43
Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category PM Internal activity Stock material External service / material Surcharge 01/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I01 Repair- Immediately /Standstill EP1_100/01/03 /2014/4520007 0 RINSE TANK TEMP. NOT COMING UP. 221.65 $ 107.70 $ 5.92 $ 01/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I01 Repair- Immediately /Standstill EP1_100/01/09 /2014/4521601 8 BROKE SWITCH ON WASHER CONVEYER. (PUMP) 0.01 $ 44.20 $ 2.43 $ 01/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I01 Repair- Immediately /Standstill EP1_100/01/21 /2014/4524807 6 BASKET #14 IS BENT AND CATCHES. 66.56 $ 01/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I01 Repair- Immediately /Standstill EP1_100/01/22 /2014/4525326 3 tip cylinder not retracted 0.15 $ 01/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I11 Maintenance / Inspection EP1_100/12/23 /2013/4518866 0 VS1 Assy Mech / Washer 42.54 $ 27.45 $ 1.51 $ 01/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I11 Maintenance / Inspection EP1_100/12/23 /2013/4518866 1 VS1 Assy Elec / Washer 0.01 $ 02/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I01 Repair- Immediately /Standstill EP1_100/02/15 /2014/4532151 2 WASHER MOTOR FAULT 206.91 $ 02/2014 EP1_100/12 058980 VS1 Assy / JenFab Washer EP1_100/I01 Repair- Immediately /Standstill EP1_100/02/16 /2014/4532261 6 NEEDS JOGGED BACK 151.73 $

Upload: others

Post on 20-Jul-2020

23 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

01/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/03

/2014/4520007

0

RINSE TANK

TEMP. NOT

COMING UP.

221.65 $ 107.70 $ 5.92 $

01/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/09

/2014/4521601

8

BROKE SWITCH

ON WASHER

CONVEYER.

(PUMP)

0.01 $ 44.20 $ 2.43 $

01/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/21

/2014/4524807

6

BASKET #14 IS

BENT AND

CATCHES.

66.56 $

01/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/22

/2014/4525326

3

tip cylinder not

retracted0.15 $

01/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/12/23

/2013/4518866

0

VS1 Assy Mech /

Washer42.54 $ 27.45 $ 1.51 $

01/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/12/23

/2013/4518866

1

VS1 Assy Elec /

Washer0.01 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/15

/2014/4532151

2

WASHER

MOTOR FAULT206.91 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/16

/2014/4532261

6

NEEDS

JOGGED BACK151.73 $

Page 2: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/17

/2014/4532280

1

RACK BENT IN

WASHER #21146.47 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/20

/2014/4533721

8

TIP CYCLINDER

WILL NOT

RETRACTED

26.42 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/28

/2014/4536135

0

SWITCH CAME

OFF/ bent

baskets

322.61 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/09

/2014/4530118

7

CHAIN NOT IN

POSITION

CARRIERS

CAUGHT

14.95 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/09

/2014/4530183

9

PIPES ARE

CLOGGED168.45 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/26

/2014/4535261

6

Tip cylinder

leaking74.21 $ 111.47 $ 6.13 $

02/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/01/27

/2014/4526422

5

VS1 Assy Elec /

Washer38.66 $

03/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/28

/2014/4536135

0

SWITCH CAME

OFF/ bent

baskets

0.01 $

Page 3: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

03/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/24

/2014/4534508

0

VS1 Assy Mech /

Washer164.84 $

03/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/24

/2014/4534508

1

VS1 Assy Elec /

Washer0.08 $

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/08

/2014/4546995

7

PART STOP

NOT

RELEASING

ABOUT EVERY

156.72 $

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/12

/2014/4548249

4

VALUE QUIT

WORKING61.35 $

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/13

/2014/4548300

5

PRE STOP ON

WASHER196.35 $

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/21

/2014/4550211

3

PART STOP

WON'T

RELEASE

PARTS.

46.56 $

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/22

/2014/4550478

4

WASHER

NEEDS LOOK

AT

69.77 $

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/14

/2014/4548315

0

Order for output

card.513.02 $ 367.20 $ 20.20 $

Page 4: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

04/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/03/24

/2014/4542515

0

VS1 Assy Elec /

Washer33.52 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/21

/2014/4550211

3

PART STOP

WON'T

RELEASE

PARTS.

622.52 $ 34.24 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/06

/2014/4553964

6

PARTS STOP

NOT

DROPPING

EVERY CYCLE.

