JORNADA LABORAL POR DIA 8 NUMERO TOTAL DE TECHO 10 VOLUMEN DEL TECHO 0.297 ANALISIS DE COS PARTIDA : Fabricacion de Techo RENDIMIENTO : 3 DESCRIPCION UNIDAD MANO DE OBRA OPERARIO hh OFICIAL hh PEON hh MATERIALES ALAMBRE NEGRO # 16 Kg. Var. Var. CEMENTO PORTLAND TIPO I (42.5KG.) bls. ARENA GRUESA PIEDRA CHANCADA DE 3/4" AGUA, INCLUYE TRANSPORTE A PIE DE OBRA ACEITE QUEMADO gln. MARCO Y TAPA DE CONCRETO ARMADO PARA BUZON Und. EQUIPO Y HERRAMIENTAS HERRAMIENTAS % M.O. MOLDE METALICO PARA BUZON hm. VIBRADOR DE CONCRETO 4 HP 18PL 1.50" hm. MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3 hm. ARMADO DE ESTRUCTURA COSTO UNITARIO DIRECTO C/IGV(S/.) GASTOS GENERALES UTILIDAD SUBTOTAL IMPUESTO GRAL. A LA VENTA TOTAL(S/.) ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(Ø=1/2") ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(Ø=5/8") m 3 m 3 m 3

Upload: z-set-z-caceres

Post on 25-Jan-2016

42 views

Category:

Documents


0 download

DESCRIPTION

costos

TRANSCRIPT

Page 1: Costos Unitarios Set

JORNADA LABORAL POR DIA : 8 hNUMERO TOTAL DE TECHO : 10 Und.VOLUMEN DEL TECHO : 0.297

ANALISIS DE COSTOS UNITARIOS

PARTIDA : Fabricacion de Techo de BuzonRENDIMIENTO : 3 Und./dia

DESCRIPCION UNIDAD CANTIDAD

MANO DE OBRAOPERARIO hh 0.267OFICIAL hh 2.667PEON hh 2.667

MATERIALESALAMBRE NEGRO # 16 Kg. 2

Var. 2.00Var. 1.00

CEMENTO PORTLAND TIPO I (42.5KG.) bls. 2.50ARENA GRUESA 0.17PIEDRA CHANCADA DE 3/4" 0.25AGUA, INCLUYE TRANSPORTE A PIE DE OBRA 0.034ACEITE QUEMADO gln. 0.001MARCO Y TAPA DE CONCRETO ARMADO PARA BUZON Und. 1.000

EQUIPO Y HERRAMIENTASHERRAMIENTAS % M.O. 3MOLDE METALICO PARA BUZON hm. 3VIBRADOR DE CONCRETO 4 HP 18PL 1.50" hm. 0.56MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3 hm. 0.64

ARMADO DE ESTRUCTURA 1COSTO UNITARIO DIRECTO C/IGV(S/.)

GASTOS GENERALESUTILIDADSUBTOTAL

IMPUESTO GRAL. A LA VENTATOTAL(S/.)

m3

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(Ø=1/2")ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(Ø=5/8")

m3

m3

m3

Page 2: Costos Unitarios Set

ANALISIS DE COSTOS UNITARIOS

Fabricacion de Techo de Buzon UNIDAD : Und.PRECIO S/. : 556.252

18.000 4.80017.27 46.053

13.190 35.17386.03

4.350 8.70028.000 56.00039.600 39.60020.000 50.00039.150 6.65654.920 13.7302.950 0.101

11.234 0.008175.000 175.000

349.79

86.027 2.58111.350 34.0505.000 2.800

25.000 16.00055.43

65 65 65556.252

10% 55.62520313532988% 44.5001625082638

656.37718% 118.147931459441

774.525

PRECIO UNITARIO S/.

C/IGV

PRECIOPARCIAL

S/.

SUBTOTALS/.

Page 3: Costos Unitarios Set

CARACTERISTICAS DEL TECHO DE BUZONH(m.) D(m.) AREA(m^2) VOL.(m^3)

0.2 1.5 1.767 0.3530.2 0.6 0.283 0.057

VOLUMEN TOTAL (m^3) : 0.297

CARACTERISTICAS DE 1 BALDE

Unidad Cantidad

ALTURA m. 0.39000DIAMETRO m. 0.27250VOLUMEN m^3. 0.02275

PROPORCION DE MATERIAL

En Campo Para Analisisunidad cantidad unidad cantidad

CEMENTO PORTLAND TIPO I (42.5KG.) bls. 1 m^3 0.0283ARENA GRUESA baldes 3 m^3 0.0682PIEDRA CHANCADA DE 3/4" baldes 4 m^3 0.0910AGUA baldes 1.5 m^3 0.0341

VOLUMEN TOTAL (m^3) : 0.1875

220149369

Page 4: Costos Unitarios Set
Page 5: Costos Unitarios Set

CAMBIO DE TECHO DE BUZON

JORNADA LABORAL POR DIA : 8 hNUMERO TOTAL DE TECHO : 1 Und.

