.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected] Proudly serving Parker Abex since 1990 Proudly serving Parker Abex since 1990 What We Do for Parker What We Do for Parker -- Parnassus 011028a.ppt Engineering Analysis / Reporting -- Graphical Production -- Software Development / Database D Since 1990, Abex Aerospace, and subsequently Parker Aerospace, has relied on Parnassus for a variety of analytical and graphical services, to include: o Reliability performance and UR analysis and reporting o Maintenance operating cost & PBH analyses and reports o Ad hoc and Product Improvement analysis / reports o On-Site reliability & maintenance data acquisition o On-Site presentations and planning meetings at Parker sites o Operator presentations and technical interface for Parker o Tech-Graphics illustration and production While providing routine reliability reporting services starting in 1990, Parnassus has generated numerous documents in response to ad hoc requests for targeted reliability reports, cost of ownership analyses, failure trend reports, Abex and Vickers pump reliability comparisons, Failure Mode & Effects Analyses, and graphic arts services. As an example, Parnassus provided the technical response that refuted the so-called QANTAS' 5030 Report which made the case to Boeing that the Vickers B747-400 EDP was more reliable than the World Pump in early service at Qantas. Parnassus' analyzed Qantas removal data and convincingly demonstrated to Boeing and Qantas' satisfaction that their conclusion was flawed and that the opposite was true, AP15V-027-01 was more reliable than Vickers Model PV3-240. Parnassus has on occasion labored side-by-side for weeks beyond the original contract scope & without PO change, e.g. to support Abex NWL OEM FMEA analyses, Boeing Metrics reports, Color Flow Schematics and the ALS Software for PMP2V-7D-10, PMP2V-31-02 and AP19V-18-04 etc. Parnassus steadfastly endeavors to deliver professional services while maintaining flexibility and responsiveness to Parker's needs. As an independent contractor, Parnassus has developed unique familiarity with Abex NWL products, and vagaries of your customer reporting formats and needs and feels justifiably proud of our contributions. Parnassus is very appreciative of the

Upload: katy

Post on 22-Jan-2016

45 views

Category:

Documents


0 download

DESCRIPTION

Since 1990, Abex Aerospace, and subsequently Parker Aerospace, has relied on Parnassus for a variety of analytical and graphical services, to include: o Reliability performance and UR analysis and reporting o Maintenance operating cost & PBH analyses and reports - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Since 1990, Abex Aerospace, and subsequently Parker Aerospace, has relied on Parnassus for a variety of analytical and graphical services, to include:

o Reliability performance and UR analysis and reporting o Maintenance operating cost & PBH analyses and reportso Ad hoc and Product Improvement analysis / reportso On-Site reliability & maintenance data acquisition o On-Site presentations and planning meetings at Parker sites o Operator presentations and technical interface for Parkero Tech-Graphics illustration and production

While providing routine reliability reporting services starting in 1990, Parnassus has generated numerous documents in response to ad hoc requests for targeted reliability reports, cost of ownership analyses, failure trend reports, Abex and Vickers pump reliability comparisons, Failure Mode & Effects Analyses, and graphic arts services.

As an example, Parnassus provided the technical response that refuted the so-called QANTAS' 5030 Report which made the case to Boeing that the Vickers B747-400 EDP was more reliable than the World Pump in early service at Qantas. Parnassus' analyzed Qantas removal data and convincingly demonstrated to Boeing and Qantas' satisfaction that their conclusion was flawed and that the opposite was true, AP15V-027-01 was more reliable than Vickers Model PV3-240.

Parnassus has on occasion labored side-by-side for weeks beyond the original contract scope & without PO change, e.g. to support Abex NWL OEM FMEA analyses, Boeing Metrics reports, Color Flow Schematics and the ALS Software for PMP2V-7D-10, PMP2V-31-02 and AP19V-18-04 etc.

Parnassus steadfastly endeavors to deliver professional services while maintaining flexibility and responsiveness to Parker's needs. As an independent contractor, Parnassus has developed unique familiarity with Abex NWL products, and vagaries of your customer reporting formats and needs and feels justifiably proud of our contributions. Parnassus is very appreciative of the confidence that Parker has invested in our services.

Page 2: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Cost of Ownership AnalysisCost of Ownership Analysis (cover) (cover)

Parnassus provides many Reliability ServicesParnassus provides many Reliability Services to Parker annually and as needed to support current call-out marketing initiatives. Both the annual as well as the as needed services are funded by a flat-rate, level of effort contract. The funding level is set for an average of 12.5 hours per week

PMP2V-31-03 Reliability

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

Total'97

Total'98

Total'99

Total'00

YEAR

AIR

CR

AFT

OPE

RA

TIN

G H

OU

RS

MTBF (in hrs.)MTBUR (in hrs.)

