cougar run & buffalo ridge - himmelman construction · 2013-03-21 · knee fc fc fc bc comp...

18
KNEE FC FC FC BC COMP KNEE BC FC KNEE COMP A.V. INSTR. ELEC 514.1D KINDERGARTEN 513 TOILET 513A TOILET 514.1C CORRIDOR 008 CLOSET WORK 514D A. PRIN. 514E PRIN. 514B CORRIDOR 007 COMPUTER 511 PASSAGE 006 STOR. 501B TOIL. 509A SPECIAL ED. 508 TOILET 508A CORRIDOR 004 PASSAGE 003 RES. OFFICE 505 CUST. 500C CONF. 503 COMMUNITY 502 VESTIBULE 001B KITCHEN 402A TOIL. 402E CUST. 402D FREEZER 402B STORAGE 402C DINING/MUSIC PLATFORM 402 STOR. 402F MUSIC 403 MUSIC 404 WOMEN 400A MEN 400B RAMP 405 MULTI-PURPOSE 406 CUSTODIAN 408 OFFICE 407 MECHANICAL 406A STORAGE 406C ELECTRICAL 406B VESTIBULE 406E STORAGE 409 MEDIA CENTER 501 TOIL. 500B HEALTH 514C GALLERIA 001 CONFERENCE 514A OFFICE 514 VESTIBULE 001A CLASSROOM 306 GIRLS 300A BOYS 300B CLASSROOM 305 CLASSROOM 304 CORRIDOR 032 CLASSROOM 303 GROUP ROOM 307 CLASSROOM 301 CORRIDOR 030 CLASSROOM 302 L. D. 507 KINDERGARTEN 512 TOILET 512A OFFICE 501A TELEPHONE TEACHER OFFICE 510 SPEECH 506 TOIL. 500A CHAIRS 406D READING ROOM 308 CORRIDOR 031 KILN TEACHER LOUNGE 509 PSYCH/OFF 504 PASSAGE 402F INTERCOM WATER HTR STORAGE 108 CORRIDOR 010 CORRIDOR 012 CORRIDOR 002 CORRIDOR 011 CLASSROOM 102 CLASSROOM 101 GROUP ROOM 107 CLASSROOM 103 CLASSROOM 104 CLASSROOM 105 BOYS 100B GIRLS 100A CLASSROOM 106 CORRIDOR 020 CORRIDOR 022 STORAGE 208 GROUP ROOM 207 CLASSROOM 202 CLASSROOM 203 CLASSROOM 201 GIRLS 200A CLASSROOM 204 CLASSROOM 205 CORRIDOR 021 BOYS 200B CLASSROOM 206 CORRIDOR 005 DOOR 405A P 1 A5.01 1 A5.11 SHEET NUMBER DRAWING NUMBER SHEET NUMBER DRAWING NUMBER SHEET NUMBER DRAWING NUMBER BUILDING SECTION IDENTIFICATION WALL SECTION IDENTIFICATION 1 A9.01 SHEET NUMBER DRAWING NUMBER DETAIL IDENTIFICATION INTERIOR ELEVATION IDENTIFICATION 1 A6.01 SHEET NUMBER DRAWING NUMBER ENLARGED DETAIL IDENTIFICATION AREA OF DRAWING TO BE ENLARGED SECTION MATERIAL GRAPHICS 23A 76H PARTITION TYPE; RE: PARTITION TYPE SCHEDULE PARTITION TYPE; RE: PARTITION TYPE SCHEDULE PARTITION TYPE IDENTIFICATION ACOUSTICAL PARTITION TYPE IDENTIFICATION 308 DOOR NUMBER DOOR IDENTIFICATION ROOM NAME 314 876 SF ROOM NUMBER ROOM/SPACE/AREA IDENTIFICATION ROOM NAME ROOM AREA A 1 COLUMN LETTER COLUMN LETTER COLUMN REFERENCE GUIDE STRUCTURAL GRID ELEVATION LEVEL NAME BATT INSULATION CONCRETE UNDISTURBED OR COMPACTED EARTH POROUS FILL (GRAVEL) STEEL ALUMINUM MASONRY - BRICK MASONRY - CONCRETE BLOCK RIDGID INSULATION GYPSUM PLASTER PLYWOOD FINISH WOOD EXTERIOR ELEVATION IDENTIFICATION 1 A4.01 A7.01 99 99 99 99 C1 WINDOW TYPE SHEET NUMBER DRAWING NUMBER ? WINDOW IDENTIFICATION KEYNOTE IDENTIFICATION NOTE NUMBER 001 ASI REVISION IDENTIFICATION REVISION NUMBER REVISION DESCRIPTION Name Elevation ELEVATION DATUM IDENTIFICATION OCCUPANCY: CONSTRUCTION TYPE(S): SPRINKLERED: ALLOWABLE SQUARE FOOTAGE: ALLOWABLE BUILDING HEIGHT: BUILDING CONSTRUCTION: EXTERIOR BEARING WALLS: INTERIOR BEARING WALLS: EXTERIOR NON-BEARING WALLS: STRUCTURAL FRAME: FLOORS - CEILINGS/ROOFS: ROOFS - CEILINGS/ROOFS: SHAFT ENCLOSURES (4+ STORIES): STAIRWAY CONSTRUCTION: GROSS BUILDING AREA: BUILDING HEIGHT: NUMBER OF STORIES: ESTIMATED OCCUPANT LOAD: BUILDING CODES: INCREASE FOR FRONTAGE: E A-3 B II-B NONE E: 14,500 S.F. A-3: 9,500 S.F. B: 23,000 S.F. 55' - 0" II-B 0 HR 0 HR 0 HR 0 HR 0 HR 0 HR N/A N/A 50,668 S.F. 24'-0" AT (E) GYM 1 1,590 2006 IBC BUILDING & CODE INFORMATION 2 HOUR SEPARATION 2 HOUR SEPARATION 2,056 NET S.F. 42 OCCUPANT LOAD A-3 - OCCUPANCY (NO SEPARATION REQUIRED FOR ACCESSORY USE TO E - OCCUPANCY) EXISTING MEDIA CENTER 1,751 S.F. 18 OCCUPANT LOAD B - OCCUPANCY (ACCESSORY USE UNDER 10% NO SEPARATION REQUIRED) EXISTING OFFICES 1,911 S.F. 128 OCCUPANT LOAD A-3 - OCCUPANCY (NO SEPARATION REQUIRED FOR ACCESSORY USE TO E - OCCUPANCY) EXISTING CAFETERIA 3,146 S.F. 210 OCCUPANT LOAD A-3 - OCCUPANCY (NO SEPARATION REQUIRED FOR ACCESSORY USE TO E - OCCUPANCY) EXISTING GYM 50,668 G.S.F. 28,338 NET S.F. 1,192 OCCUPANT LOAD EXISTING BUILDING E - OCCUPANCY 7,280 G.S.F. E - OCCUPANCY 7,280 G.S.F. E - OCCUPANCY 