ANALISIS DE COSTOS UNITARIOS

PARTIDA : ROTURA Y RETIRO DE TECHO MANUAL E=3"

RENDIMIENTO : 6.185011

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.13OPERARIO hh 2 2.59PEON hh 2 2.59

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00

PARTIDA : COLOCACION Y VACEADO DE CONCRETO PARA SELLADO RENDIMIENTO : 8 Und./DIA

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.10OPERARIO hh 2 2.00PEON hh 2 2.00MATERIALESCEMENTO PORTLAND TIPO IP (42.5KG.) bls. 0.50ARENA FINA 0.03

ARENA GRUESA 0.061

AGUA 0.012TECHO PREFABRICADO und. 0.000TAPA DE CONCRETO und. 0.000EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00

Partida UNIDAD PRECIO METRADO

M2/DIA

m3

m3

m3

Page 6: Costos Unitarios Set

ROTURA Y RETIRO DE TECHO MANUAL E=3" M2 83.559 2.545COLOCACION Y VACEADO DE CONCRETO PARA SELLADO DE Und. 78.437 1.000

TOTAL

COSTO UNITARIO DIRECTO C/IGV(S/.)GASTOS GENERALES

UTILIDADSUBTOTAL

IMPUESTO GRAL. A LA VENTATOTAL(S/.)

Page 7: Costos Unitarios Set

CAMBIO DE TECHO DE BUZON

DATOS DEL TECHOD(m) 1.5

Area(m2) 1.76714586764426ANALISIS DE COSTOS UNITARIOS

DATOS DEL TAPAROTURA Y RETIRO DE TECHO MANUAL E=3" UNIDAD : D(m) 0.6

PRECIO A : 83.559 Area(m2) 1.4804406601634

18.00 2.32817.27 44.67613.19 34.121

81.125

81.125 2.4342.43

COLOCACION Y VACEADO DE CONCRETO PARA SELLADO UNIDAD : Und.PRECIO A : 78.437

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

18.00 1.800 bolsas17.27 34.540 7.0013.19 26.380 0.50

62.72020.000 10.00040.700 1.250

41.300 2.537 COSTO DE MATERIAL PARA UN TECHO4.000 0.049 Volumen del techo de Buzon

329.189 0.000 Espesor(m)90.000 0.000 Volumen(m3)

13.836 COSTO DE UN TECHO DE BUZON62.720 1.882 MATERIALES

1.88 CEMENTO PORTLAND TIPO IP (4ARENA GRUESA

PARCIAL PIEDRA CHANCADA DE 3/4"

M2

PRECIO UNITARIO S/.

C/IGV

PRECIOPARCIAL

S/.

SUBTOTALS/.

PRECIO UNITARIO S/.

C/IGV

PRECIOPARCIAL

S/.

SUBTOTALS/.

J32
Catastro Tecnico 010: AQUÍ SOLO COLOCAR LA CANTIDAD DE BOLSAS QUE SE VIO.
Page 8: Costos Unitarios Set

212.632 AGUA78.437 ALAMBRE NEGRO # 16

291.069MARCO DE FIERRO FUNDIDO PA

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

291.069 bolsas10% 29.106879336 1.008% 23.285503469 2.50

343.46118% 61.823011709

405.284

PROPORCION DE MATERIAL

ARENA GRUESA

AGUA VOLUMEN TOTAL (m^3) :

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(

ACERO CORRUGADO (Ø=1/2")

CEMENTO PORTLAND TIPO I (42.5KG.)

PIEDRA CHANCADA DE 3/4"

Page 9: Costos Unitarios Set

hrs m22 1.76714587

2.54469004941 7 6.18501054

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

arena fina(m3)arena gruesa(m3)agua(m3)0.43 0.86 0.170.03 0.06 0.01

COSTO DE MATERIAL PARA UN TECHO

0.20.057 PRECIO S/. 329.18943 Vol: 0.49

COSTO DE UN TECHO DE BUZONUNIDAD CANTIDAD PRECIO UNIT PRECIO

bls. 2.50 20 500.17 39.15 6.624180.25 54.92 13.73

m3

m3

K38
Catastro Tecnico 010: ingresar solo este dato
P39
atc007: este vol. Debe ser similar a el vol. Del techo.
Q39
atc007: se descuenta el agua debido a que esta solo tiende a reaccionar y contraer el volumen en la mescla.
Page 10: Costos Unitarios Set

