ObservationDuring observing markets in Lahore, We found thatPrices of yarn increasing day by day as increase in Costof Production.
-
8/7/2019 Cost of Production(3)
4/39
PROBLEM STATEMENT
yWhat Factors are responsible forvariation in cost of production?
-
8/7/2019 Cost of Production(3)
5/39
Preliminary Data Gathering: (PDG)
Industries are producing many products and exporting them
to all over the world.But due to recent Inflation in Pakistan the Cost of Productionis at its Boom level.
Our research is focus on Textile Product Yarn.
-
8/7/2019 Cost of Production(3)
6/39
Preliminary Data Gathering: (PDG)
(Literature Review)
We observed data from Literature survey from manysources
(1)www.fbr.gov.pkIt tells us about increasing Tax Rates. Sales Tax is 16%in 2010-11 that was 15%. Many Exempted Things arenow Taxable. High ImportDuty.
(2) www.brecorder.comWe found Raw Material Prices, Power & Fuel,Taxations etc. (Cotton Price is Rs. 9500/Mund on 6-10-2010 that was Rs. 2500 in 2009-10. Polyester Prices Rs.
157/Kg today. It was 125/KG in 2009(Petrol, Electricity
-
8/7/2019 Cost of Production(3)
7/39
Preliminary Data Gathering: (PDG)
Through InterviewsGhazi Fabrics International Limited Head Office islocated
8-C, Block E-III,Gulberg III, Lahore - 54660. PakistanPh: (92-42) 576 4026-8 (3 lines)Fax: (92-42) 576 4032
-
-
8/7/2019 Cost of Production(3)
8/39
Some References
Sr # Name Designation Cell Number
1 Mr. Muzamil Tahir Finance Manager (Chiniot Textile) 03224386478
2Muhammad Abid
Hanif
Chief Accountant (Ghazi Fabrics Int) 03217515207
3 Mr. Ali Sattar Accountant (Chiniot Textile Mills Ltd) 03228075723
4 Mr. Ayaz Sb
Mill Manager
Production & Operations (Chiniot
Textile)
------
5 Mr. Sidique Sb Marketing Manager (Chiniot Tex) -------
-
8/7/2019 Cost of Production(3)
9/39
Dependent Variable
Cost of Production
-
8/7/2019 Cost of Production(3)
10/39
Independent Variables1. - Raw Material Prices2. - Inflation
3. - Depreciation Rate4. - Utility Bill Prices (Electricity, Fuel, SuiGas,
Petroleum)5. - No of Labor Workers6. - Govt. Policies7. - TaxRates
8. - Quality ofRaw Material9. - Facility Arrangement10. - Technology11. - IMF Policies
12. Load shedding
-
8/7/2019 Cost of Production(3)
11/39
Independent Variables(Prioritized)
1. - Utility Bills
2. - Labor Workers
3. - Raw Material Prices
4. - Technology
-
8/7/2019 Cost of Production(3)
12/39
MODERATING VARIABLES
1. Inflation2. IMF Policies
-
8/7/2019 Cost of Production(3)
13/39
Theoretical Framework
Cost ofProduction
Raw Material
Prices
Utility Bills
Labor
Workers
Technology
Inflation
IMF Policy
-
8/7/2019 Cost of Production(3)
14/39
Nature And Direction
Raw Material Prices (Direct) +
Utility Bills (Direct) +
Cost of
Production Labor Workers (Direct) +
(D
irect)
Technology (Indirect) -
-
8/7/2019 Cost of Production(3)
15/39
Logical Statements
-If Raw Material prices increase then theCost of Production will increase.
-If Utility Bills increase then the Cost ofProduction will also increase.
-If Number of labor workers increases thenthe Cost of Production will increase.
-If Industry use Low technology then cost ofProduction will increase.
-
8/7/2019 Cost of Production(3)
16/39
Research Design-PURPOSE OF STUDY
EXPLORATORY (Pure)
-TYPE OF INVESTIGATION
NON CAUSAL (Correlational)
-STUDYSETTING
NON-CONTRIEVED (Natural) (Field Studies)
-
8/7/2019 Cost of Production(3)
17/39
Research Design-TIME HORIZON
Longitu
dinal(Time Varies)-UNIT OF ANALYSIS
Individual
-EXTENT OF INTERFERENCEMinimal
-
8/7/2019 Cost of Production(3)
18/39
OUR STAKE HOLDERS
y Ghazi Fabrics International Limited
y LESCO
yWAPDAy Raw Material Parties
-
8/7/2019 Cost of Production(3)
19/39
Samplingy Non probability sampling is used due to time and capital
constraint.
y In Non prob. Sampling, QUOTA SAMPLING is used.The area in which research is conducted is Lahore.Completing 45 samples, we have made Three quotas,
1 Textile Industry (Ghazi Fabrics)
2 Raw Material Parties (Cotton/Polyester Parties)
3 Fuel Provide Companies(WAPDA,SUI GAS, LESCO)
y
15 samples from Fuel Provider Co., 15 from Raw MaterialParties and 15 from industry Employees.
-
8/7/2019 Cost of Production(3)
20/39
Analysis ofquestionnaire
-
8/7/2019 Cost of Production(3)
21/39
Introductiony I am a student of Pak-Aims INSTITUTE OF MANAGEMENT
SCIENCES (IMS), completing my MBA. I am conducting this
research to complete my academic exercise. I am conducting aresearch on Cost of Production to investigate that what factors areresponsible for variation of Cost of Production? I am trying to findout the key contributing factors of this problem by this particularresearch.