34,917 G.S.F. E - OCCUPANCY OCCUPANCY CLASSIFICATION LEGEND E A-3 B PROJ. NO. DRAWN: CHECKED: DATE: REVISIONS © OZ ARCHITECTURE SCALE: SHEET NUMBER SHEET TITLE: ISSUED FOR: APPROVED: 3003 LARIMER STREET DENVER, CO 80205 PHONE 303.861.5704 8780 Venneford RanchRoad Highlands Ranch, CO 80126 3/15/201310:36:43AM C:\RevitLocal Files\512121_DCSD-CR_A12\512121_DCSD- CR_A12_ashaver.rvt As indicated COUGAR RUN 512121.00 AS RG 03.15.2013 100% CD COVER SHEET AND CODE PLAN G1.00 COUGAR RUN KY ABBREVIATIONS LT LIGHT LTL LINTEL LVR LOUVER LDR LEADER LP LIGHTING PANEL or LIGHT PROOF MO MASONRY OPENING MAS MASONRY MATL MATERIAL MAX MAXIMUM MECH MECHANICAL MEP MECHANICAL, ELECTRICAL and PLUMBING MTL METAL MFR MANUFACTURER MIN MINIMUM MIRR MIRROR MISC MISCELLANEOUS MEMB MEMBRANE MTD MOUNT(ED) MUL MULLION MED MEDIUM MAG MAGNETIC MACH MACHINERY MM MILLIMETERS MH MANHOLE MEZZ MEZZANINE MB MOISTURE BARRIER N NORTH (N) NEW NIC NOT IN CONTRACT NTS NOT TO SCALE NO NUMBER NOM NOMINAL NRC NOISE REDUCTION COEFFICIENT OA OVERALL OC ON CENTER OD OUTSIDE DIAMETER OTO OUTSIDE-TO-OUTSIDE OFF OFFICE OH OPPOSITE HAND OPNG OPENING OPP OPPOSITE OF OUTSIDE FACE PC PRECAST PAC PREVIOUSLY AWARDED CONTRACT P/L PROPERTY LINE PLAM PLASTIC LAMINATE PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POST TENSIONED or PORCELAIN TILE PTDR PAPER TOWEL DISPENSER AND RECEPTACLE PVC POLYVINYL CHLORIDE PLYWD PLYWOOD PREFAB PREFABRICATED PL PLATE PLAS PLASTER PNL PANEL P PAINT(ED) PR PAIR or PROPOSAL REQUEST PROJ PROJECT PTD PAPER TOWEL DISPENSER PTN PARTITION PVMT PAVEMENT PRESTR PRESTRESSED PBO PROVIDED BY OTHERS PAR PARALLEL PREFIN PREFINISHED POL POLISHED PLBG PLUMBING PKG PARKING PERIM PERIMETER PERF PERFORATED PTR PAPER TOWEL RECEPTACLE PRIM PRIMARY PT POINT OF TANGENCY QTY QUANTITY QT QUARRY TILE (R) REMOVE R RISER RD ROOF DRAIN or ROAD RL RAIN LEADER RO ROUGH OPENING ROD ROOF OVERFLOW DRAIN RWC RAIN WATER CONDUCTOR RAD RADIUS RE REFER TO or REFERENCE REINF REINFORCED REC RECESS(ED) REF REFRIGERATOR or REFRIGERATED REQD REQUIRED RESIL RESILIENT REV REVISE, REVISED or REVISION(S) RFG ROOFING RFL REFLECTED RM ROOM ROW RIGHT OF WAY RBS RUBBER BASE STRAIGHT RBC RUBBER BASE COVE RB RUBBER BASE RH RIGHT HAND RF RESILIENT FLOORING RECPT RECEPTACLE RBT RUBBER TILE RVS REVERSE (SIDE) RPM REVOLUTIONS PER MINUTE SPRT SUPPORT S SOUTH or SEALED SC SOLID CORE SCD SEAT COVER DISPENSER SD SOAP DISPENSER SNC SANITARY NAPKIN CABINET SND SANITARY NAPKIN DISPENSER SNR SANITARY NAPKIN RECEPTACLE SSK SERVICE SINK SS STAINLESS STEEL SR SINK RECEPTACLE SCHED SCHEDULE SEC SECTION SHWR SHOWER SHT SHEET SHTG SHEATHING SIM SIMILAR SPECS SPECIFICATION(S) SQ SQUARE SF SQUARE FEET STL STEEL STA STATION STD STANDARD STOR STORAGE STRUCT STRUCTURE or STRUCTURAL SUSP SUSPEND(ED) SYM SYMMETRICAL SYS SYSTEM SOFF SOFFIT SPKR SPEAKER SPKL SPRINKLER T&B TOP AND BOTTOM T TREAD T&G TONGUE AND GROOVE TB TOWEL BAR TO TOP OF TPD TOILET PAPER DISPENSER TPTN TOILET PARTITION TV TELEVISION TELE TELEPHONE THK THICK or THICKNESS THLD THRESHOLD TYP TYPICAL TEMP TEMPORARY or TEMPERATURE TG TEMPERED GLASS TBC TOP OF BACK OF CURB TS TUBE STEEL TOW TOP OF WALL TOS TOP OF STEEL TOC TOP OF CONCRETE THERM THERMOSTAT USGS U.S. GEOLOGICAL SURVEY UL UNDERWRITER'S LABORATORY UON UNLESS OTHERWISE NOTED UOS UNLESS OTHERWISE SPECIFIED UNFIN UNFINISHED UR. URINAL V VOLT VB VAPOR BARRIER VCT VINYL COMPOSITION TILE VTR VENT THROUGH ROOF VWC VINYL WALL COVERING VERT VERTICAL VEST VESTIBULE VIN VINYL or SHEET VINYL VAR VARY or VARIES VIF VERIFY IN FIELD VER VERIFY VENT VENTILATION VOL VOLUME WD WOOD W WEST or WIDE W/C WATER CLOSET WPT WORKING POINT W/R WATER RESISTANT WWF WELDED WIRE FABRIC W/ WITH W/O WITHOUT WF. WIDE FLANGE or WOOD FLOORING WDO WINDOW WP WATERPROOF(ING) WSCT WAINSCOT WC WALL COVERING WT WEIGHT W.O. WHERE OCCURS WGL WIRE GLASS YD YARD & AND < ANGLE @ AT # POUND(S) or NUMBER AB ANCHOR BOLT AFF ABOVE FINISHED FLOOR ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS ABV ABOVE ACOUS ACCOUSTICAL ACT ACCOUSTICAL CEILING TILE ADD ADDENDUM ADJ ADJACENT or ADJUSTABLE