0.07 2.95 0.19175Kg. 2 4.35 8.7Kg. 22.275 3.14 69.9435 27.9774

Und. 1 180 180

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

Arena(m3) Piedra(m3) agua(m3)Bolsa cemento(m3)0.07 0.10 0.03 0.02830.17 0.25 0.07 0.07

Kg/m m kg0.99 22.5 22.275

9 8.91

PROPORCION DE MATERIAL 1 baldeEn Campo Para Analisis VOLUMEN m3

unidad cantidad unidad cantidad

bls. 1 m^3 0.0283

baldes 3 m^3 0.0682

baldes 4 m^3 0.0910

baldes 1.5 m^3 0.0341 VOLUMEN TOTAL (m^3) : 0.1875

m3

L56
atc007: ingresar metrado en obra.
J60
atc007: Solo en caso de que se use baldes en obra
Page 11: Costos Unitarios Set
Page 12: Costos Unitarios Set

1 balde0.02274508

Page 13: Costos Unitarios Set

TECHO BAJO ASFALTO

JORNADA LABORAL POR DIA 8 hNUMERO TOTAL DE TECHO 1 Und.

ANALISIS DE COSTOS UNITARIOS

PARTIDA : DEMOLICION DE CARPETA ASFALTICA

RENDIMIENTO : 20

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.04 18.00OPERARIO hh 2 0.80 17.27PEON hh 2 0.80 13.19

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 25.088

PARTIDA : ROTURA Y RETIRO DE TECHO MANUAL E=3"

RENDIMIENTO : 6.1850

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.13 18.00OPERARIO hh 2 2.59 17.27PEON hh 2 2.59 13.19

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 81.125

PARTIDA : ELIMINACION Y REPARACION DE PAVIMENTO DAÑADORENDIMIENTO : 7 Und./DIA

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

M2/DIA

PRECIO UNITARIO S/.

C/IGV

M2/DIA

PRECIO UNITARIO S/.

C/IGV

PRECIO UNITARIO S/.

C/IGV

Page 14: Costos Unitarios Set

CAPATAZ hh 0.1 0.11 18.00OPERARIO hh 2 2.29 17.27PEON hh 2 2.29 13.19MATERIALESCEMENTO PORTLAND TIPO IP (42.5KG.) bls. 0.50 20.000ARENA FINA 0.03 40.700

ARENA GRUESA 0.061 41.300

AGUA 0.012 4.000EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 71.680

Partida UNIDAD PRECIO METRADO PARCIALDEMOLICION DE CARPETA ASFALTICA M2 25.841 2.545 65.756ROTURA Y RETIRO DE TECHO MANUAL E=3" M2 83.559 2.545 212.632ELIMINACION Y REPARACION DE PAVIMENTO Und. 87.666 1.000 87.666TECHO DE BUZON Und. 390.000 1.000 390.000TAPA Y MARCO PARA BUZON Und. 175.000 1.000 175.000TRANSPORTE Y EQUIPO 100.000 1.000 100.000

TOTAL 1031.054

COSTO UNITARIO DIRECTO C/IGV(S/.)

GASTOS GENERALES 10%

UTILIDAD8%

SUBTOTALIMPUESTO GRAL. A LA VENTA 18%

TOTAL(S/.)

m3

m3

m3

Page 15: Costos Unitarios Set

TECHO BAJO ASFALTO

DATOS DEL TECHOD(m) 1.5

Area(m2) 1.76714586764426 2.54469004941ANALISIS DE COSTOS UNITARIOS

DATOS DEL TAPAUNIDAD : D(m) 0.6PRECIO A : 25.841 Area(m2) 1.4804406601634

0.72013.81610.552 45.66418

25.088

0.7530.75

UNIDAD :

PRECIO A : 83.559

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

2.328 bolsas arena fina(m3)44.676 7.00 0.4334.121 0.50 0.03

81.125

2.4342.43 COSTO DE MATERIAL PARA UN TECHO

Volumen del techo de BuzonUNIDAD : Und. Espesor(m) 0.2PRECIO A : 87.666 Volumen(m3) 0.057

COSTO DE UN TECHO DE BUZON

MATERIALES UNIDAD CEMENTO PORTLAND TIPO IP (4 bls.

M2

PRECIOPARCIAL

S/.

SUBTOTALS/.

M2

PRECIOPARCIAL

S/.

SUBTOTALS/.

PRECIOPARCIAL

S/.

SUBTOTALS/.

