two no. of quad core 64bit high-end processor 2.8 Ghz or higher
3.3 SP/STG/033 32 GB RAM with ECC, expendable up to 64 GB
3.4 SP/STG/034 5 X 300GB SAS SFF Hot pluggable disk drives
3.5 SP/STG/035 5-Port SAS RAID Controller having 128 MB buffer memory with
battery backup and supporting RAID level 0,1 & 5.3.6 SP/STG/036 Integrated Four port 10/100/1000 Base T Ethernet Controller, auto
sense, full duplex with RJ45 connector on 2 separate controllers
3.7 SP/STG/037 Integrated on-board video controller with 16MB memory.
3.8 SP/STG/038 Ports: 1 xSerial Port, 1 xVGA, 5 xUSB, 4xRJ45, 1x Management
-
8/8/2019 Corrigendum - SSDG TN 27.05
26/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
25
port, KBD & Mouse through USB port.
3.9 SP/STG/039 Dual port HBA card configurable for 4 Gbps per port along with
two no. of 5 meter Optical fiber (multimode) LC to LC cables.
3.10 SP/STG/040 One internal DVD Writer
3.11 SP/STG/041 Redundant (1+1), hot swappable Power Supply.
3.12 SP/STG/042 Dedicated port for Hardware Based, OS independent out of band
remote management.
3.13 SP/STG/043 Server Management Features: Remote Management of the Server
over LAN, Server Health Logging, and System Management
software bundled in media.
3.14 SP/STG/044 OS Support : Linux (Enterprise) Server
3.15 SP/STG/045 5 years on Site Comprehensive Warranty with 99.95 % up time.
4 Additional Items Required
4.1 SP/ADI/046 Two 42U Rack with 2 power strips each
4.2 SP/ADI/047 Two 8 Port KVM Switch with accessories ( KB, Mouse, Cable
Harness etc) Rack Compatible
4.3 SP/ADI/048 Two 17 inch TFT Monitor(Foldable), 2key boards/mouse(rack
compatible)
4.4 SP/ADI/049 Layer 2 Manageable Ethernet Switch with 24 Ports
4.5 SP/ADI/050 Rack mountable NAS Space required : 2 TB (usable capacity)
-
8/8/2019 Corrigendum - SSDG TN 27.05
27/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
26
ANNEXURE 5 : Evaluation Criteria
S.No Evaluation Criteria Marks Total
Project Experience
Understanding the Scope of Work 5
Satisfactory performance of ICT projects undertaken
currently under NeGP/ MMP/State e-Governance Projects10
1
Government Projects experience in State / Central in the
areas of Gap Infrastructure, Business Process
Reengineering, Capacity Building
5
20
Project Implementation Plan
Detailed implementation plan including Hardware
deployment, Software development, Network
Management , Logistics , development & deployment of
eforms, Management of Content services, coordination
and synchronization plans with various stake holders for
State Portal, eforms, CSP etc
10
2
Quality Systems and Approach to Risk Identification and
Mitigation
5
15
Approach and Methodology3
Approach and Methodology for Project Management,
Project Transition, Team Management, Handover and Exit
Management
15
15
Resource Deployment
Team Composition for Project Implementation, Training,
Application Development, Support Services,10
4
Project Management Team Qualifications and
Experience10
20
5 Training Implementation Plan 5 5
6 Responsiveness to Technical Requirements and SLA 15 15
-
8/8/2019 Corrigendum - SSDG TN 27.05
28/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
27
Implementation and Management methodology
proposed
7 Presentation 10 10
Total 100
-
8/8/2019 Corrigendum - SSDG TN 27.05
29/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
ANNEXURE 6 : Format for Financial Quote for Hardware Supply for SSDG Stack including w
S.No Item Code Equipment OEMMake/
Version
Unit
Rate
(In Rs.)
No o
Unit
1 SSDG/BSC/001 to
SSDG/BSC/006Blade Server Chassis
2
2 SSDG/DCB/007 to
SSDG/DCB/015Blades- Dual CPU Blades
8
3 SSDG/TD/016 to
SSDG/TD/024
Tape Drive with Backup
Software
1
4 SSDG/SW/040 to
SSDG/SW/054
Switch1
5 SSDG/RMS/025 to
SSDG/RMS/036
Rack Mount Server (Single
CPU) for Storage
1
6 SSDG/SR/036 to
SSDG/SR/039Rack
1
7 SSDG/ RMS/LB/055
to SSDG/
RMS/LB/065
Rack Mount Server (Single
CPU) for LB
2
Total Cost for SSDG Stack (In Rs.)
Amount in Words : Indian Rupees
-
8/8/2019 Corrigendum - SSDG TN 27.05
30/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
29
ANNEXURE 7: Table 6: Format for Financial Quote for Development of electronic
forms
S.No Description Unit Cost Qty* Cost
(Rs.)
Applicable
Taxes
Total
Cost
(Rs.)
1 Cost of development of one
electronic form containing
upto 30 fields
30
2 Cost of development of one
electronic form containing
more than 30 fields
30
Total
Amount in Words: Indian Rupees
* The Nos mentioned above is for evaluation purposes. The actual number of forms
to be developed would be decided during the time of implementation and the unit
cost would be considered
-
8/8/2019 Corrigendum - SSDG TN 27.05
31/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
ANNEXURE 8: Table 7: Format for Financial Quote for Training and Work
S.No Training ModuleCost per
Participant
No of
Participants
per batch
Cost of
Training
(Rs.) per
batch
Taxes
(Rs.)
Total C
Traini
batch
1 Sensitization 30
2 Leadership 30
3 Change Management 30
4 Project Management 30
5 Technology Management 30
6 Government ProcessReengineering
30
7 Basic IT Training 30
8 General Awareness 30
9 Other Training modules
related to
application/interface tools
etc
30
Total 30
Amount in Words: Indian Rupees
*Note: The total no of batches mentioned above is for evaluation purposes , the same may vary dur
-
8/8/2019 Corrigendum - SSDG TN 27.05
32/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2
ANNEXURE 9: Format for Financial Quote for Help Desk
S.No Cost per Seat No of Seats Cost in Rs Applicable
Taxes (Rs)
Total
(R1 5
Total
Amount in Words: Indian Rupees
Note: The Cost per Seat is all inclusive
ANNEXURE 10: Format for Financial Quote for Online UPS
Note: The prices quoted for the item in Annexure 10 above will not be considered for evaluation purpose
provided separate and would be included as Table 3B to the original RFP document
S.No Equipment OEM Make /
Version
Unit
Rate
No
of
Units
Cost
in
Rs
Taxes To
1 423
Total
Amount in Words: Indian Rupees
-
8/8/2019 Corrigendum - SSDG TN 27.05
33/33
TENDER REFERENCE NO : TNeGA/249/C/SSDG/IA2009 dated 07.05.2010
ANNEXURE 11: CONSOLIDATED COST SUMMARY
Description
Amount without
Tax in Figure
(Rs.) - (A)
Applicable
Taxes in figures
(Rs.) (B)
Total Amount in
Figure (Rs.)
A+B
A.
Total Capital Cost Including
Maintenance
Total of Table 1+Table
2+Table3+Table4+Table
5+Table 6
B.Total Cost for Training andWorkshops
( Ref Table 7 for break up)
C.Total Costs for Implementation
(Ref Table 8 for break up)
D.
Total Costs for Operations and
Support
(Ref Table 9 for break up)
E.Total Costs for Help Desk
(Ref Table 9 A for break up)
F.GRAND TOTAL (A+B+C+D)
inclusive of all taxes
Amount in Words: Indian Rupees