AGG AGGREGATE AHU AIR HANDLING UNIT ALUM ALUMINUM ALT ALTERNATE AVE AVENUE ARCH ARCHITECTURAL ASPH ASPHALT AUTO AUTOMATIC AD AREA DRAIN or ACCESS DOOR ANOD ANODIZED APPROX APPROXIMATE A/V AUDIO/VISUAL AVG AVERAGE AWP ACOUSTICAL WALL PANEL B.O.F. BY OWNER, FUTURE BD BOARD B.O. BY OWNER BLDG BUILDING BIT BITUMINOUS BLKG BLOCKING BM BEAM or BENCH MARK BOT BOTTOM BRG BEARNING BSMT BASEMENT B BASE CJ CONTROL JOINT CL COLUMN LINE CONF CONFERENCE C.L. CENTERLINE CIRC CIRCUMFERENCE CAB CABINET C CAULKING CCD CONSTRUCTION CHANGE DIRECTIVE CFL COUNTERFLASHING CG CORNER GUARD CM CENTIMETERS CMU CONCRETE MASONRY UNIT CO CHANGE ORDER or CLEANOUT CT CERAMIC TILE CDOT COLORADO DEPARTMENT OF TRANSPORTATION CEM CEMENTITIOUS CK CORK TILE CLG CEILING CLOS CLOSET CLR CLEAR CTR COUNTER COL COLUMN CONC CONCRETE CONSTR CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CORR CORRIDOR or CORRUGATED CPT CARPET CIP CAST IN PLACE CONN CONNECTION CATV CABLE TELEVISION CCTV CLOSED CIRCUIT TELEVISION CU CUBIC CY CUBIC YARD DEG DEGREE DAMP DAMPROOFING DF DRINKING FOUNTAIN DBL DOUBLE DEPT DEPARTMENT DTL DETAIL DIA DIAMETER DIM DIMENSION DN DOWN DISP DISPENSER DR DOOR DS DOWNSPOUT DWG DRAWING DWR DRAWER DIV DIVISION DIAG DIAGONAL DEMO DEMOLISH or DEMOLITION EJ EXPANSION JOINT (E) EXISTING EB EXPANSION BOLT E EAST ED EXHAUST DUCT EF EXHAUST FAN or EACH FACE EWC ELECTRIC WATER COOLER EA EACH EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR EMER EMERGENCY ENGR ENGINEER EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT EXT EXTERIOR ES EACH SIDE EWH ELECTRIC WATER HEATER EW EACH WAY EST ESTIMATE FAC FIRE ALARM CABINET FA FIRE ALARM FACP FIRE ALARM CONTROL PANEL FBO FURNISHED BY OTHER(S) FD FLOOR DRAIN or FIRE DAMPER FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FFL FINISHED FLOOR LINE FHC FIRE HOSE CABINET FR FIRE RESISTIVE or FIRE RATED FDN FOUNDATION FIN FINISH(ED) FIXT FIXTURE FLG FLASHING FLR FLOOR(ING) FLUOR FLUORESCENT FRT FIRE RETARDANT TREATED FRP FIBERGLASS REINFORCED PANEL(ING) FT FOOT (FEET) FTG FOOTING FURR FURRED or FURRING FUT FUTURE F FARENHEIT FVC FIRE VALVE CABINET FHMS FLAT HEAD MACHINE SCREW FH FIRE HYDRANT FF FINISHED FLOOR FURN FURNISH(ED) FOM FACE OF MASONRY FOF FACE OF FINISH FOS FACE OF STUD FOC FACE OF CONCRETE FHWS FLAT HEAD WOOD SCREW FHV FIRE HOSE VALVE GWB GYPSUM WALLBOARD GC GENERAL CONTRACTOR GB GRAB BAR GYP. BD. GYPSUM BOARD GCMU GLAZED CONCRETE MASONRY UNIT(S) GA GAUGE GR GRADE GL GLASS or GLAZING GND GROUND GALV GALVANIZED GYP GYPSUM GT GLASS TILE GRT GROUT GI GALVANIZED IRON HC HOLLOW CORE or HANDICAPPED HM HOLLOW METAL HDR HEADER HDWR HARDWARE HT HEIGHT HORIZ HORIZONTAL HR HOUR HVAC HEATING, VENTILATION and AIR CONDITIONING HB HOSE BIB HDAS HEADED DEFORMED ANCHOR STUD HAS HEADED ANCHOR STUD HWY HIGHWAY HWH HOT WATER HEATER HW HOT WATER HTR HEATER IBC INTERNATIONAL BUILDING CODE or INSTALLED BY CONTRACTOR ID INSIDE DIAMETER IN INCH(ES) INFO INFORMATION INSUL INSULATION or INSULATED INT INTERIOR INCAND INCANDESCENT INV INVERT INTMED INTERMEDIATE INCL INCLUD(ED) JST JOIST JT JOINT JC JANITOR CLOSET KD KNOCKDOWN KP KICK PLATE KIT KITCHEN KO KNOCKOUT LH LEFT HAND LLH LONG LEG HORIZONTAL LLV LONG LEG VERTICAL LAB LABORATORY LAM LAMINATE LAV LAVATORY LBL LABEL LKR LOCKER GRAPHIC STANDARDS OWNER DOUGLAS COUNTY SCHOOL DISTRICT RE-1 620 WILCOX STREET CASTLE ROCK, CO 80104 P:303.387.0100 ELECTRICAL CEI CONSULTING ENGINEERS 1710 CHAPEL HILLS DRIVE COLORADO SPRINGS, CO 80920 P:719.594.0022 ARCHITECT OZ ARCHITECTURE 3003 LARIMER STREET DENVER, CO 80205 P:303.861.5704 ROOFING SR+dK CONSULTANTS, INC. 722 WASHINGTON AVE. GOLDEN, CO 80401 P:720.890.8974 PROJECT TEAM VICINITY MAP - COUGAR RUN 8780 Venneford Ranch Road Highlands Ranch, CO 80126 100% CD 03.15.2013 BUILDING & CODE INFORMATION GENERAL NOTES 1. DO NOT SCALE DRAWINGS. IF REQUIRED DIMENSION(S) ARE MISSING, REQUEST CLARIFICATION FROM ARCHITECT PRIOR TO STARTING ASSOCIATED PORTIONS OF WORK. 2. THE WORK SHOWN AS EXISTING CONDITIONS WAS TAKEN FROM OWNER-FURNISHED DRAWINGS BY DOUGLAS COUNTY SCHOOL DISTRICT. OZ ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANY INFORMATION OR THE ADEQUACY, SAFETY AND CONFORMANCE TO CURRENT PREVAILING CODES OF ANY WORK SHOWN AS EXISTING ON THE DOCUMENTS. 