113.99 $ 329.70 $ 18.13 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/20

/2014/4557928

3

WILL NOT

START UP88.59 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/20

/2014/4558021

1

flow switch not

working1.02 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/23

/2014/4559013

4

PART WILL NOT

GO ALL THE

WAY IN #16

0.51 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/25

/2014/4559255

3

rinse tank not

filling175.29 $

Page 5: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/14

/2014/4548315

0

Order for output

card.137.34 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/21

/2014/4558246

6

CARRIER 15-25

SHUTTING

WASHER

DOWN

111.29 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/28

/2014/4560242

1

PART STUCK IN

BASKET.84.66 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/04/21

/2014/4550099

9

VS1 Assy Mech /

Washer244.60 $ 29.56 $ 1.63 $

05/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/04/21

/2014/4550100

0

VS1 Assy Elec /

Washer6.12 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/03

/2014/4562042

2

WILL NOT RUN 1.79 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/16

/2014/4565384

9

air leak 0.08 $ 9.37 $ 0.52 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/23

/2014/4567127

8

BENT BASKET 139.49 $

Page 6: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/23

/2014/4566996

7

BASKETS

DROPPING

PUMPS.

107.72 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/23

/2014/4567007

4

CONVEYOR

WON'T JOG

BACK INTO

POSITION.

6.02 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/24

/2014/4567362

9

BASKET #16

DROPPING

PUMPS,

CAUSING

36.06 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/26

/2014/4567950

2

bent baskets #15 61.71 $

06/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/05/26

/2014/4559465

7

VS1 Assy Elec /

Washer9.69 $

07/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/09

/2014/4571698

0

WASHER

KEEPS

STOPPING ON

BACKET #25.

87.57 $

07/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/17

/2014/4574114

5

baskets bent.

dropping parts28.46 $

Page 7: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

07/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/29

/2014/4577329

8

BASKET #13 IS

BENT,

STOPPING THE

0.03 $

07/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/31

/2014/4578188

1

BASKET 25

NEEDS

LOOKED AT

33.56 $

07/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/06/23

/2014/4566871

4

VS1 Assy Mech /

Washer130.20 $

07/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/06/23

/2014/4566871

5

VS1 Assy Elec /

Washer48.09 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/14

/2014/4582069

6

WASHER

NEEDS

JOGGED BACK

74.36 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/19

/2014/4583053

9

TIP CYLINDER

IN WASHER

NOT

RETRACTED

0.15 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/19

/2014/4583068

4

WASHER

NEEDS

JOGGED BACK

16.32 $

Page 8: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/19

/2014/4583302

1

WILL NOT

START UP

BENT BASKET

31.52 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/21

/2014/4583903

0

BASKET #18 IS

BENT.#4 GETS

STUCK

76.86 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/22

/2014/4584184

2

#4,16,18

BASKETS ARE

BENT

220.83 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/25

/2014/4584949

9

TIP CYCLINDER

NOT

RETRACTED

109.65 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/27

/2014/4585594

7

TIP CYCLINDER

NOT

RETRACTED

47.69 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/28

/2014/4585779

9

TIP CYLINDER

NOT

RETRACTED

FAULT.

100.83 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/19

/2014/4583247

2

CHAIN CAME

OFF214.41 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/19

/2014/4583322

9

couple baskets

need checked151.52 $

Page 9: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/21

/2014/4583816

6

WASHER

JAMMING UP.42.25 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/22

/2014/4584025

0

WASHER

FAULTING,

BASKET

ISSUES.

152.15 $

08/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/07/28

/2014/4576850

1

VS1 Assy Elec /

Washer1.17 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/02

/2014/4587226

5

BASKETS OUT

OF

ALIGNMENT.

306.90 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/03

/2014/4587607

6

TIP CYLINDER

FAULT.146.53 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/03

/2014/4587702

1

TIP CYCLINDER

NOT

RETRACTEING

29.33 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/14

/2014/4590646

4

TIP CYLINDER

NOT

RETRACTED

27.91 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/28

/2014/4594700

9

TIP CYLINDER

WON'T

RETRACT

3.06 $

Page 10: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/02

/2014/4587402

1

baskets 25 bent,

parts falling out71.81 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/14

/2014/4590598

0

2 PUMPS

PINNED BY A

CARRIER

158.76 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/25

/2014/4594068

5

TIP CYLINDER

NOT

RETRACTED

0.01 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/08/25

/2014/4584686

5

VS1 Assy Mech /

Washer26.45 $

09/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/08/25

/2014/4584686

6

VS1 Assy Elec /

Washer302.02 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/02

/2014/4595930

8

TIP CYLINDER

NOT

RETRACTING

FAULT.