PMP2V-31-03 Series Reliability

0

5

10

15

20

CMC Sts Msg High or LowPressure

Inop PhysicalDamage -

Conn

Others

Reasons for Removal

Tota

l UR'

s per

Yea

r 97

98

99

00

Operator/Aircraft Fleet

A/C Fleet Operating hrs.ACMP Unit Operating hrs.# of A/C in Fleet 0 0 0 0 0 0

total conf total conf total conf total conf total conf total conf total conf

External Leakage 0 0 0 0 2 2 0 0 2 2Shaft Seal Leakage 0 0 0 0 0 0 0 0 0 0High or Low Pressure 3 3 3 3 2 2 5 1 13 9Pops Circuit Breaker 0 0 0 0 0 0 1 0 1 0Defective Motor 0 0 0 0 1 1 0 0 1 1Inop 3 2 1 0 0 0 2 0 6 2Overheat 1 1 1 0 0 0 0 0 2 1CMC Sts Msg 2 1 0 0 19 0 6 0 27 1MIS 0 0 2 2 0 0 0 0 2 2Other 1 0 2 2 0 0 0 0 3 2ACMP Removals (Chargeable): 10 7 7 5 24 5 14 1 0 0 0 0 57 20

MTBF (in hrs.)

0 0 0 0 0 0

total conf total conf total conf total conf total conf total conf total conf

Line Break (Run Dry) 1 0 0 0 0 0 0 0 1 0Precautionary 2 1 0 0 1 0 0 0 3 1Physical Damage - Conn 1 0 2 0 1 0 0 0 4 0Convenience 0 0 0 0 0 0 0 0 0 0

ACMP Removals (Nonchargble): 4 1 2 0 2 0 0 0 0 0 0 0 8 1

Total Removals (all):URR (PRR)

MTBUR (in hrs.)

650.01661,804

0#DIV/0!#DIV/0!

0#DIV/0!#DIV/0!

260.02

54,347

140.02

51,345

140.03

36,878

90.01

152,120

Reason for Removal (Nonchargeable)

73,757 273,816 282,606

Total '97 Total '98 Total '99 Total '00 All Years

#DIV/0! #DIV/0! 200,862718,827

Total '00 All YearsReason for Removal (Chargeable):

Total '97 Total '98 Total '99

516,29643

342,2701,369,081

70

All Years129,074

Total '97 Total '98 Total '99 Total '00

1,413,03189

179,707718,827

32

354,7584,017,235

234

1,005,809

Parker Abex/NWL -- ACMPUnscheduled Removal Rate (URR) & Reasons

A/C Operator: Industry Wide MTBUR & MTBFDate: _21 Aug 2001____ Your Name: PB, KH, TK, BDTele: 805-552-9552_ Email: [email protected] ___

Pump Model: PMP2V-31-03___ Part No: 66133-03___

Reporting Period: 1997 through 2000Hard Time: ___N/A______ Soft Time: ___N/A______Overhaul Interval (Time): ____N/A_______

Year-End Reliability and UR ReportsYear-End Reliability and UR Reports

New this yearNew this year (Boeing rqst’d) (Boeing rqst’d) Reliability and UR Trends Reliability and UR Trends reports for all top selling EDP/ADP’s & ACMP’s. Shown (below & right) is the PMP2V-31-03 (preliminary)

Page 3: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Shown below is a Reliability Summary report. The format, which was developed by Parker (Bill Detweiler) and Parnassus in 1996, presents fleet statistics and top-level UR data stored in the Composite Matrix (i.e. a flat-file spreadsheet containing several years of field reliability data on Parker’s top sellers). he Composite Matrix has been found corrupted (possibly from a bad-sort or filter, etc) and more than once needed back-check (repaired) which is very time consuming. The idea to build a Reliability Database (MS Access, design in-process) was born of the need to resolve this problem.

In comparison to the Year-end Reliability and UR reports (preceding page), the Parker Reliability Summary report give CSM’s a top-level review of each model with performance statistics by airline customer in an attractive one (1) page summary format.