3. NOTIFY ARCHITECT IMMEDIATELY SHOULD CONDITIONS BE FOUND CONTRADICTORY TO THESE DRAWINGS. 4. OBTAIN OWNER APPROVAL OF ANY ELECTRICAL POWER OUTAGES NECESSITATED BY CONSTRUCTION 48 HOURS PRIOR TO SHUT-DOWN. 5. PROVIDE AND MAINTAIN ACCESSIBLE ACCESS TO BUILDING FOR DURATION OF CONSTRUCTION. CONTRACTOR TO COORDINATE WITH APPROPRIATE JURISDICTIONS FOR ANY TEMPORARY EGRESS NECESSARY DURING CONSTRUCTION. 6. PROTECT ALL FURNITURE, FINISHES AND EQUIPMENT FROM DUST, DEBRIS AND DAMAGE DUE TO WORK INVOLVED. 7. PATCH ALL AREAS AFFECTED BY DEMOLITION OR REPLACEMENT OF ITEMS TO MATCH ADJACENT SURFACES, WHETHER SPECIFICALLY MENTIONED IN THE DRAWINGS OR NOT. 8. UPON DISCOVERY OF HAZARDOUS MATERIALS ENCOUNTERED DURING DEMOLITION, NOTIFY DESIGNER AND OWNER IMMEDIATELY AND AWAIT FURTHER INSTRUCTIONS. THE WORK AREA SHALL BE COMPLETELY SEALED OFF DURING ABATEMENT 9. CONTRACTOR MUST COORDINATE MATERIALS STAGING, SITE AND BUILDING ACCESS AND SECURITY MEASURES WITH THE OWNER. DRAWING INDEX 0' 4' 16' 32' 64' 8' PLAN NORTH TRUE NORTH 1/16" = 1'-0" 1 COUGAR RUN CODE PLAN (SIM. BUFFALO RIDGE) COUGAR RUN & BUFFALO RIDGE 7075 N. Shoreham Drive Castle Rock, CO 80108 8780 Venneford Ranch Road Highlands Ranch, CO 80126 | COUGAR RUN & BUFFALO RIDGE ELEMENTARY SCHOOLS 7075 N. Shoreham Drive Castle Rock, CO 80108 8780 Venneford Ranch Road Highlands Ranch, CO 80126 | VICINITY MAP - BUFFALO RIDGE ALT. CR-1 BASE BID: PROVIDE AND INSTALL A FIRE ALARM SYSTEM AS DESCRIBED IN THE DOCUMENTS WITH SIMPLEX/GRINNELL AS THE MANUFACTURER AND FIRE ALARM CONTRACTOR. ADD ALTERNATE BID: PROVIDE A FIRE ALARM SYSTEM AS DESCRIBED IN THE DOCUMENTS MANUFACTURED BY NOTIFIER AND INSTALLED BY FIRE DETECTION SYSTEMS, LLC. ALT. CR-2 BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, 400A, AND 400B, CORRIDORS 011, 021, AND 031. ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID, REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS KINDERGARTEN 512A, KINDERGARTEN 513A, STAFF 500, HEALTH OFFICE 514C, HEALTH OFFICE TOILET 514.1C, AND KITCHEN 402E. RE. SPEC FOR INCLUDED WORK. ALT. CR-3 BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, 400A, AND 400B, CORRIDORS 011, 021, AND 031. ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID, REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS STAFF 500B, STAFF LOUNGE 509A, SPECIAL ED 508A. RE. SPEC FOR INCLUDED WORK. ALT. CR-4 BASE BID: DO NOT MAKE ANY CHANGES TO DOOR 405A. ADD ALTERNATE BID: AT DOOR 405A, LEADING TO MULTI- PURPOSE ROOM 406, PROVIDE AND INSTALL MAGNETIC HOLD OPENS AS DESCRIBED IN THE DOCUMENTS. ALT. CR-5 BASE BID: DO NOT MAKE ANY CHANGES TO THE LIGHTING IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, 400A, AND 400B. AD ALTERNATE BID: IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, 400A, AND 400B ADD EMERGENCY LIGHTING AS DESCRIBED IN THE DOCUMENTS. ALT. BR-1 BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300, BHEALTH OFFICE 514C, AND HEALTH OFFICE TOILET 514.1C, . ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID, REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN KITCHEN 402A, STORAGE 402D, TOILET 402E, LAUNDRY 402F, AND PASSAGE 402H. RE. SPEC FOR INCLUDED WORK. ALT. BR-2 BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, HEALTH OFFICE 514C, AND HEALTH OFFICE TOILET 514.1C. ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID, REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN STAFF 500A, STAFF 500B, AND SPECIAL ED 508A. RE. SPEC FOR INCLUDED WORK. ALT. BR-3 BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, HEALTH OFFICE 514C, AND HEALTH OFFICE TOILET 514.1C. ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID, REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEW MMA RESINOUS FLOORING IN 400A, 400B, KINDERGARTEN 512A, KINDERGARTEN 513A, AND STAFF LOUNGE 509A. RE. SPEC FOR INCLUDED WORK. ALTERNATE LIST