345.27 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/08

/2014/4597488

2

TIP CYLINDER

FAULT.0.15 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/14

/2014/4599375

9

WASHER

CYCLING BUT

NOT

RELEASING

PARTS

14.64 $ 257.26 $ 14.15 $

Page 11: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/16

/2014/4600084

6

CHAIN NEEDS

JOGGED BACK113.37 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/17

/2014/4600429

0

BASKET BENT

#748.09 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/24

/2014/4602404

4

BASKETS #9 &

#10 NOT

LOADING

PPROPERLY

35.45 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/27

/2014/4603353

4

DRY NOT

WORKING589.27 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/27

/2014/4603439

5

FLOATS NEED

LOOK AT0.01 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/30

/2014/4604479

8

tip cylinder not

retracted0.01 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/02

/2014/4587402

1

baskets 25 bent,

parts falling out3,750.00 $ 206.25 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/01

/2014/4595674

3

LOTS OF OIL

AND DEBRIS

COMING OUT

93.48 $

Page 12: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/06

/2014/4596941

2

FILTERS IN

WASHER NEED

CHANGED.

77.63 $ 40.44 $ 2.22 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/08

/2014/4597597

5

PART STOP ON

THE PUMP

SIDE KEEPS

42.59 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/14

/2014/4599399

7

Rotate Side door

at load sta126.54 $ 25.23 $ 1.39 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/23

/2014/4602159

9

BASKETS #8 &

#10 DROPPING

AND MIS-

67.32 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/28

/2014/4603576

0

BASKET #25

DROPPING

PARTS AND

0.10 $

10/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/09/22

/2014/4592786

8

VS1 Assy Elec /

Washer0.01 $

11/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/17

/2014/4609225

5

WASHER

WON'T COME

ON.

28.20 $

11/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/30

/2014/4612862

7

EXTRA PUMP IS

GETTING

THROUGH

FAULTING

88.64 $

Page 13: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

11/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/10/27

/2014/4603109

7

VS1 Assy Mech /

Washer41.72 $

11/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/10/27

/2014/4603109

8

VS1 Assy Elec /

Washer0.01 $

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/17

/2014/4609225

5

WASHER

WON'T COME

ON.

1,230.68 $ 67.69 $

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/12/03

/2014/4614072

9

WILL NOT FILL 212.97 $ 977.14 $ 53.74 $

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/12/06

/2014/4614907

8

CARRIER BENT

IN WASHER96.31 $

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/12/06

/2014/4614917

4

WASHER

NEEDS

JOGGED BACK

47.84 $

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/12/02

/2014/4613500

8

WASHER

DOUBLE

LOADING.

129.45 $

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/12/15

/2014/4617328

2

BENT BASKET

PREVENTING

PUMP FROM

107.00 $ 550.15 $ 30.26 $

Page 14: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

12/2014EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/11/24

/2014/4611102

1

VS1 Assy Lead /

Washer13,950.00 $ 767.25 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/06

/2015/4620880

6

baskets bent

badly. will not run69.36 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/10

/2015/4622110

3

CARRIER IS

BENT34.32 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/10

/2015/4622127

4

CARRIERS

JAMMED IN

ROLLERS

0.87 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/17

/2015/4624192

4

part hold/release

prongs not going

up

0.01 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/18

/2015/4624355

8

PUMP JAMMED

IN WASHER

BASKET

10.10 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/20

/2015/4625209

2

PARTS

FALLING OUT

OF THE BACK

61.00 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/25

/2015/4626530

3

1 BASKET

KEEPS

DROPPING THE

PUMP IT'S

68.09 $

Page 15: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/30

/2015/4628418

4

WASHER

DOUBLE

LOADING

PARTS.

51.36 $ 94.64 $ 5.21 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/11/11

/2014/4607834

2

tow motor hit

washer. door

dented in

15,000.00 $ 825.00 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/12/02

/2014/4613500

8

WASHER

DOUBLE

LOADING.

745.00 $ 40.98 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/05

/2015/4620434

6

WASHER

LEAKING

SOMEWHERE

ON THE

15.76 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/07

/2015/4621027

9

BASKETS #4 &

#21 FAULTING

OUT AT

253.42 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/08

/2015/4621339

2

wash pump leak 67.73 $ 423.54 $ 23.29 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/09

/2015/4621779

9

BASKETS

FAULTING OUT

WASHER.

0.02 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/16

/2015/4623872

8

PARTS NOT

GOING INTO

ONE OF THE

BASKETS,

55.95 $

Page 16: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/20

/2015/4624951

3

cover jammed in

back of washer111.44 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/20

/2015/4625005

8

BASKETS #7 &

#18 HANGING

UP.