Composite Matrix Report Composite Matrix Report (MTBUR & MTBF Industry-wide)

Industry Reliability / Composite Matrix RptIndustry Reliability / Composite Matrix Rpt (annual & when requested)

Page 4: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Parnassus actively participatesParnassus actively participates in the acquisition of in-field reliability performance data by:

• preparing training aids and forms, • meeting / discussing reliability issues in person and in email, • supporting a flexible yet minimal criteria for reliability data obtained by CSE’s & CSM’s, • directly receiving reliability data submittals via email, • processing data submittals (including feedback), and • providing off-site custodial duties of reliability data in electronic / paper formats.

Data Acquisition & CSE LiaisonData Acquisition & CSE Liaison

Source, Input, Training, Outputs in a Closed-Loop, Controlled SystemSource, Input, Training, Outputs in a Closed-Loop, Controlled System

Normal Reliability Process Flow Diagram

Raw DataRaw DataAcquisitionAcquisition

Rel Rel TrainingTraining& Dialogue& Dialogue

Database &Database &ScrubbingScrubbing

Source DataSource DataCoordinationCoordination

• Technical Knowledge (Customer / Aircraft / Model & mods / possible effect to Parker)• Customer Rapport & Understanding each Airline’s Operation & Needs• Marketing Savvy - Front Line Experience with all elements involved in scenario(s)

Direction &Direction &ControlControl

Analysis &Analysis &ReportsReports OutputOutput

Input : Airline Input : Airline Maint Maint CentersCenters

Tech Questions/Analysis Rvw / Report Approvals

Strategic Approach, History, Relevant Specifics ...

Par Par Parker

CSE / CSM / Par / etc. Par

Parker / Billy D

Composite MatrixRel Summary (by Model/AC)

Cost of OwnershipPerformance Trends

Failure Mode Analyses

… … including including (see below):

Field Data Acquisition, Processing and Training Diagram Field Data Acquisition, Processing and Training Diagram (source: Rel2000.ppt)

Additionally each year, on Parker’s behalf, Parnassus acquires and processes Parnassus acquires and processes RMO maintenance records directly from UAL and AZO.

Page 5: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Parnassus ad hoc analysis reportsParnassus ad hoc analysis reports are periodically needed to address and resolve specific issues faced by the Call-Out group. Because our findings and conclusions are those of an independent third party, our experience has been that the reports are well received and acknowledged by Parker’s customers.

While working closely with CSO, we are able to 1) maintain an open and honest point of view during analysis and 2) query the detailed data to confirm or refute Parker’s hypotheses or concepts which can go a long way in substantiating your position.

Ad Hoc Analysis ReportsAd Hoc Analysis Reports

Cost of Ownership AnalysisCost of Ownership Analysis (typ cover) (typ cover)

Maintenance Operating Cost AnalysisMaintenance Operating Cost Analysis (aka Cost of Ownership) (aka Cost of Ownership)

Maintenance Operating CostsMaintenance Operating Costs are an important consideration in any Call-Out procurement decision. Most airlines operate on a tight margin and need to economize to survive. Thus, since the costs to maintain a Vickers pump can be in some cases more than twice what it costs to maintain a Parker pump, the life cycle cost savings of the decision can be very convincing.

Page 6: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Parnassus liberates a thousand wordsParnassus liberates a thousand words of techno-speak with the creativity of a single graphic image and applies them in a variety of integrated Tech-Graphical reports, presentations and Marketing tools (e.g. Color Flow Schematics, etc) for Parker. Communicating perspective more fluently than your competition is one way to win in a competitive marketing environment.

The Color Flow Schematic (shown below) is a cut-away view of the PMP2V-7D-07/10 Parnassus derived by scanning an existing Engineering print then modifying the elements & colors to Parker’s satisfaction.

Color Flow Schematic - PMP2V-7D-07/10Color Flow Schematic - PMP2V-7D-07/10

Page 7: Cost of Ownership Analysis  (cover)

.prepared by: Parnassus Parnassus http:www//parnassus.org - email: [email protected]

Proudly serving Parker Abex since 1990Proudly serving Parker Abex since 1990

What We Do for ParkerWhat We Do for Parker -- Parnassus 011028a.pptEngineering Analysis / Reporting -- Graphical Production -- Software Development / Database Design & Maintenance

Parnassus has developed two Windows 9x/NT database software applications using Visual Basic as the front end, MS Access and the database and Crystal Reports Writer as the report generation development environments. Both software packages have been successful in terms of the things we’ve been able to combine into a database application, e.g. point & click user interface / data input, etc.

In particular, Airline Software (ALS) - see brochure - was an extraordinary development in terms of capability and features. It was also an integral part of the Singapore Airlines 777 Call-Out which was a success for Parker.