J32
Catastro Tecnico 010: AQUÍ SOLO COLOCAR LA CANTIDAD DE BOLSAS QUE SE VIO.
K38
Catastro Tecnico 010: ingresar solo este dato
Page 16: Costos Unitarios Set

2.057 ARENA GRUESA

39.474 PIEDRA CHANCADA DE 3/4"

30.149 AGUA71.680 ALAMBRE NEGRO # 16 Kg.

10.000 Kg.1.250 MARCO DE FIERRO FUNDIDO PA Und.

2.537

0.049 DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

13.836 bolsas Arena(m3)2.150 1.00 0.07

2.15 2.50 0.17

Kg/m0.99

PROPORCION DE MATERIAL

En Campo

unidad

1031.054bls.

103.105401284 ARENA GRUESA baldes

82.4843210268baldes

1216.644 AGUA baldes

218.995872326 VOLUMEN TOTAL (m^3) :

1435.640

m3

m3

m3

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(

ACERO CORRUGADO (Ø=1/2")

CEMENTO PORTLAND TIPO I (42.5KG.)

PIEDRA CHANCADA DE 3/4"

Page 17: Costos Unitarios Set

hrs m22 1.767145877 6.185

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

arena gruesa(m3)agua(m3)0.86 0.170.06 0.01

COSTO DE MATERIAL PARA UN TECHO

PRECIO S/. 329.18943 Vol: 0.49COSTO DE UN TECHO DE BUZON

CANTIDAD PRECIO UNIT PRECIO2.50 20 50

P39
atc007: este vol. Debe ser similar a el vol. Del techo.
Q39
atc007: se descuenta el agua debido a que esta solo tiende a reaccionar y contraer el volumen en la mescla.
Page 18: Costos Unitarios Set

0.17 39.15 6.624180.25 54.92 13.730.07 2.95 0.19175

2 4.35 8.722.275 3.14 69.9435

1 180 180

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

Piedra(m3) agua(m3)Bolsa cemento(m3)0.10 0.03 0.02830.25 0.07 0.07

m kg22.5 22.275

PROPORCION DE MATERIAL 1 baldeEn Campo Para Analisis VOLUMEN m3 0.02274508

cantidad unidad cantidad

1 m^3 0.0283

3 m^3 0.0682

4 m^3 0.0910

1.5 m^3 0.0341

VOLUMEN TOTAL (m^3) : 0.1875

L56
atc007: ingresar metrado en obra.
J60
atc007: Solo en caso de que se use baldes en obra
Page 19: Costos Unitarios Set

bajo berma

JORNADA LABORAL POR DIA : 8 hNUMERO TOTAL DE TECHO : 1 Und.

ANALISIS DE COSTOS UNITARIOS

PARTIDA : EXCAVACION MANUAL

RENDIMIENTO : 9 M3/DIA2.79

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.09PEON hh 1 0.89

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00

PARTIDA : ROTURA Y RETIRO DE TECHO MANUAL E=3"

RENDIMIENTO : 6.1850

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.13OPERARIO hh 2 2.59PEON hh 2 2.59

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00

PARTIDA : ELIMINACION Y REPARACION DE PAVIMENTO DAÑADORENDIMIENTO : 7 Und./DIA

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.11OPERARIO hh 2 2.29

M2/DIA

Page 20: Costos Unitarios Set

PEON hh 2 2.29

MATERIALES

CEMENTO PORTLAND TIPO IP (42.5KG.) bls. 0.50

ARENA FINA 0.03

ARENA GRUESA 0.061

AGUA 0.012EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00

Partida UNIDAD PRECIO METRADOEXCAVACION MANUAL M3 13.724 2.7991590543ROTURA Y RETIRO DE TECHO MANUAL E=3" M2 2.545 83.559

ELIMINACION Y REPARACION DE PAVIMENTO DAÑADO Und. 87.666 1.000TECHO DE BUZON Und. 390.000 1.000TAPA Y MARCO PARA BUZON Und. 175.000 1.000TRANSPORTE Y EQUIPO 100.000 1.000

TOTAL

COSTO UNITARIO DIRECTO C/IGV(S/.)

GASTOS GENERALES

UTILIDAD

SUBTOTALIMPUESTO GRAL. A LA VENTA

TOTAL(S/.)TOTAL DE UNIDADES

PRESUPUESTO TOTAL (S/.)

m3

m3

m3

Page 21: Costos Unitarios Set

bajo berma

DATOS DEL TECHOD(m) 1.5

Area(m2) 1.76714586764426ANALISIS DE COSTOS UNITARIOS

DATOS DEL TAPAEXCAVACION MANUAL UNIDAD : M3 D(m) 0.6

7 PRECIO A : 13.724 Area(m2) 1.48044066016342.17

18.00 1.60013.19 11.724

13.324

13.324 0.4000.40

ROTURA Y RETIRO DE TECHO MANUAL E=3" UNIDAD :

PRECIO A : 83.559

18.00 2.32817.27 44.676 DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

13.19 34.121 bolsas81.125 7.00

0.5081.125 2.434

2.43

ELIMINACION Y REPARACION DE PAVIMENTO DAÑADO UNIDAD : Und.PRECIO A : 87.666 Volumen del techo de Buzon

Espesor(m)

Volumen(m3)COSTO DE UN TECHO DE BUZON

18.00 2.057 MATERIALES17.27 39.474 CEMENTO PORTLAND TIPO IP (4

PRECIO UNITARIO S/.

