Pag 1 Proiect: __________________ ___ nr: Faza: __________________ OBIECTIV: Autoliv_Extindere_Hala OBIECTUL: Cort pe structura metalica h.streasina=6m Beneficiar: Autoliv Romania Proiectant: Bens Corporation Executant: Bens Coprporation - euro - 03.03.2014 C5 - LISTA cuprinzand cantitatile de lucrari SECTIUNEA TEHNICA SECTIUNEA FINANCIARA Nr. Capitolul de lucrari U.M. Cantitatea Pretul unitar (exclusiv TVA) -euro- TOTALUL (exclusiv TVA) -euro- 0 1 2 3 4 5 = 3 x 4 OBIECTUL: Cort pe structura metalica h.streasina=6m STADIUL FIZIC: Constructii material: manopera: utilaj: transport: mc 65.756 16,439.114 0.000 65.756 0.000 0.000 0.000 16,439.114 0.000 0.000 250.000 Sapatura mecanizata,umplutura de balast,copactare cu vibrocompactor DA23A% manopera ore 732.500 material: manopera: utilaj: transport: mp 21.727 21,726.899 21.040 0.687 0.000 0.000 21,040.094 686.804 0.000 0.000 1,000.000 Fundatii si platforma betonata pentru cort(Beton armat 20 cm grosime) CA03H#123 greutate materiale tone 2,687.000 manopera ore 650.000 material: manopera: utilaj: transport: buc 49,570.377 49,570.377 8,401.384 34,438.750 6,730.243 0.000 8,401.384 34,438.750 6,730.243 0.000 1.000 Ansamblu cort-achizitie si montaj CS354 greutate materiale tone 0.078 manopera ore 76.670 material: manopera: utilaj: transport: mp 30.279 30,279.354 17.107 13.172 0.000 0.000 17,107.243 13,172.111 0.000 0.000 1,000.000 Platforma incarcare tir+drum acces(borduri si pavaj rutier sarcina utila=40tone) ASD1235 greutate materiale tone 38.848 manopera ore 4,760.840 material: manopera: utilaj: transport: mp 119.345 28,642.841 110.192 9.153 0.000 0.000 26,446.099 2,196.742 0.000 0.000 240.000 Tunel de legatura intre hala veche si hala noua(cadre metalice h= 4m,acoperis tabla.protectii laterale din tabla,pardosea sclivisita din beton armat) TNU152 greutate materiale tone 215.254 manopera ore 32,880.000

Upload: benzarstefan

Post on 21-Jul-2016

21 views

Category:

Documents


6 download

DESCRIPTION

jgk,

TRANSCRIPT

Page 1: Cort pe structura metalica h.streasina=6m_ct

Pag 1

Proiect: __________________ ___nr:

Faza: __________________

OBIECTIV: Autoliv_Extindere_Hala

OBIECTUL: Cort pe structura metalica h.streasina=6m

Beneficiar: Autoliv Romania

Proiectant: Bens Corporation

Executant: Bens Coprporation

- euro - 03.03.2014

C5 - LISTA cuprinzand cantitatile de lucrari

SECTIUNEA TEHNICA SECTIUNEA FINANCIARA

Nr. Capitolul de lucrari U.M. Cantitatea

Pretul unitar

(exclusiv TVA)

-euro-

TOTALUL

(exclusiv TVA)

-euro-

0 1 2 3 4 5 = 3 x 4

OBIECTUL: Cort pe structura metalica h.streasina=6m

STADIUL FIZIC: Constructii

material:

manopera:

utilaj:

transport:

mc 65.756 16,439.114

0.000

65.756

0.000

0.000

0.000

16,439.114

0.000

0.000

250.000Sapatura mecanizata,umplutura de

balast,copactare cu vibrocompactor

DA23A%

manopera ore 732.500

material:

manopera:

utilaj:

transport:

mp 21.727 21,726.899

21.040

0.687

0.000

0.000

21,040.094

686.804

0.000

0.000

1,000.000Fundatii si platforma betonata pentru

cort(Beton armat 20 cm grosime)

CA03H#123

greutate materiale tone 2,687.000

manopera ore 650.000

material:

manopera:

utilaj:

transport:

buc 49,570.377 49,570.377

8,401.384

34,438.750

6,730.243

0.000

8,401.384

34,438.750

6,730.243

0.000

1.000Ansamblu cort-achizitie si montaj CS354

greutate materiale tone 0.078

manopera ore 76.670

material:

manopera:

utilaj:

transport:

mp 30.279 30,279.354

17.107

13.172

0.000

0.000

17,107.243

13,172.111

0.000

0.000

1,000.000Platforma incarcare tir+drum acces(borduri si

pavaj rutier sarcina utila=40tone)

