cost estimation
Embed Size (px)
TRANSCRIPT

S.No. Item
Land cost
1 Materials
i) Civil
Piling Construction
Pile Caps / Footing
Columns
Beams
Slabs

Staircase
Water Storage tank
Septic Tank
Water Treatment Plant
Wall Finishing
Door Work
Window Work

Flooring
Ceiling
Brickwork
Landscaping
Facilities
ii) Electrical
2 Machinery

4 Labour
TOTAL

Sub-items Quantity
Boundary Wall construction
Bricks
Cement
Sand
Earth work and land filling
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Bricks (simple flyash bricks)

Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Water Tank
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Septic Tank
Bricks (simple flyash bricks)
Cement
Sand
Coarse Aggregate
TMT steel reinforcement
Binding wires
Water Treatment Plant
Bricks (simple flyash bricks)
Inside Plaster
Inside Putty
Inside Painting
Inside Labor Work
Outside Plaster
Outside Painting
Outside Putty
Outside Labor Work
Door Panel
Door Framing
Door Locks and Accessories
Labor Work
Window Panels

Window Frame
Window Lock and Accessories
Labor Work
Floor Screeding
Tiles
Labor Work
Ceiling Cement Finish
Putty Work
Bricks
Cement
Sand
Labor Work
Grills
Floor tiles with flooring work
Woodwork
Door/window handles and other fixtures
Glasswork with aluminium frames for windows
Plumbing & water supply arrangements
Sanitary ware
Kitchen sink
Fire exinguisher
Electrical Equipment
Construction cost(including roads, garden)
RO Purifier 400 LPH
Generator
Transformenr
Wifi
Lift
Club house construction
Gym equip
TT table
Swimming Pool
Depatmental Store
Bus
500 KVA Transformer
Concrete batch mixing Plant
Excavator

Roller
Formwork/Shuttering
Internal and external Vibrator
Hoists/crane
Dumper
Concrete pump
Transportation and fuel
Labour associated with construction
Electric fittings
Manpower for handling and maintenance of Equipments

Rate1(MRP) Rate2(Bulk price)
12,500,000.00 12,500,000.00
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 1,300 Rs. 1,100
Rs. 2,200,000 Rs. 2,000,000
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00

bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
Rs. 216,000 Rs. 190,300
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
cubic ft Rs. 448,000 Rs. 398,000
bricks Rs. 7.00 Rs. 5.00
bags Rs. 330 Rs. 280
cubic metres Rs. 400 Rs. 300
cubic metres Rs. 1,300 Rs. 1,100
metric tonnes Rs. 48,000 Rs. 42,000
metric tonnes Rs. 44,000 Rs. 40,000
bricks Rs. 7.00 Rs. 5.00

cubic metre Rs. 286,524 Rs. 268,350
sq. feet Rs. 55 Rs. 42
cubic feet Rs. 2,800 Rs. 2,300
apartments 1,200.00 1,100.00
sq. feet Rs. 350 Rs. 250
apartments Rs. 25,000 Rs. 23,000
apartments Rs. 44,000 Rs. 39,000
apartments Rs. 10,000 Rs. 8,000
required 12,000.00 Rs. 10,500
apartments 7,985.00 Rs. 9,000
Rs. 1,800,000 Rs. 1,700,000
unit 250,000.00 200,000.00
units 2,000.00 1,700.00
8 PAX 900,000.00 500,000.00
1,500,000.00 1,000,000.00
400,000.00 300,000.00
27,000.00 25,000.00
800,000.00 650,000.00
1,500,000.00 1,200,000.00
1,000,000.00 800,000.00
Rs. 260,000 Rs. 230,000
49,000.00 45,000.00

sft 375.00 362.00
1,450.00 1,400.00
65,000.00 62,000.00
140,000.00 135,000.00
31,023.75 23,851.44
sq. feet construction area Rs. 180 Rs. 160
Sqft Rs. 18 Rs. 12

Cost 1(Rs.) Cost 2
12,500,000.00 12500000
per brick - -
per bag - -
per cubic metre - -
2,200,000 2,000,000
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -

per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per Tank 216,000 190,300
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per Tank 448,000 398,000
per brick - -
per bag - -
per cubic metre - -
per cubic metre - -
per metric tonne - -
per metric tonne - -
per brick - -

per cubic metre - -
per sq. feet - -
per cubic metre (Teak wood) - -
per unit - -
per sq. metre (6mm thick) - -
per apartment - -
per apartment - -
- -
per set - -
per apartment - -
1,800,000 1,700,000
per unit - -
per unit - -
per set - -
per unit - 1,000,000
per unit 400,000 300,000
per unit 27,000 25,000
per unit 800,000 800,000
per unit 1,500,000 1,500,000
per unit 1,000,000 800,000
per transformer 60,000 -
machine 49,000 45,000

per kg - -
1,450 1,400
65,000 62,000
140,000 135,000
31,024 23,851
3,600,000 3,600,000
per sq. feet - -
Per sqft - -
in lakhs 248.37 250.81
per flat 3.88 3.92
Contigency 0.20 0.20
Net Cost 4.66 4.70
proposed cost 6.19 6.25