88.13 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/24

/2015/4626444

7

replace all chain

and baskets1,030.59 $ 11.58 $ 0.64 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/26

/2015/4626991

5

PART JAMMED

IN WASHER

BASKET.

186.92 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/26

/2015/4627184

4

GAGES NEED

REPLACED ON

WASH&RINSE

124.34 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/28

/2015/4627913

9

BASKET #1 IS

BENT72.72 $ 252.78 $ 13.90 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/12/22

/2014/4618896

3

VS1 Assy Mech /

Washer100.11 $

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/12/22

/2014/4618896

4

VS1 Assy Elec /

Washer34.07 $

Page 17: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

01/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I22Modification /

Change

EP1_100/01/30

/2015/4628523

7

Add cleanout

cycle for washer172.48 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/04

/2015/4629812

3

TIP CYLINDER

NOT

RETRACTED

FAULT.

8.93 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/11

/2015/4632083

7

TIP CYCLINDER

LEAKING AIR48.09 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/22

/2015/4634997

2

CARRIERS

WILL NOT

MOVE

20.76 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/24

/2015/4635907

4

PROX SWITCH

NEEDS

REPLACED (TIP

CYLINDER

0.03 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/26

/2015/4636332

9

TIP CYLINDER

FAULT.0.66 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/08

/2015/4621339

2

wash pump leak 2,547.68 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/26

/2015/4627184

4

GAGES NEED

REPLACED ON

WASH&RINSE

54.83 $ 151.38 $ 8.33 $

Page 18: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/15

/2015/4633036

2

SOMETHING

FELL INTO THE

PUMP DURING

PM

104.04 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/16

/2015/4633318

2

PIPE

CONNECTED

TO WASHER

PUMP

412.94 $ 218.60 $ 12.02 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/21

/2015/4634836

0

HOSE TO

EMPTY

WASHER

STARTED

SPRAYING

172.64 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/23

/2015/4635467

4

OIL GETTING

ON PARTS61.20 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/23

/2015/4635581

2

clean out washer 66.92 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/24

/2015/4635651

3

PIPE LEAKING

ON WASH SIDE

OF WASHER.

88.53 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/24

/2015/4635859

8

get oil skimmer

working properly29.73 $ 548.99 $ 30.19 $

Page 19: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/25

/2015/4636138

8

BENT CARRIER

DROPPING

PARTS #14

39.68 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/28

/2015/4637002

2

MAKE-UP

SOLENOID

FAULTS

18.77 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/01/26

/2015/4626796

8

VS1 Assy Elec /

Washer2.45 $

02/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I22Modification /

Change

EP1_100/01/30

/2015/4628523

7

Add cleanout

cycle for washer132.35 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/27

/2015/4645256

4

TIP CYLINDER

RETRACT

FAULT.

185.13 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/29

/2015/4645643

3

CARRIERS ARE

DROPPING

PUMPS

72.42 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/02

/2015/4637704

2

oil skimmer 73.08 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/10

/2015/4640049

5

GETTING OIL

ON PARTS27.03 $

Page 20: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/13

/2015/4641202

3

air leak 150.20 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/23

/2015/4635198

9

VS1 Assy Mech /

Washer48.71 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/23

/2015/4635199

0

VS1 Assy Elec /

Washer0.01 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I12 Operation

EP1_100/03/20

/2015/4643197

7

Install larger

regulator0.02 $ 19.56 $ 1.08 $

03/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I22Modification /

Change

EP1_100/01/30

/2015/4628523

7

Add cleanout

cycle for washer143.16 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/12

/2015/4649417

7

PUMPS WONT

RELEASE32.65 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/13

/2015/4649927

4

LETTING 2

PARTS IN AT A

TIME

303.71 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/18

/2015/4651553

7

PUMP JAMMED

UNDER

BASKET

34.18 $

Page 21: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/11

/2015/4649323

3

BASKET 10

BENT NOT

LOADING

COVERS

15.40 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/15

/2015/4650442

8

WASHER

KEEPS DOUBLE

LOADING.