Your contribution by providing precious information regarding thatspecific research will be highly appreciated. This research will also be
very useful for you to boost up moral values of people and itsresponsibility of every person to respond effectively. After finding
specific results of this research, your industries can manage longterm decision making towards overall profit of the organizations andminimize of cost. This information given by youwill only be used forthis research and will remain as highly confidential.
y The results of this specific research will be provided to you through
e-mail if youwilling to know about the findings & results.
-
8/7/2019 Cost of Production(3)
22/39
Utility Bills PricesThe Prices ofUtilitybills (Sui Gas, Electricity) are.
80%
13%
7%
High
Average
Low
-
8/7/2019 Cost of Production(3)
23/39
Utility Bills PricesIMF Policyabout increasing Utilitybills is fair.
27%
60%
13%YES
NO
No Idea
-
8/7/2019 Cost of Production(3)
24/39
Raw Material PricesInflation affecting prices ofRaw material.
87%
6%
7% Yes
No
No Idea
-
8/7/2019 Cost of Production(3)
25/39
Raw Material Prices
The prices of raw Materials not remain constantwithPassage of time.
67%
27%
6% Yes
No
No Idea
-
8/7/2019 Cost of Production(3)
26/39
Labor Workers
You think that Labor Cost is affordable.
27%
53%
20%
Yes
No
Sometimes
-
8/7/2019 Cost of Production(3)
27/39
Labor Workers
In your opinion, that Laborwages are high due to
27%
20%
40% 13%
Inflation
Availability ofLabor
Labor Policy
Competition
-
8/7/2019 Cost of Production(3)
28/39
TechnologyYou are using latest Technology in the production department.
27%53%
20% Yes
S metimes
-
8/7/2019 Cost of Production(3)
29/39
The Technology you are using is enough for manufacturing.
Technology
20%53%
27%
Yes
No
No Idea
-
8/7/2019 Cost of Production(3)
30/39
Analysis & Interpretationy
80 % Employees of LESCO & Wapda said thatthe prices ofutility bills are very high
y 60% Empolyees of LESCO & Wapda said thatIMF policy regarding Utility prices is not fair.
y 87% Raw Material Parties said that inflation isaffecting prices of Raw material.
y 67% Raw Material Parties said that prices are
not constant with time to time.y 53% Employees of Textile Industry said that
Labor cost is not affordable.
-
8/7/2019 Cost of Production(3)
31/39
Analysis & Interpretationy
40% employees of the Textile Industry said thatLabor cost is increasing due to Govt Policy regarding labor.
y 53% Employees of The Textile Industry said that
they are not using Latest Technology for itsproduction process.
y 53% Employees of The Textile Industry said that
they have not enough technology for theProduction Process.
-
8/7/2019 Cost of Production(3)
32/39
Results & Findingsy
Most employees of LESCO and WAPDA think that theprices ofutility bills are increasing day by day that isdirectly effecting Textile Industries.
y IMF Policies are also leaving bad effects on many
industries specially Textile Industry. So This leadsindirectly to Cost of production High.
y The Parties of Raw Material are in favor of thisresearch and said that inflation is increasing day by
day that is directly effecting prices of many produ
cts.y The prices are not same. If one product is having price
8000 per mund then next day it manyup by 10000 permund.
-
8/7/2019 Cost of Production(3)
33/39
Results & Findingsy
Industry Employees think that Labor cost is very highand is not affordable.
y Govt. policies is directly effecting High Labor cost thatis leading to high Cost of Production.
y Some Employees think that they Have not Latesttechnology in the country thats why they could notoperate production process efficiently.
y Many Employees are in favor of Technology they think
that they should have enough technology to run theoperations correctly. So they have not enoughTechnology. So their Cost of Production is very High.
-
8/7/2019 Cost of Production(3)
34/39
yAfter findings all the Independent Variables aredirectly affecting Cost of Production.
-
8/7/2019 Cost of Production(3)
35/39
Recommendationy Industries should purchase more raw material when prices
are very low and keep maximum stock of low priced RawMaterial.
y In order to minimize Cost of Production industry shouldminimize the utilization of Labor workforce. The workforceshould be given proper training to become eligible forproduction operations.
y Industry should buy latest technology for the productionprocess. It should open education institution that willeducate people who will make technology themselves infuture rather than they import it.
y They should minimize Electricity and Gas. They shouldOFF Air conditions etc when there is not need. They shouldshout down extra machines in the Factory.
-
8/7/2019 Cost of Production(3)
36/39
Research Limitation & Constraintsy TI
ME LIM
ITA
TIO
N:---Time was the major factor inconducting result.
y LOW CORDINATION:-- Some stack holdersemployees dont coordinate thats why we could not
got enough information.y LIMITED ACCESIBILITY:--Individuals were not
ready to give us the full access to the information.
y INDIVIDUAL BEHAVIOR:--Individual behavior of
some of the employees was not satisfactory and it wasdifficult to gather information from these.
y RESOURCE CONSTRAINT:---Not enoughResources to conduct research.
-
8/7/2019 Cost of Production(3)
37/39
Method Used to Analyze Data
yMicrosoft Excel
ySPSS Software
-
8/7/2019 Cost of Production(3)
38/39
Hallmarksy PURPOSIVENESS
Ou
r Pu
rpose is to complete the Academic Project that is on theVariation in Cost of Production factors.
y OBJECTIVITY
From literature Survey we found that 150% (approx..) increasein Cost of Production from previous year.
In simple words Cost of Production has increased from pastyear from our findings.
y CONFIDENCE
We have confidence as a researcher what we have done in orderto conduct this research is accurate.
-
8/7/2019 Cost of Production(3)
39/39
Some Interesting Findings
y Cost of Production is also hidden nature. Some factorsalways remain hidden in the production like waste fromcotton etc..that is actually increasing cost of Production.
y Capacity of Machines that are not working well candecrease the production process.
y Inefficiency of labor can increase the cost of production.