ASD1235

greutate materiale tone 38.848

manopera ore 4,760.840

material:

manopera:

utilaj:

transport:

mp 119.345 28,642.841

110.192

9.153

0.000

0.000

26,446.099

2,196.742

0.000

0.000

240.000Tunel de legatura intre hala veche si hala

noua(cadre metalice h= 4m,acoperis

tabla.protectii laterale din tabla,pardosea

sclivisita din beton armat)

TNU152

greutate materiale tone 215.254

manopera ore 32,880.000

Page 2: Cort pe structura metalica h.streasina=6m_ct

Pag 2

STADIUL FIZIC: Constructii

0 1 2 3 4 5 = 3 x 4

OBIECTUL: Cort pe structura metalica h.streasina=6m

STADIUL FIZIC: Constructii

material:

manopera:

utilaj:

transport:

buc 2,650.104 2,650.104

994.659

1,655.445

0.000

0.000

994.659

1,655.445

0.000

0.000

1.000Usi sectionale pe fatada UZJK65

greutate materiale tone 0.011

manopera ore 3.700

totaltransportutilajmanoperamaterialprocent

149,308.687 0.000 6,730.243 68,588.966 73,989.479Cheltuieli directe:

R_AutolivRecapitulatia:

3,429.448 3,699.474 336.512 0.000Cheltuieli indirecte 7,465.4345.000 %

Total Inclusiv Cheltuieli indirecte: 77,688.953 72,018.414 7,066.755 0.000 156,774.122

10,802.762 11,653.343 1,060.013 0.000Profit 23,516.11815.000 %

Total Inclusiv Profit: 89,342.296 82,821.176 8,126.768 0.000 180,290.240

OBIECTUL: Cort pe structura metalica h.streasina=6m

STADIUL FIZIC: Proiectare si taxe

material:

manopera:

utilaj:

transport:

4eur

o/mp

3,312.629 3,312.629

0.000

3,312.629

0.000

0.000

0.000

3,312.629

0.000

0.000

1.000Proiectare arhitectua+organizare santier PZA23

manopera ore 1.350

material:

manopera:

utilaj:

transport:

3eur

o/mp

2,484.472 2,484.472

0.000

2,484.472

0.000

0.000

0.000

2,484.472

0.000

0.000

1.000Proiectare rezistenta PZR23

manopera ore 8.000

material:

manopera:

utilaj:

transport:

2.8% 8,250.320 8,250.320

0.000

8,250.320

0.000

0.000

0.000

8,250.320

0.000

0.000

1.000Taxe de avizare si punere in legalitate AVZ123

manopera ore 32.350

totaltransportutilajmanoperamaterialprocent

14,047.421 0.000 0.000 14,047.421 0.000Cheltuieli directe:

R_AutolivRecapitulatia:

702.371 0.000 0.000 0.000Cheltuieli indirecte 702.3715.000 %

Total Inclusiv Cheltuieli indirecte: 0.000 14,749.793 0.000 0.000 14,749.793

2,212.469 0.000 0.000 0.000Profit 2,212.46915.000 %

Total Inclusiv Profit: 0.000 16,962.261 0.000 0.000 16,962.261

Page 3: Cort pe structura metalica h.streasina=6m_ct

Pag 3

STADIUL FIZIC: Proiectare si taxe

0 1 2 3 4 5 = 3 x 4

Cheltuieli directe: 163,356.109 0.000 6,730.243 82,636.387 73,989.479

Recapitulatie: 0.000 1,396.525 15,352.817 17,147.050 33,896.393

TOTAL GENERAL (faraTVA): 99,783.438 8,126.768 0.000 197,252.501 89,342.296

TVA: 21,442.151 23,948.025 1,950.424 0.000 47,340.600

TOTAL GENERAL: 110,784.447 123,731.463 10,077.192 0.000 244,593.102

1 euro = 4.528 lei, curs la data de 26/01/2014

Nota:

1) Masuratorile sunt realizate cat mai aproape de realitatea din teren,

2) Pt fiecare lucrare care va fi executata sa va intocmi obligatoriu situatie de lucrari conforma cu realitatea.

3) Oferta valabila 15 zile.

Executant,

Director General,

Raport generat cu ISDP , www.devize.ro, e-mail: [email protected], tel.: 0236 477.007