C/IGV

PRECIOPARCIAL

S/.

SUBTOTALS/.

M2

PRECIO UNITARIO S/.

C/IGV

PRECIOPARCIAL

S/.

SUBTOTALS/.

PRECIO UNITARIO S/.

C/IGV

PRECIOPARCIAL

S/.

SUBTOTALS/.

J32
Catastro Tecnico 010: AQUÍ SOLO COLOCAR LA CANTIDAD DE BOLSAS QUE SE VIO.
Page 22: Costos Unitarios Set

13.19 30.149 ARENA GRUESA

71.680 PIEDRA CHANCADA DE 3/4"

20.000 10.000 AGUA

40.700 1.250 ALAMBRE NEGRO # 16

41.300 2.537

4.000 0.049 MARCO DE FIERRO FUNDIDO PA13.836

71.680 2.150 DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

2.15 bolsas1.002.50

PARCIAL38.416

212.632

87.666390.000175.000 PROPORCION DE MATERIAL

100.0001003.714

101.39010% 10.139021913 ARENA GRUESA

8% 8.1112175308119.640 AGUA

18% 21.535282544 VOLUMEN TOTAL (m^3) :141.176

1141.17574112

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(Ø=1/2")

ACERO CORRUGADO (Ø=1/2")

CEMENTO PORTLAND TIPO I (42.5KG.)

PIEDRA CHANCADA DE 3/4"

Page 23: Costos Unitarios Set

hrs m22 1.76714587

2.544690049408 7 6.18501054

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

arena fina(m3)arena gruesa(m3)agua(m3)0.43 0.86 0.170.03 0.06 0.01

0.2

0.057 PRECIO S/. 329.18943 Vol: 0.49COSTO DE UN TECHO DE BUZON

UNIDAD CANTIDAD PRECIO UNIT PRECIObls. 2.50 20 50

K38
Catastro Tecnico 010: ingresar solo este dato
P39
atc007: este vol. Debe ser similar a el vol. Del techo.
Q39
atc007: se descuenta el agua debido a que esta solo tiende a reaccionar y contraer el volumen en la mescla.
Page 24: Costos Unitarios Set

0.17 39.15 6.624180.25 54.92 13.730.07 2.95 0.19175

Kg. 2 4.35 8.7Kg. 22.275 3.14 69.9435

Und. 1 180 180

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

Arena(m3) Piedra(m3) agua(m3)Bolsa cemento(m3)0.07 0.10 0.03 0.02830.17 0.25 0.07 0.07

Kg/m m kg0.99 22.5 22.275

PROPORCION DE MATERIAL 1 baldeEn Campo Para Analisis VOLUMEN m3

unidad cantidad unidad cantidad

bls. 1 m^3 0.0283

baldes 3 m^3 0.0682

baldes 4 m^3 0.0910

baldes 1.5 m^3 0.0341 VOLUMEN TOTAL (m^3) : 0.1875

m3

m3

m3

L56
atc007: ingresar metrado en obra.
J60
atc007: Solo en caso de que se use baldes en obra
Page 25: Costos Unitarios Set
Page 26: Costos Unitarios Set

1 balde0.02274508

Page 27: Costos Unitarios Set

CAMBIO DE TAPA

JORNADA LABORAL POR DIA 8 hNUMERO TOTAL DE TECHO 1 Und.

ANALISIS DE COSTOS UNITARIOS

PARTIDA : RETIRO DE MARCO Y TAPA

RENDIMIENTO : 3 Und/DIA

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.27 18.00OPERARIO hh 2 5.33 17.27PEON hh 2 5.33 13.19

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 167.253

PARTIDA : COLOCACION DE MARCO Y TAPARENDIMIENTO : 4 Und./DIA

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.20 18.00OPERARIO hh 2 4.00 17.27

PRECIO UNITARIO S/.

C/IGV

PRECIO UNITARIO S/.