Upload: others

Post on 25-Jan-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

KNEE

FC

FC

FCBC COMP

KNEE

BC

FC

KNEE

COMP

A.V.

INSTR.

ELEC514.1D

KINDERGARTEN513

TOILET513A

TOILET514.1C

CORRIDOR008

CLOSET

WORK514D

A. PRIN.514E

PRIN.514B

CORRIDOR007

COMPUTER511

PASSAGE006

STOR.501B

TOIL.509A

SPECIAL ED.508

TOILET508A

CORRIDOR004

PASSAGE003

RES. OFFICE505

CUST.500C

CONF.503

COMMUNITY502

VESTIBULE001B

KITCHEN402A

TOIL.402E

CUST.402D

FREEZER402B

STORAGE402C

DINING/MUSIC PLATFORM402

STOR.402F

MUSIC403

MUSIC404

WOMEN400A

MEN400B

RAMP405

MULTI-PURPOSE406

CUSTODIAN408

OFFICE407

MECHANICAL406A

STORAGE406C

ELECTRICAL406B

VESTIBULE406E

STORAGE409

MEDIA CENTER501

TOIL.500B

HEALTH514C

GALLERIA001

CONFERENCE514A

OFFICE514

VESTIBULE001A

CLASSROOM306

GIRLS300A

BOYS300B

CLASSROOM305

CLASSROOM304

CORRIDOR032

CLASSROOM303

GROUP ROOM307

CLASSROOM301

CORRIDOR030

CLASSROOM302

L. D.507

KINDERGARTEN512

TOILET512A

OFFICE501A

TELEPHONE

TEACHER OFFICE510

SPEECH506

TOIL.500A

CHAIRS406D

READING ROOM308

CORRIDOR031

KILN

TEACHER LOUNGE509

PSYCH/OFF504

PASSAGE402F

INTERCOM

WATER HTR

STORAGE108

CORRIDOR010 CORRIDOR

012

CORRIDOR002

CORRIDOR011

CLASSROOM102

CLASSROOM101

GROUP ROOM107

CLASSROOM103

CLASSROOM104

CLASSROOM105

BOYS100B

GIRLS100A

CLASSROOM106

CORRIDOR020

CORRIDOR022

STORAGE208 GROUP ROOM

207

CLASSROOM202

CLASSROOM203

CLASSROOM201

GIRLS200A

CLASSROOM204

CLASSROOM205

CORRIDOR021

BOYS200B

CLASSROOM206

CORRIDOR005

DOOR405A

P

1A5.01

1A5.11

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

BUILDING SECTION IDENTIFICATION

WALL SECTION IDENTIFICATION

1A9.01 SHEET NUMBER

DRAWING NUMBER

DETAIL IDENTIFICATION

INTERIOR ELEVATION IDENTIFICATION

1A6.01 SHEET NUMBER

DRAWING NUMBER

ENLARGED DETAIL IDENTIFICATION

AREA OF DRAWING TOBE ENLARGED

SECTION MATERIALGRAPHICS

23A

76H

PARTITION TYPE; RE:PARTITION TYPE SCHEDULE

PARTITION TYPE; RE:PARTITION TYPE SCHEDULE

PARTITION TYPE IDENTIFICATION

ACOUSTICAL PARTITION TYPE IDENTIFICATION

308 DOOR NUMBER

DOOR IDENTIFICATION

ROOM NAME314

876 SF

ROOM NUMBER

ROOM/SPACE/AREA IDENTIFICATION

ROOM NAME

ROOM AREA

A

1

COLUMN LETTER

COLUMN LETTER

COLUMN REFERENCEGUIDE

STRUCTURAL GRID

ELEVATION

LEVEL NAME

BATT INSULATION

CONCRETE

UNDISTURBED ORCOMPACTED EARTH

POROUS FILL(GRAVEL)

STEEL

ALUMINUM

MASONRY - BRICK

MASONRY -CONCRETE BLOCK

RIDGID INSULATION

GYPSUM PLASTER

PLYWOOD

FINISH WOOD

EXTERIOR ELEVATION IDENTIFICATION

1A4.01

A7.01

99

99

99

99

C1 WINDOW TYPESHEET NUMBER

DRAWING NUMBER

?