369.30 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/17

/2015/4651147

1

BASKET 20

DROPPING

PUMPS

197.73 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/20

/2015/4651909

4

PARTS DOUBLE

LOADING.106.13 $

04/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/23

/2015/4653153

6

BENT CARRIER

#18214.76 $

05/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/07

/2015/4657281

2

WASHER LETS

2 COVERS GO

BY EVERYTIME

52.17 $

05/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/18

/2015/4660253

5

WILL NOT FLIP

BASKET119.85 $

05/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/22

/2015/4661529

3

WASHER

FAULTING BUT

SHOWING NO

120.87 $

Page 22: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

05/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/31

/2015/4663989

5

PART PRESENT

SWITCH NOT

WORKING

69.62 $

05/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/04/27

/2015/4653967

0

VS1 Assy Mech /

Washer74.87 $

05/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/04/27

/2015/4653967

1

VS1 Assy Elec /

Washer15.96 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/05

/2015/4665830

0

chain conveyor

needs

reversed.part

stuck

7.32 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/07

/2015/4666055

3

PARTS

JAMMED4.59 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/10

/2015/4667236

0

BENT

CARRIERS42.20 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/18

/2015/4669831

3

ULTRSONIC

HAS A HIGHT

TEMP FAULT

144.43 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/06

/2015/4665931

2

BASKET 19 IS

BENT87.11 $

Page 23: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/08

/2015/4666327

1

PARTS

GETTING

CAUGHT IN

BASKET #20.

42.43 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/11

/2015/4667466

3

BASKET #19

NOT LETTING

PARTS IN ALL

30.45 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/12

/2015/4667775

7

air leak in the

back of the

washer

53.81 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/12

/2015/4667997

4

BASKET #30

NEEDS FIXED75.99 $ 250.47 $ 13.78 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/17

/2015/4669401

3

PARTS NOT

MAKING IT

INTO BASKETS

4-7

28.31 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/21

/2015/4670398

7

BASKET #30 IS

BENT130.72 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/22

/2015/4670749

5

TWO ROLLERS

FELL OFF

CONVEYOR.

14.28 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/26

/2015/4672213

1

WASHER

CHAIN NEED

JOGGED BACK

5.00 $

Page 24: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/30

/2015/4673315

8

PLATE ON

BACK OF PUMP

SIDE OF

0.01 $

06/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/05/25

/2015/4662152

4

VS1 Assy Elec /

Washer25.76 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/18

/2015/4669831

3

ULTRSONIC

HAS A HIGHT

TEMP FAULT

11,475.75 $ 631.17 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/03

/2015/4674680

2

SONICS KEEP

SHUTTING

OFF?

276.32 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/16

/2015/4678526

2

CYLINDER

RETRACTION

FAULT.

5.76 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/18

/2015/4679122

6

2 rows of

baskets hooked

onto eachother

138.99 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/18

/2015/4679228

9

BENT

CARRIERS96.80 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/28

/2015/4682219

2

TIP CYLINDER

WON'T

RETRACT

201.55 $

Page 25: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/17

/2015/4669401

3

PARTS NOT

MAKING IT

INTO BASKETS

4-7

535.90 $ 29.47 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/18

/2015/4679158

5

tip cylinder came

apart.2.96 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/18

/2015/4679167

2

tip cylinder

leaking air22.59 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/29

/2015/4682590

9

BASKET #12

FAULTS AT

UNLOAD

POINT.

132.25 $

07/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/06/22

/2015/4670629

3

VS1 Assy Mech /

Washer65.81 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/08/18

/2015/4688746

4

TAKE COVERS

OFF OF WASH

AND RINSE

2.55 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/18

/2015/4679167

2

tip cylinder

leaking air518.44 $ 28.51 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/03

/2015/4683960

5

PARTS IN

BASKETS #7

ON PUMP SIDE

AND

59.06 $

Page 26: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/07

/2015/4685264

7

pumps not going

down exit rollers22.03 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/07

/2015/4685560

2

PARTS

GETTING

STUCK IN THE

BACK #7,21,22

83.39 $ 33.96 $ 1.87 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/10

/2015/4685974

5

BASKET #12

KEEPS

HANGING UP

AT

58.04 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/17

/2015/4688214

9

PUMPS

HANGING UP

ON BASKET #7

ON THE

65.64 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/08/24

/2015/4690316

7

PARTS NOT

WANTING TO

GO INTO

BASKETS.