C/IGV

Page 28: Costos Unitarios Set

PEON hh 2 4.00 13.19MATERIALESCEMENTO PORTLAND TIPO IP (42.5KG.) bls. 0.40 20.000ARENA FINA 0.02 40.700

ARENA GRUESA 0.049 41.300Var. 0.500 26.000

AGUA 0.010 4.000EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 125.440

Partida UNIDAD PRECIO METRADO PARCIALRETIRO DE MARCO Y TAPA Und. 172.271 1.000 172.271COLOCACION DE MARCO Y TAPA Und. 153.272 2.545 390.029TRANSPORTE Y EQUIPO Und. 100.000 1.000 100.000ELIMINACION DE ESCOMBRO Und. 80.000 1.000 80.000

TOTAL 742.300COSTO UNITARIO DIRECTO C/IGV(S/.)

GASTOS GENERALES10%

UTILIDAD 8%

SUBTOTAL

IMPUESTO GRAL. A LA VENTA 18%TOTAL(S/.)

m3

m3

ACERO CORRUGADO GRADO 60(Ø=1/2")

m3

Page 29: Costos Unitarios Set

CAMBIO DE TAPA

DATOS DEL TECHOD(m) 1.5

Area(m2) 1.76714586764426 2.54469004941ANALISIS DE COSTOS UNITARIOS

DATOS DEL TAPAUNIDAD : Und. D(m) 0.6PRECIO S/. : 172.271 Area(m2) 1.4804406601634

4.80092.10770.347

167.253

5.0185.02

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

bolsas arena fina(m3)7.00 0.430.40 0.02

COSTO DE MATERIAL PARA UN TECHOVolumen del techo de Buzon

UNIDAD : Und. Espesor(m) 0.2PRECIO A : 153.272 Volumen(m3) 0.057

COSTO DE UN TECHO DE BUZON

MATERIALES UNIDAD CEMENTO PORTLAND TIPO IP (4 bls.

3.600 ARENA GRUESA

69.080 PIEDRA CHANCADA DE 3/4"

PRECIOPARCIAL

S/.

SUBTOTALS/.

PRECIOPARCIAL

S/.

SUBTOTALS/.

m3

m3

J32
Catastro Tecnico 010: AQUÍ SOLO COLOCAR LA CANTIDAD DE BOLSAS QUE SE VIO.
K38
Catastro Tecnico 010: ingresar solo este dato
Page 30: Costos Unitarios Set

52.760 AGUA125.440 ALAMBRE NEGRO # 16 Kg.

8.000 Kg.1.000 MARCO DE FIERRO FUNDIDO PA Und.

2.03013.000 DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

0.039 bolsas Arena(m3)24.069 1.00 0.07

3.763 2.50 0.173.76

Kg/m0.99

PROPORCION DE MATERIAL

En Campo

unidad

bls.

742.300 ARENA GRUESA baldes

74.2299936478baldes

59.3839949183 AGUA baldes

875.914 VOLUMEN TOTAL (m^3) :

157.6645065081033.578

m3

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(

ACERO CORRUGADO (Ø=1/2")

CEMENTO PORTLAND TIPO I (42.5KG.)

PIEDRA CHANCADA DE 3/4"

Page 31: Costos Unitarios Set

hrs m22 1.767145877 6.185

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

arena gruesa(m3)agua(m3)0.86 0.170.05 0.01

COSTO DE MATERIAL PARA UN TECHO

PRECIO S/. 329.18943 Vol: 0.49COSTO DE UN TECHO DE BUZON

CANTIDAD PRECIO UNIT PRECIO2.50 20 500.17 39.15 6.624180.25 54.92 13.73

P39
atc007: este vol. Debe ser similar a el vol. Del techo.
Q39
atc007: se descuenta el agua debido a que esta solo tiende a reaccionar y contraer el volumen en la mescla.
Page 32: Costos Unitarios Set

0.07 2.95 0.191752 4.35 8.7

22.275 3.14 69.94351 180 180

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

Piedra(m3) agua(m3)Bolsa cemento(m3)0.10 0.03 0.02830.25 0.07 0.07

m kg22.5 22.275

PROPORCION DE MATERIAL 1 baldeEn Campo Para Analisis VOLUMEN m3 0.02274508

cantidad unidad cantidad

1 m^3 0.0283

3 m^3 0.0682

4 m^3 0.0910

1.5 m^3 0.0341

VOLUMEN TOTAL (m^3) : 0.1875

L56
atc007: ingresar metrado en obra.
J60
atc007: Solo en caso de que se use baldes en obra
Page 33: Costos Unitarios Set

CAMBIO DE TAPA Y TECHO

JORNADA LABORAL POR DIA 8 hNUMERO TOTAL DE TECHO 1 Und.