WINDOW IDENTIFICATION

KEYNOTE IDENTIFICATION

NOTE NUMBER

001ASI

REVISION IDENTIFICATION

REVISION NUMBER

REVISION DESCRIPTION

NameElevation

ELEVATION DATUM IDENTIFICATION

OCCUPANCY:

CONSTRUCTION TYPE(S):

SPRINKLERED:

ALLOWABLE SQUARE FOOTAGE:

ALLOWABLE BUILDING HEIGHT:

BUILDING CONSTRUCTION:EXTERIOR BEARING WALLS:INTERIOR BEARING WALLS:EXTERIOR NON-BEARING WALLS:STRUCTURAL FRAME:FLOORS - CEILINGS/ROOFS:ROOFS - CEILINGS/ROOFS:SHAFT ENCLOSURES (4+ STORIES):STAIRWAY CONSTRUCTION:

GROSS BUILDING AREA:BUILDING HEIGHT:NUMBER OF STORIES:ESTIMATED OCCUPANT LOAD:

BUILDING CODES:

INCREASE FOR FRONTAGE:

EA-3B

II-B

NONE

E: 14,500 S.F.A-3: 9,500 S.F.B: 23,000 S.F.

55' - 0"

II-B0 HR0 HR0 HR0 HR0 HR0 HRN/AN/A

50,668 S.F.24'-0" AT (E) GYM11,590

2006 IBC

BUILDING & CODE INFORMATION

2 HOURSEPARATION

2 HOURSEPARATION

2,056 NET S.F.42 OCCUPANT LOAD

A-3 - OCCUPANCY (NO SEPARATION REQUIREDFOR ACCESSORY USE TO E - OCCUPANCY)

EXISTING MEDIA CENTER

1,751 S.F.18 OCCUPANT LOAD

B - OCCUPANCY (ACCESSORY USE UNDER 10% NOSEPARATION REQUIRED)

EXISTING OFFICES

1,911 S.F.128 OCCUPANT LOAD

A-3 - OCCUPANCY (NO SEPARATION REQUIREDFOR ACCESSORY USE TO E - OCCUPANCY)

EXISTING CAFETERIA

3,146 S.F.210 OCCUPANT LOAD

A-3 - OCCUPANCY (NO SEPARATION REQUIREDFOR ACCESSORY USE TO E - OCCUPANCY)

EXISTING GYM

50,668 G.S.F.

28,338 NET S.F.1,192 OCCUPANT LOAD

EXISTING BUILDING

E - OCCUPANCY

7,280 G.S.F.

E - OCCUPANCY

7,280 G.S.F.

E - OCCUPANCY

34,917 G.S.F.

E - OCCUPANCY

OCCUPANCY CLASSIFICATION LEGEND

E

A-3

B

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

8780

Ven n

e fo r

dR

anc h

Ro a

dH

ighl

ands

Ra n

c h, C

O80

1 26

3/15

/201

310

:36:

43AM

C:\R

evit

Loca

lFile

s\5 1

2121

_DC

SD-C

R_A

12\ 5

1212

1_D

CSD

- CR

_A12

_ash

ave r

.rvt

As indicated

COUG

AR R

UN

512121.00

AS

RG

03.15.2013

100% CD

COVER SHEET ANDCODE PLAN

G1.00

COUGAR RUN

KY

ABBREVIATIONSLT LIGHTLTL LINTELLVR LOUVERLDR LEADERLP LIGHTING PANEL or LIGHT

PROOFMO MASONRY OPENINGMAS MASONRYMATL MATERIALMAX MAXIMUMMECH MECHANICALMEP MECHANICAL, ELECTRICAL

and PLUMBINGMTL METALMFR MANUFACTURERMIN MINIMUMMIRR MIRRORMISC MISCELLANEOUSMEMB MEMBRANEMTD MOUNT(ED)MUL MULLIONMED MEDIUMMAG MAGNETICMACH MACHINERYMM MILLIMETERSMH MANHOLEMEZZ MEZZANINEMB MOISTURE BARRIERN NORTH(N) NEWNIC NOT IN CONTRACTNTS NOT TO SCALENO NUMBERNOM NOMINALNRC NOISE REDUCTION

COEFFICIENTOA OVERALLOC ON CENTEROD OUTSIDE DIAMETEROTO OUTSIDE-TO-OUTSIDEOFF OFFICEOH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOF OUTSIDE FACEPC PRECASTPAC PREVIOUSLY AWARDED

CONTRACTP/L PROPERTY LINEPLAM PLASTIC LAMINATEPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPT POST TENSIONED or

PORCELAIN TILEPTDR PAPER TOWEL DISPENSER

AND RECEPTACLEPVC POLYVINYL CHLORIDEPLYWD PLYWOODPREFAB PREFABRICATEDPL PLATEPLAS PLASTERPNL PANELP PAINT(ED)PR PAIR or PROPOSAL