27.64 $

08/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/07/27

/2015/4681787

5

VS1 Assy Elec /

Washer9.44 $

09/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/08

/2015/4694851

6

DRYER TEMP

WON'T COME

UP ON

0.66 $

Page 27: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

09/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/24

/2015/4699906

0

dryer temp below

set point79.00 $

09/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/18

/2015/4698059

4

BASKETS

HANGING UP

AT UNLOAD

248.77 $

09/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/25

/2015/4700337

7

PART STUCK IN

PUMP SIDE,

ALSO

206.96 $

09/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/28

/2015/4701103

0

BLOWER NOT

RUNNING

RIGHT

63.85 $ 782.61 $ 43.04 $

09/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/08/24

/2015/4690207

7

VS1 Assy Mech /

Washer59.26 $

10/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/09

/2015/4695266

0

AIR LEAK ON

WASHER.570.97 $ 31.40 $

10/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/28

/2015/4701103

0

BLOWER NOT

RUNNING

RIGHT

233.99 $ 107.62 $ 5.92 $

10/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/09/21

/2015/4698720

5

VS1 Assy Elec /

Washer0.41 $

11/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/16

/2015/4715996

2

AUTO TEMP

FAULT.70.64 $

Page 28: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

11/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/16

/2015/4716005

9

WASHER WONT

RUN CAUSED

BY THE SET

POINT

109.55 $

11/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/28

/2015/4701103

0

BLOWER NOT

RUNNING

RIGHT

35.70 $ 1.96 $

11/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/11/02

/2015/4711909

2

WATER

TEMPERATURE

FAILURE

462.05 $

11/2015EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/08/24

/2015/4690207

8

VS1 Assy Elec /

Washer9.95 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/05

/2016/4729936

4

WASHER

KEEPS

FAULTING OUT,

SHOWS NO

109.40 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/10

/2016/4731393

0

PROFILE

GAUGE BROKE

OFF, NEEDS

WELDED

212.93 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/16

/2016/4733836

6

PHOTO EYES

NEED HOOK

BACK UP

124.08 $

Page 29: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/18

/2016/4734564

3

SWITCH NEEDS

HOOKED UP

SO IT WONT

CRASH

135.51 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/25

/2016/4737296

3

TALLER PUMP

STOP0.05 $ 16.45 $ 0.90 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/27

/2016/4737754

9

CYCLE STOP

PUSHED112.30 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/29

/2016/4738647

5

WASHER

START PUSH

BUTTON GOT

HIT BY A

65.64 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/27

/2016/4738017

5

WASHER

KEEPS

STOPPING,

NOT SURE IF IT

IS

0.03 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/01/27

/2016/4738041

4

WATER FLOW

SWITCHS NOT

WORKING

46.41 $

01/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/12/28

/2015/4728469

0

VS1 Assy Mech /

Washer156.72 $ 146.83 $ 8.08 $

Page 30: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/09

/2016/4742203

9

SOLENOID

FAULTS.170.34 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/15

/2016/4744238

7

BASKETS ON

PUMP SIDE

BENT, NOT

80.94 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/19

/2016/4745712

9

BASKET NEEDS

STRAIGHTENE

D

0.01 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/05

/2016/4741342

1

BASKET #1

NEEDS FIXED0.01 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/12

/2016/4743417

9

WATER LEVEL

DROPPING

AND AUTO FILL

NOT

66.81 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/01/25

/2016/4736822

6

VS1 Assy Elec /

Washer0.01 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/22

/2016/4746498

2

VS1 Assy Mech /

Washer38.35 $

02/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/22

/2016/4746498

3

VS1 Assy Elec /

Washer0.41 $

Page 31: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

03/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/02

/2016/4749977

1

AUTOMATIC

FILL ON

WASHER NOT

WORKING.

353.59 $

03/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/03

/2016/4750588

3

BASKETS NEED

FIXED.31,32,33,

34,35

233.43 $

03/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/04

/2016/4750985

8

BASKET #6

NEEDS FIXED87.21 $

03/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/23

/2016/4757407

7

BASKET EMPTY

FAULT, WON'T

LOAD PARTS.

65.13 $ 45.90 $ 2.52 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/05

/2016/4761496

6

PUMP STUCK

UNDER

BASKET.

79.48 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/05

/2016/4761679

3

BENT BASKETS

#12,13 14 1599.06 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/06

/2016/4761809

3

PUMPS

GETTING

JAMMED

UNDER

207.46 $

Page 32: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/21

/2016/4767237

6

DRYER TEMP

FELL AND

WASHER

FAULTED.

94.25 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/22

/2016/4767452

9

SOLENOID

FAULT,

WASHER NOT

AUTO FILLING

33.96 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/24

/2016/4767910

7

DRYER WILL

NOT COME UP

TO TEMP

96.39 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/24

/2016/4767959

8

DRYER NOT

COMING UP TO

TEMP

142.04 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/25

/2016/4768680

2

LEAKING 0.26 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/04/29

/2016/4770021

5

PART STOP ON

COVER SIDE

DOESN'T

270.86 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/06

/2016/4762030

1

bent baskets 57.78 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/07

/2016/4762386

9

PARTS WILL

NOT GO IN

LOAD BASKET

91.80 $

Page 33: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/10

/2016/4763101

3

CARRIER #5

BENT66.96 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/11

/2016/4763393

8

FAULTING FOR

MAKE UP

SWITCH

32.90 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/04/11

/2016/4763743

6

dig parts out of

tank4.34 $

04/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/03/28

/2016/4758625

1

VS1 Assy Elec /

Washer0.03 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/02

/2016/4770786

3

DRYER TEMP

IS -132 AND

WON'T COME

BACK

2.14 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/04

/2016/4771431

5

AUTO FILL

STUCK ON

(RINSE)

12.11 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/18

/2016/4775965

9

DRYER TEMP

FAULT, WON'T

READ RIGHT.