ANALISIS DE COSTOS UNITARIOS

PARTIDA :

RENDIMIENTO : 20

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.04 18.00OPERARIO hh 2 0.80 17.27PEON hh 2 0.80 13.19

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 25.088

PARTIDA : ROTURA Y RETIRO DE TECHO MANUAL E=3"

RENDIMIENTO : 6.1850

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRACAPATAZ hh 0.1 0.13 18.00OPERARIO hh 2 2.59 17.27PEON hh 2 2.59 13.19

EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 81.125

PARTIDA : ELIMINACION Y REPARACION DE PAVIMENTO DAÑADORENDIMIENTO : 6 Und./DIA

DESCRIPCION UNIDAD CUADRILLA CANTIDAD

MANO DE OBRA

M2/DIA

PRECIO UNITARIO S/.

C/IGV

M2/DIA

PRECIO UNITARIO S/.

C/IGV

PRECIO UNITARIO S/.

C/IGV

Page 34: Costos Unitarios Set

CAPATAZ hh 0.1 0.13 18.00OPERARIO hh 2 2.67 17.27PEON hh 2 2.67 13.19MATERIALESCEMENTO PORTLAND TIPO IP (42.5KG.) bls. 0.70 20.000ARENA FINA 0.04 40.700

ARENA GRUESA 0.086 41.300

AGUA 0.017 4.000EQUIPO Y HERRAMIENTASHERRAMIENTAS MANUALES % M.O. 3.00 83.627

Partida UNIDAD PRECIO METRADO PARCIALROTURA Y RETIRO DE TECHO MANUAL E=3" M2 83.559 2.545 212.632ELIMINACION Y REPARACION DE PAVIMENTO Und. 105.505 1.000 105.505TECHO DE BUZON Und. 390.000 1.000 390.000TAPA Y MARCO PARA BUZON Und. 175.000 1.000 175.000TRANSPORTE Y EQUIPO 100.000 1.000 100.000

TOTAL 983.137

COSTO UNITARIO DIRECTO C/IGV(S/.)

GASTOS GENERALES 10%

UTILIDAD8%

SUBTOTALIMPUESTO GRAL. A LA VENTA 18%

TOTAL(S/.)

m3

m3

m3

Page 35: Costos Unitarios Set

CAMBIO DE TAPA Y TECHO

DATOS DEL TECHOD(m) 1.5

Area(m2) 1.76714586764426 2.54469004941ANALISIS DE COSTOS UNITARIOS

DATOS DEL TAPAUNIDAD : D(m) 0.6PRECIO A : 25.841 Area(m2) 1.4804406601634

0.72013.81610.552 45.66418

25.088

0.7530.75

UNIDAD :

PRECIO A : 83.559

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

2.328 bolsas arena fina(m3)44.676 7.00 0.4334.121 0.70 0.04

81.125

2.4342.43 COSTO DE MATERIAL PARA UN TECHO

Volumen del techo de BuzonUNIDAD : Und. Espesor(m) 0.2PRECIO A : 105.505 Volumen(m3) 0.057

COSTO DE UN TECHO DE BUZON

MATERIALES UNIDAD CEMENTO PORTLAND TIPO IP (4 bls.

M2

PRECIOPARCIAL

S/.

SUBTOTALS/.

M2

PRECIOPARCIAL

S/.

SUBTOTALS/.

PRECIOPARCIAL

S/.

SUBTOTALS/.

J32
Catastro Tecnico 010: AQUÍ SOLO COLOCAR LA CANTIDAD DE BOLSAS QUE SE VIO.
K38
Catastro Tecnico 010: ingresar solo este dato
Page 36: Costos Unitarios Set

2.400 ARENA GRUESA

46.053 PIEDRA CHANCADA DE 3/4"

35.173 AGUA83.627 ALAMBRE NEGRO # 16 Kg.

14.000 Kg.1.750 MARCO DE FIERRO FUNDIDO PA Und.

3.552

0.068 DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

19.370 bolsas Arena(m3)2.509 1.00 0.07

2.51 2.50 0.17

Kg/m0.99

645357

1002PROPORCION DE MATERIAL

En Campounidad

983.137bls.

98.3136916567 ARENA GRUESA baldes

78.6509533253baldes

1160.102 AGUA baldes

208.818281079 VOLUMEN TOTAL (m^3) :

1368.920

m3

m3

m3

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(

ACERO CORRUGADO (Ø=1/2")

CEMENTO PORTLAND TIPO I (42.5KG.)