REQUESTPROJ PROJECTPTD PAPER TOWEL DISPENSERPTN PARTITIONPVMT PAVEMENTPRESTR PRESTRESSEDPBO PROVIDED BY OTHERSPAR PARALLELPREFIN PREFINISHEDPOL POLISHEDPLBG PLUMBINGPKG PARKINGPERIM PERIMETERPERF PERFORATEDPTR PAPER TOWEL RECEPTACLEPRIM PRIMARYPT POINT OF TANGENCYQTY QUANTITYQT QUARRY TILE(R) REMOVER RISERRD ROOF DRAIN or ROADRL RAIN LEADERRO ROUGH OPENINGROD ROOF OVERFLOW DRAINRWC RAIN WATER CONDUCTORRAD RADIUSRE REFER TO or REFERENCEREINF REINFORCEDREC RECESS(ED)REF REFRIGERATOR or

REFRIGERATEDREQD REQUIREDRESIL RESILIENTREV REVISE, REVISED or

REVISION(S)RFG ROOFINGRFL REFLECTEDRM ROOMROW RIGHT OF WAYRBS RUBBER BASE STRAIGHTRBC RUBBER BASE COVERB RUBBER BASERH RIGHT HANDRF RESILIENT FLOORINGRECPT RECEPTACLERBT RUBBER TILERVS REVERSE (SIDE)RPM REVOLUTIONS PER MINUTESPRT SUPPORTS SOUTH or SEALEDSC SOLID CORESCD SEAT COVER DISPENSERSD SOAP DISPENSERSNC SANITARY NAPKIN CABINETSND SANITARY NAPKIN

DISPENSERSNR SANITARY NAPKIN

RECEPTACLESSK SERVICE SINKSS STAINLESS STEELSR SINK RECEPTACLESCHED SCHEDULESEC SECTIONSHWR SHOWERSHT SHEETSHTG SHEATHINGSIM SIMILARSPECS SPECIFICATION(S)SQ SQUARESF SQUARE FEETSTL STEELSTA STATIONSTD STANDARDSTOR STORAGESTRUCT STRUCTURE or STRUCTURALSUSP SUSPEND(ED)SYM SYMMETRICALSYS SYSTEMSOFF SOFFITSPKR SPEAKERSPKL SPRINKLERT&B TOP AND BOTTOMT TREADT&G TONGUE AND GROOVETB TOWEL BARTO TOP OFTPD TOILET PAPER DISPENSERTPTN TOILET PARTITIONTV TELEVISIONTELE TELEPHONETHK THICK or THICKNESSTHLD THRESHOLDTYP TYPICALTEMP TEMPORARY or

TEMPERATURETG TEMPERED GLASSTBC TOP OF BACK OF CURBTS TUBE STEELTOW TOP OF WALLTOS TOP OF STEELTOC TOP OF CONCRETETHERM THERMOSTATUSGS U.S. GEOLOGICAL SURVEYUL UNDERWRITER'S

LABORATORYUON UNLESS OTHERWISE

NOTEDUOS UNLESS OTHERWISE

SPECIFIEDUNFIN UNFINISHEDUR. URINALV VOLTVB VAPOR BARRIERVCT VINYL COMPOSITION TILEVTR VENT THROUGH ROOFVWC VINYL WALL COVERINGVERT VERTICALVEST VESTIBULEVIN VINYL or SHEET VINYLVAR VARY or VARIESVIF VERIFY IN FIELDVER VERIFYVENT VENTILATIONVOL VOLUMEWD WOODW WEST or WIDEW/C WATER CLOSETWPT WORKING POINTW/R WATER RESISTANTWWF WELDED WIRE FABRICW/ WITHW/O WITHOUTWF. WIDE FLANGE or WOOD

FLOORINGWDO WINDOWWP WATERPROOF(ING)WSCT WAINSCOTWC WALL COVERINGWT WEIGHTW.O. WHERE OCCURSWGL WIRE GLASSYD YARD

& AND< ANGLE@ AT# POUND(S) or NUMBERAB ANCHOR BOLTAFF ABOVE FINISHED FLOORASI ARCHITECT'S

SUPPLEMENTALINSTRUCTIONS

ABV ABOVEACOUS ACCOUSTICALACT ACCOUSTICAL CEILING TILEADD ADDENDUMADJ ADJACENT or ADJUSTABLEAGG AGGREGATEAHU AIR HANDLING UNITALUM ALUMINUMALT ALTERNATEAVE AVENUEARCH ARCHITECTURALASPH ASPHALTAUTO AUTOMATICAD AREA DRAIN or ACCESS

DOORANOD ANODIZEDAPPROX APPROXIMATEA/V AUDIO/VISUALAVG AVERAGEAWP ACOUSTICAL WALL PANELB.O.F. BY OWNER, FUTUREBD BOARDB.O. BY OWNERBLDG BUILDINGBIT BITUMINOUSBLKG BLOCKINGBM BEAM or BENCH MARKBOT BOTTOMBRG BEARNINGBSMT BASEMENTB BASECJ CONTROL JOINTCL COLUMN LINECONF CONFERENCEC.L. CENTERLINECIRC CIRCUMFERENCECAB CABINETC CAULKINGCCD CONSTRUCTION CHANGE

DIRECTIVECFL COUNTERFLASHINGCG CORNER GUARDCM CENTIMETERSCMU CONCRETE MASONRY UNITCO CHANGE ORDER or

CLEANOUTCT CERAMIC TILECDOT COLORADO DEPARTMENT

OF TRANSPORTATIONCEM CEMENTITIOUSCK CORK TILECLG CEILINGCLOS CLOSETCLR CLEARCTR COUNTERCOL COLUMNCONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACTORCORR CORRIDOR or CORRUGATEDCPT CARPETCIP CAST IN PLACECONN CONNECTIONCATV CABLE TELEVISIONCCTV CLOSED CIRCUIT