7.91 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/05/20

/2016/4776819

8

WASHER

NEEDS

JOGGED BACK

INTO

0.15 $

Page 34: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/02

/2016/4770391

0

WASHER

LEAKING OIL0.01 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/09

/2016/4772955

4

WASHER

KEEPS

FAULTING IN

MID CYCLE,

148.00 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/17

/2016/4775823

8

Refill system

problem718.23 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/19

/2016/4776668

8

PART PRESENT

PROX NOT

READING

0.03 $ 368.50 $ 20.27 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/20

/2016/4776871

1

BASKETS #2, 23

& 38 NEED

ADJUSTED/BEN

T

0.07 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/27

/2016/4779162

4

WASHER

NEEDS TO BE

JOGGED INTO

POSITION

113.17 $

05/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/04/25

/2016/4768212

1

VS1 Assy Mech /

Washer0.01 $

Page 35: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/01

/2016/4781088

5

WILL NOT STAY

RUNNING13.52 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/03

/2016/4781749

4

WASHER

STOPS, BUT

SHOWN NO

FAULT.

171.77 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/07

/2016/4782915

0

DRYER TEMP

KEEPS

FALLING

BELOW SET

245.67 $ 847.87 $ 46.63 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/07

/2016/4783243

6

JOG

CONVEYOR

FORWARD

4.85 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/09

/2016/4783784

6

ONE OF THE

BARS ON THE

WASHER IS

BENT.

57.02 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/13

/2016/4784747

5

BENT BASKET 140.61 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/14

/2016/4785616

5

WILL NOT GET

UP TO TEMP

TO START

254.90 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/20

/2016/4787764

8

BASKET #27

NEEDS FIXD39.68 $

Page 36: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/24

/2016/4789311

0

EMPTY BASKET

FAULT.2.81 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/28

/2016/4790837

5

BASKET 24

BENT, NEEDS

ADJUSTED.

209.50 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/29

/2016/4791379

9

WILL NOT STAY

RUNNING128.62 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/05/17

/2016/4775823

8

Refill system

problem149.94 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/01

/2016/4780834

3

PART STOP ON

PUMP SIDE

COMES UP

61.05 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/03

/2016/4781814

0

#5,#33,#35

BASKETS NEED

FIXED

0.01 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/05

/2016/4782143

9

CARRIER #5

BENT45.65 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/11

/2016/4784484

6

chain conveyor

out of position.30.35 $

Page 37: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/06/27

/2016/4790561

4

WILL NOT

START UP109.91 $

06/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/05/23

/2016/4777536

3

VS1 Assy Elec /

Washer295.19 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/07

/2016/4782915

0

DRYER TEMP

KEEPS

FALLING

BELOW SET

944.40 $ 51.94 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/12

/2016/4795842

8

CHAIN

CONVEYOR

NEEDS

JOGGED

0.87 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/13

/2016/4796222

8

WILL NOT STAY

RUNNING105.01 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/07/31

/2016/4802442

8

LINE 6 WASHER

JAMMED62.26 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/16

/2016/4797204

5

JOGGED BACK

AND

POSSIABLE

BENT CARRIER

12.34 $

Page 38: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/19

/2016/4798154

4

remove exit

conveyor74.76 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/07/26

/2016/4800882

9

washer

conveyors0.11 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/06/27

/2016/4790164

7

VS1 Assy Mech /

Washer22.95 $

07/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/06/27

/2016/4790164

8

VS1 Assy Elec /

Washer6.22 $

08/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/07/25

/2016/4800084

3

VS1 Assy Elec /

Washer0.04 $

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/14

/2016/4785616

5

WILL NOT GET

UP TO TEMP

TO START

395.00 $

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/06

/2016/4814959

7

COVERS

GETTING

STUCK IN THE

BACK

26.17 $

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/09/28

/2016/4822624

7

SONICS UNIT

WILL NOT STAY

ON

87.47 $

Page 39: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/09

/2016/4816066

8

BLOWERS NOT

WORKING

RIGHT

76.35 $

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/09/28

/2016/4822623

2

PUMPS&COVE

RS GETTING

STUCK IN THE

BACK

228.07 $

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/08/22

/2016/4809322

1

VS1 Assy Mech /

Washer43.20 $

09/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/08/22

/2016/4809322

2

VS1 Assy Elec /

Washer76.09 $

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/02

/2016/4823705

3

WILL NOT

MOVE50.34 $

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/10

/2016/4826188

6

PUMP/COVER

CONVEY

FAULTED.