PIEDRA CHANCADA DE 3/4"

Page 37: Costos Unitarios Set

hrs m22 1.767145877 6.185

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

arena gruesa(m3)agua(m3)0.86 0.170.09 0.02

COSTO DE MATERIAL PARA UN TECHO

PRECIO S/. 329.18943 Vol: 0.49COSTO DE UN TECHO DE BUZON

CANTIDAD PRECIO UNIT PRECIO2.50 20 50

P39
atc007: este vol. Debe ser similar a el vol. Del techo.
Q39
atc007: se descuenta el agua debido a que esta solo tiende a reaccionar y contraer el volumen en la mescla.
Page 38: Costos Unitarios Set

0.17 39.15 6.624180.25 54.92 13.730.07 2.95 0.19175

2 4.35 8.722.275 3.14 69.9435

1 180 180

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

Piedra(m3) agua(m3)Bolsa cemento(m3)0.10 0.03 0.02830.25 0.07 0.07

m kg22.5 22.275

PROPORCION DE MATERIAL 1 baldeEn Campo Para Analisis VOLUMEN m3 0.02274508

cantidad unidad cantidad

1 m^3 0.0283

3 m^3 0.0682

4 m^3 0.0910

1.5 m^3 0.0341

VOLUMEN TOTAL (m^3) : 0.1875

L56
atc007: ingresar metrado en obra.
J60
atc007: Solo en caso de que se use baldes en obra
Page 39: Costos Unitarios Set

CAMBIO DE TAPA Y TECHO

JORNADA LABORAL POR DIA 8 hNUMERO TOTAL DE TECHO 1 Und.

Page 40: Costos Unitarios Set

CASO UNIDAD PRECIO PARCIALBAJO PAVIMENTO 2 1031.054 2062.108CAMBIO DE TAPA 2 983.137 1966.274BAJO BERMA 2 1025.645 2051.290

6079.671

COSTO UNITARIO DIRECTO C/IGV(S/.)GASTOS GENERALES 10%

UTILIDAD 8%SUBTOTAL

IMPUESTO GRAL. A LA VENTA 18%TOTAL(S/.)

Page 41: Costos Unitarios Set

CAMBIO DE TAPA Y TECHO

DATOS DEL TECHOD(m) 1.5

Area(m2) 1.76714586764426 2.54469004941

DATOS DEL TAPAD(m) 0.6

Area(m2) 1.4804406601634

0

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

bolsas arena fina(m3)7.00 0.430.70 0.04

COSTO DE MATERIAL PARA UN TECHOVolumen del techo de Buzon

Espesor(m) 0.2Volumen(m3) 0.057

COSTO DE UN TECHO DE BUZONMATERIALES UNIDAD CEMENTO PORTLAND TIPO IP (4 bls.ARENA GRUESA

PIEDRA CHANCADA DE 3/4"

AGUAALAMBRE NEGRO # 16 Kg.

Kg.MARCO DE FIERRO FUNDIDO PA Und.

m3

m3

m3

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60(

J32
Catastro Tecnico 010: AQUÍ SOLO COLOCAR LA CANTIDAD DE BOLSAS QUE SE VIO.
K38
Catastro Tecnico 010: ingresar solo este dato
Page 42: Costos Unitarios Set

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

bolsas Arena(m3)1.00 0.072.50 0.17

Kg/m m0.99 22.5

PROPORCION DE MATERIAL

6079.671 En Campo

10% 607.967 unidad

8% 486.374 bls.

7174.012 ARENA GRUESA baldes

18% 1291.322 baldes

8465.334 AGUA baldes

VOLUMEN TOTAL (m^3) :

ACERO CORRUGADO (Ø=1/2")

CEMENTO PORTLAND TIPO I (42.5KG.)

PIEDRA CHANCADA DE 3/4"

K56
atc007: ingresar metrado en obra.
Page 43: Costos Unitarios Set

hrs m22 1.767145877 6.185

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2

arena gruesa(m3)agua(m3)0.86 0.170.09 0.02

COSTO DE MATERIAL PARA UN TECHO

PRECIO S/. 329.18943 Vol: 0.49COSTO DE UN TECHO DE BUZON

CANTIDAD PRECIO UNIT PRECIO2.50 20 500.17 39.15 6.624180.25 54.92 13.730.07 2.95 0.19175

2 4.35 8.722.275 3.14 69.9435

1 180 180

P39
atc007: este vol. Debe ser similar a el vol. Del techo.
Q39
atc007: se descuenta el agua debido a que esta solo tiende a reaccionar y contraer el volumen en la mescla.
Page 44: Costos Unitarios Set

DOSIFICACION REGLAMENTARIO PARA UNA MESCLA DE 210 Kg/cm2 PARA COSTO DEL TECHO

Piedra(m3) agua(m3)Bolsa cemento(m3)0.10 0.03 0.02830.25 0.07 0.07

kg22.275

PROPORCION DE MATERIAL 1 baldePara Analisis VOLUMEN m3 0.02274508

cantidad unidad cantidad

1 m^3 0.0283

3 m^3 0.06824 m^3 0.0910

1.5 m^3 0.0341

VOLUMEN TOTAL (m^3) : 0.1875

I60
atc007: Solo en caso de que se use baldes en obra