Pag 1
Proiect: __________________ ___nr:
Faza: __________________
OBIECTIV: Autoliv_Extindere_Hala
OBIECTUL: Cort pe structura metalica h.streasina=6m
Beneficiar: Autoliv Romania
Proiectant: Bens Corporation
Executant: Bens Coprporation
- euro - 03.03.2014
C5 - LISTA cuprinzand cantitatile de lucrari
SECTIUNEA TEHNICA SECTIUNEA FINANCIARA
Nr. Capitolul de lucrari U.M. Cantitatea
Pretul unitar
(exclusiv TVA)
-euro-
TOTALUL
(exclusiv TVA)
-euro-
0 1 2 3 4 5 = 3 x 4
OBIECTUL: Cort pe structura metalica h.streasina=6m
STADIUL FIZIC: Constructii
material:
manopera:
utilaj:
transport:
mc 65.756 16,439.114
0.000
65.756
0.000
0.000
0.000
16,439.114
0.000
0.000
250.000Sapatura mecanizata,umplutura de
balast,copactare cu vibrocompactor
DA23A%
manopera ore 732.500
material:
manopera:
utilaj:
transport:
mp 21.727 21,726.899
21.040
0.687
0.000
0.000
21,040.094
686.804
0.000
0.000
1,000.000Fundatii si platforma betonata pentru
cort(Beton armat 20 cm grosime)
CA03H#123
greutate materiale tone 2,687.000
manopera ore 650.000
material:
manopera:
utilaj:
transport:
buc 49,570.377 49,570.377
8,401.384
34,438.750
6,730.243
0.000
8,401.384
34,438.750
6,730.243
0.000
1.000Ansamblu cort-achizitie si montaj CS354
greutate materiale tone 0.078
manopera ore 76.670
material:
manopera:
utilaj:
transport:
mp 30.279 30,279.354
17.107
13.172
0.000
0.000
17,107.243
13,172.111
0.000
0.000
1,000.000Platforma incarcare tir+drum acces(borduri si
pavaj rutier sarcina utila=40tone)
ASD1235
greutate materiale tone 38.848
manopera ore 4,760.840
material:
manopera:
utilaj:
transport:
mp 119.345 28,642.841
110.192
9.153
0.000
0.000
26,446.099
2,196.742
0.000
0.000
240.000Tunel de legatura intre hala veche si hala
noua(cadre metalice h= 4m,acoperis
tabla.protectii laterale din tabla,pardosea
sclivisita din beton armat)
TNU152
greutate materiale tone 215.254
manopera ore 32,880.000
Pag 2
STADIUL FIZIC: Constructii
0 1 2 3 4 5 = 3 x 4
OBIECTUL: Cort pe structura metalica h.streasina=6m
STADIUL FIZIC: Constructii
material:
manopera:
utilaj:
transport:
buc 2,650.104 2,650.104
994.659
1,655.445
0.000
0.000
994.659
1,655.445
0.000
0.000
1.000Usi sectionale pe fatada UZJK65
greutate materiale tone 0.011
manopera ore 3.700
totaltransportutilajmanoperamaterialprocent
149,308.687 0.000 6,730.243 68,588.966 73,989.479Cheltuieli directe:
R_AutolivRecapitulatia:
3,429.448 3,699.474 336.512 0.000Cheltuieli indirecte 7,465.4345.000 %
Total Inclusiv Cheltuieli indirecte: 77,688.953 72,018.414 7,066.755 0.000 156,774.122
10,802.762 11,653.343 1,060.013 0.000Profit 23,516.11815.000 %
Total Inclusiv Profit: 89,342.296 82,821.176 8,126.768 0.000 180,290.240
OBIECTUL: Cort pe structura metalica h.streasina=6m
STADIUL FIZIC: Proiectare si taxe
material:
manopera:
utilaj:
transport:
4eur
o/mp
3,312.629 3,312.629
0.000
3,312.629
0.000
0.000
0.000
3,312.629
0.000
0.000
1.000Proiectare arhitectua+organizare santier PZA23
manopera ore 1.350
material:
manopera:
utilaj:
transport:
3eur
o/mp
2,484.472 2,484.472
0.000
2,484.472
0.000
0.000
0.000
2,484.472
0.000
0.000
1.000Proiectare rezistenta PZR23
manopera ore 8.000
material:
manopera:
utilaj:
transport:
2.8% 8,250.320 8,250.320
0.000
8,250.320
0.000
0.000
0.000
8,250.320
0.000
0.000
1.000Taxe de avizare si punere in legalitate AVZ123
manopera ore 32.350
totaltransportutilajmanoperamaterialprocent
14,047.421 0.000 0.000 14,047.421 0.000Cheltuieli directe:
R_AutolivRecapitulatia:
702.371 0.000 0.000 0.000Cheltuieli indirecte 702.3715.000 %
Total Inclusiv Cheltuieli indirecte: 0.000 14,749.793 0.000 0.000 14,749.793
2,212.469 0.000 0.000 0.000Profit 2,212.46915.000 %
Total Inclusiv Profit: 0.000 16,962.261 0.000 0.000 16,962.261
Pag 3
STADIUL FIZIC: Proiectare si taxe
0 1 2 3 4 5 = 3 x 4
Cheltuieli directe: 163,356.109 0.000 6,730.243 82,636.387 73,989.479
Recapitulatie: 0.000 1,396.525 15,352.817 17,147.050 33,896.393
TOTAL GENERAL (faraTVA): 99,783.438 8,126.768 0.000 197,252.501 89,342.296
TVA: 21,442.151 23,948.025 1,950.424 0.000 47,340.600
TOTAL GENERAL: 110,784.447 123,731.463 10,077.192 0.000 244,593.102
1 euro = 4.528 lei, curs la data de 26/01/2014
Nota:
1) Masuratorile sunt realizate cat mai aproape de realitatea din teren,
2) Pt fiecare lucrare care va fi executata sa va intocmi obligatoriu situatie de lucrari conforma cu realitatea.
3) Oferta valabila 15 zile.
Executant,
Director General,