1.03 $

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/24

/2016/4831298

4

EXTERNAL

BACK UP

FAULT ON

WASHER.

6.89 $

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/10/25

/2016/4831870

8

CHAIN NEEDS

JOGGED.0.02 $

Page 40: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/01

/2016/4834130

6

FLOAT NEEDS

PUT BACK ON

IN OVER FLOW

0.01 $

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/25

/2016/4832006

1

BENT

CARREIRS114.09 $

10/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/10/26

/2016/4832240

6

SEVERAL

BASKETS BENT

NOT ALLOWING

36.36 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/06/07

/2016/4782915

0

DRYER TEMP

KEEPS

FALLING

BELOW SET

944.40 $ 51.94 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/07

/2016/4835938

5

CONVEYOR

BACK UP

FAULT.

WASHER

WON'T

212.57 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/08

/2016/4836694

3

SUMP PUMP

SWITCHES NOT

MAKING

11.32 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/14

/2016/4838449

7

EXTERNAL

CONVEYOR

FAULT ON

WASHER.

357.51 $

Page 41: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/11/21

/2016/4841310

1

CHECK

BLOWER TO

SEE IF ITS ON

27.44 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/11/15

/2016/4839138

4

COVER NEEDS

PUT BACK ON58.81 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/11/19

/2016/4840490

5

AIR LEAK 0.01 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/11/21

/2016/4841406

1

WASHERNEED

S JOGGED

BACK

3.67 $

11/2016EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/10/24

/2016/4831144

4

VS1 Assy Mech /

Washer31.77 $

01/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/01/20

/2017/4860327

0

JHIGH SUMP

PUMP LEVEL

FAULT.

22.34 $

01/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I04

Caused By

Prevent.

Maintenance

EP1_100/10/10

/2016/4826516

8

Deferred PM

48093222104.96 $

01/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/12/26

/2016/4852376

2

VS1 Assy Mech /

Washer0.01 $

Page 42: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

02/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/02/10

/2017/4868065

6

WASHER

NEEDS

JOGGED BACK

INTO PLACE.

64.37 $

02/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/13

/2017/4869153

2

TANK NOT

FILLING

WASHER

WAITING ON

WATER

73.71 $ 16.09 $ 0.88 $

02/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/20

/2017/4871730

3

pump is leaking,

needs changed108.23 $

02/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/02/24

/2017/4873309

1

COULD YOU

TAKE A LOOK

AT THE AUTO

FILL

0.08 $ 0.00

02/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/01/23

/2017/4861074

9

VS1 Assy Elec /

Washer13.16 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/08

/2017/4877898

0

CHAIN JUMPED

POSITION70.02 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/08

/2017/4878003

8

CHAIN

CONVEYOR

OPENING TOP

RINCE LID

114.34 $

Page 43: costs Support... · Total actual costs Total actual costs Total actual costs Total actual costs Cal. year / month Equipment MaintActivityT ype Maintenance order Value Category

Total actual

costs

Total actual

costs

Total actual

costs

Total actual

costs

Cal. year

/ monthEquipment

MaintActivityT

ype

Maintenance

order

Value Category

PM

Internal

activity

Stock

material

External

service /

material

Surcharge

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/10

/2017/4878480

1

BASKETS

TANGLED

(JAMMED)

124.19 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I01

Repair-

Immediately

/Standstill

EP1_100/03/11

/2017/4878968

3

LASER

SENSOR ON

WASHER NOT

WORKING.

50.59 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/01

/2017/4875211

4

WASH TANK

LOOSING

WATER

171.90 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/08

/2017/4877936

7

waste water

pump leaking

from air exhaus

305.00 $ 238.15 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/09

/2017/4878350

4

COVERS

STUCK AT EXIT

CONVEYER

45.06 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I02

Repair

scheduled /

deferred

EP1_100/03/21

/2017/4882532

2

COVERS

GETTING

STUCK ON

ROLLERS TO

BELT

255.41 $

03/2017EP1_100/12

058980

VS1 Assy /

JenFab

Washer

EP1_100/I11Maintenance /

Inspection

EP1_100/02/20

/2017/4871429

2

VS1 Assy Mech /