![Page 1: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/1.jpg)
CASE STUDY ON LCC - WICHITA FALLS
COST COMPARISON OF CRCP TO FULL DEPTH HMA
![Page 2: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/2.jpg)
LIFE CYCLE COST ANALYSIS (LCCA) US 287 / US 81 MONTAGUE COUNTY LCCA WITH 20/20 HINDSIGHT
![Page 3: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/3.jpg)
TABLE OF CONTENTS
3
4-5
6
7-9
10-13
14-19
1-2
20-23
Comparison of Continuously Reinforced Concrete Pavement (CRCP) to Full Depth Hot Mix Asphalt (HMA)
US 287 / US81 Montague County Maps
Wichita Falls District Leadership
Continuously Reinforced Concrete Pavement Overview
Hot Mix Asphalt Overview
Life Cycle Cost Analysis
Other Factors to Consider
1
2
3
4
5
6
7
![Page 4: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/4.jpg)
US 281 / US 81 MAP
4
![Page 5: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/5.jpg)
THE PROJECT LIMITS AND PAVEMENT TYPES
5
HMA
CRCP
![Page 6: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/6.jpg)
SPECIAL THANKS FOR 43 YEARS OF DATA COLLECTION
6
Larry Tegtmeyer, P.E. District Engineer
Wichita Falls
Allan Moore, P.E. Director of Construction
Wichita Falls
SS{
![Page 7: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/7.jpg)
WICHITA FALLS – CCRP SECTION HISTORY
US 81 from Bowie UPRR overpass to Wise county was completed in 1972 with a pavement section of 8” continuously reinforced concrete pavement over a 4” asphalt stabilized based over a 4”compacted foundation course. Maintenance over the next 40 years consisted of full depth repairs and surface texture to improve skid resistance.
7
![Page 8: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/8.jpg)
WICHITA FALLS – CCRP PHOTO
8
![Page 9: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/9.jpg)
WICHITA FALLS – CCRP PHOTO
9
![Page 10: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/10.jpg)
WICHITA FALLS – HMA SECTION HISTORY
In approximately 1976 TxDOT experienced drastic funding shortfalls, leading to staff reductions and reduced lettings. Completion of the Bowie expressway corridor was a high priority for the District, but economics forced the payment system to be reconsidered. Subsequently, US 287 from FM 174 to US 81 was completed in 1978 with a pavement section of 1.5”HMA over a one course surface treatment, over 11” flexible base, over 6”compacted subgrade. The plans note future construction of an additional 3” HMA. The section has been overlaid, seal coated, and crack sealed periodically since initial construction.
10
![Page 11: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/11.jpg)
US 287 NORTHBOUND DRIVING LANE APPROX STATION 404+00
11
![Page 12: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/12.jpg)
WICHITA FALLS – HMA PHOTO
12
![Page 13: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/13.jpg)
WICHITA FALLS – HMA PHOTO
13
![Page 14: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/14.jpg)
KEYS TO LIFE CYCLE COST ANALYSIS
• Initial construction methods, materials, & oversight
• Maintenance costs over lifetime of pavement
• Traffic and loading
• Climate (weather conditions) • Costs were available using actual unit costs and estimates using an HMAC price trend developed from actual costs found for adjacent projects
• Inflation factor (present value)
14
![Page 15: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/15.jpg)
US 287/US81 LIFE CYCLE COST WITH NO INFLATION ADJ
15
![Page 16: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/16.jpg)
US 287/US 81 LIFE CYCLE COSTS WITH NO INFLATION ADJ
16
LIFE CYCLE COST
![Page 17: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/17.jpg)
IMPORTANCE OF USING INDUSTRY COST INDEX
17
____________________________ CPI = Consumer Price Index ENR = Engineering News Record (Dallas) price index UDOT = Utah Department of Transportation construction composite cost index
![Page 18: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/18.jpg)
US 287/US81 LIFE CYCLE COST WITH COST INDEX
18
![Page 19: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/19.jpg)
US 287/US 81 LIFE CYCLE COST WITH COST INDEX
19
LIFE CYCLE COST
![Page 20: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/20.jpg)
OTHER FACTORS BESIDES LIFE CYCLE COSTS
LCCA provides critical information to the overall decision-making process, but not always the final answer. Other factors to consider:
• Risks
• Political concerns (such as available budgets, noise levels, and traffic delays)
• Environmental concerns (such as supply of materials, safety, recycling, and emissions)
20
![Page 21: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/21.jpg)
OTHER FACTORS QUICK REVIEW – HMA (BLACK)
Hot Mix Asphalt is seen as cost effective, smooth, quiet, safe, perpetual, versatile, environmentally friendly, and requires less traffic delays. The United States has more than 2 million miles of paved roads and highways, and 94% of those are surfaced with asphalt.
21
![Page 22: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/22.jpg)
OTHER FACTORS QUICK REVIEW – HMA (BLACK)
The Asphalt Pavement Alliance’s HMA Life-Cycle Costs Fact Sheet
• Reduces costs for initial construction.
• Requires less maintenance over the life of the pavement.
• When maintenance is needed, HMA offers the widest variety of alternatives geared to solve the precise problems on the roadway.
• Can be overlaid to add structural capacity to account for increased traffic loading.
• Properly designed and constructed HMA pavements will last 50 years or more with occasional resurfacing, relieving road agencies of the need for costly, time-consuming and disruptive reconstruction.
• HMA can be recycled (milled and replaced along with fresh materials), saving dollars and preserving nonrenewable natural resources
22
![Page 23: Cost Comparison of CRCP to Full depth HMA · 2017-01-04 · CASE STUDY ON LCC - WICHITA FALLS . COST COMPARISON OF ... 14-19 . 1-2 . 20-23 . Comparison of Continuously Reinforced](https://reader034.vdocuments.net/reader034/viewer/2022050611/5fb24f5b3b7e5564d9044c53/html5/thumbnails/23.jpg)
OTHER FACTORS – QUICK REVIEW - CRCP (WHITE)
The Massachusetts Institute of Technology’s Concrete Sustainability Hub released a report regarding life-cycle assessment (LCA) of concrete pavements. Among the findings; over 50 years, the mean real price of concrete decreases by 20% and the mean real price of asphalt increases by 95%. Ready Mix Concrete Association of Ontario (RMCAO) studies show that concrete and hot-mix asphalt performed similarly up to 2,000 trucks a day.
23