TELEVISIONCU CUBICCY CUBIC YARDDEG DEGREEDAMP DAMPROOFINGDF DRINKING FOUNTAINDBL DOUBLEDEPT DEPARTMENTDTL DETAILDIA DIAMETERDIM DIMENSIONDN DOWNDISP DISPENSERDR DOORDS DOWNSPOUTDWG DRAWINGDWR DRAWERDIV DIVISIONDIAG DIAGONALDEMO DEMOLISH or DEMOLITIONEJ EXPANSION JOINT(E) EXISTINGEB EXPANSION BOLTE EASTED EXHAUST DUCTEF EXHAUST FAN or EACH FACEEWC ELECTRIC WATER COOLEREA EACHEL ELEVATIONELEC ELECTRICALELEV ELEVATOREMER EMERGENCYENGR ENGINEEREOS EDGE OF SLABEQ EQUALEQUIP EQUIPMENTEXT EXTERIORES EACH SIDEEWH ELECTRIC WATER HEATEREW EACH WAYEST ESTIMATEFAC FIRE ALARM CABINETFA FIRE ALARMFACP FIRE ALARM CONTROL

PANELFBO FURNISHED BY OTHER(S)FD FLOOR DRAIN or FIRE

DAMPERFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER

CABINETFFL FINISHED FLOOR LINEFHC FIRE HOSE CABINETFR FIRE RESISTIVE or FIRE

RATEDFDN FOUNDATIONFIN FINISH(ED)FIXT FIXTUREFLG FLASHINGFLR FLOOR(ING)FLUOR FLUORESCENTFRT FIRE RETARDANT TREATEDFRP FIBERGLASS REINFORCED

PANEL(ING)FT FOOT (FEET)FTG FOOTINGFURR FURRED or FURRINGFUT FUTUREF FARENHEITFVC FIRE VALVE CABINETFHMS FLAT HEAD MACHINE

SCREWFH FIRE HYDRANTFF FINISHED FLOORFURN FURNISH(ED)FOM FACE OF MASONRYFOF FACE OF FINISHFOS FACE OF STUDFOC FACE OF CONCRETEFHWS FLAT HEAD WOOD SCREWFHV FIRE HOSE VALVEGWB GYPSUM WALLBOARDGC GENERAL CONTRACTORGB GRAB BARGYP. BD. GYPSUM BOARDGCMU GLAZED CONCRETE

MASONRY UNIT(S)GA GAUGEGR GRADEGL GLASS or GLAZINGGND GROUNDGALV GALVANIZEDGYP GYPSUMGT GLASS TILEGRT GROUTGI GALVANIZED IRONHC HOLLOW CORE or

HANDICAPPEDHM HOLLOW METALHDR HEADERHDWR HARDWAREHT HEIGHTHORIZ HORIZONTALHR HOURHVAC HEATING, VENTILATION and

AIR CONDITIONINGHB HOSE BIBHDAS HEADED DEFORMED

ANCHOR STUDHAS HEADED ANCHOR STUDHWY HIGHWAYHWH HOT WATER HEATERHW HOT WATERHTR HEATERIBC INTERNATIONAL BUILDING

CODE or INSTALLED BYCONTRACTOR

ID INSIDE DIAMETERIN INCH(ES)INFO INFORMATIONINSUL INSULATION or INSULATEDINT INTERIORINCAND INCANDESCENTINV INVERTINTMED INTERMEDIATEINCL INCLUD(ED)JST JOISTJT JOINTJC JANITOR CLOSETKD KNOCKDOWNKP KICK PLATEKIT KITCHENKO KNOCKOUTLH LEFT HANDLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLAB LABORATORYLAM LAMINATELAV LAVATORYLBL LABELLKR LOCKER

GRAPHIC STANDARDS

OWNERDOUGLAS COUNTY SCHOOLDISTRICT RE-1620 WILCOX STREETCASTLE ROCK, CO 80104P:303.387.0100

ELECTRICALCEI CONSULTING ENGINEERS1710 CHAPEL HILLS DRIVECOLORADO SPRINGS, CO80920P:719.594.0022

ARCHITECTOZ ARCHITECTURE3003 LARIMER STREETDENVER, CO 80205

P:303.861.5704

ROOFINGSR+dK CONSULTANTS, INC.722 WASHINGTON AVE.GOLDEN, CO 80401

P:720.890.8974

PROJECT TEAMVICINITY MAP - COUGAR RUN

8780 Venneford Ranch RoadHighlands Ranch, CO 80126

COUGAR RUN

100% CD03.15.2013

BUILDING & CODE INFORMATION

GENERAL NOTES

1. DO NOT SCALE DRAWINGS. IF REQUIRED DIMENSION(S) ARE MISSING,REQUEST CLARIFICATION FROM ARCHITECT PRIOR TO STARTINGASSOCIATED PORTIONS OF WORK.

2. THE WORK SHOWN AS EXISTING CONDITIONS WAS TAKEN FROMOWNER-FURNISHED DRAWINGS BY DOUGLAS COUNTY SCHOOL DISTRICT.OZ ARCHITECTURE IS NOT RESPONSIBLE FOR THE ACCURACY OF ANYINFORMATION OR THE ADEQUACY, SAFETY AND CONFORMANCE TOCURRENT PREVAILING CODES OF ANY WORK SHOWN AS EXISTING ON THEDOCUMENTS.

3. NOTIFY ARCHITECT IMMEDIATELY SHOULD CONDITIONS BE FOUNDCONTRADICTORY TO THESE DRAWINGS.

4. OBTAIN OWNER APPROVAL OF ANY ELECTRICAL POWER OUTAGESNECESSITATED BY CONSTRUCTION 48 HOURS PRIOR TO SHUT-DOWN.

5. PROVIDE AND MAINTAIN ACCESSIBLE ACCESS TO BUILDING FOR DURATIONOF CONSTRUCTION. CONTRACTOR TO COORDINATE WITH APPROPRIATEJURISDICTIONS FOR ANY TEMPORARY EGRESS NECESSARY DURINGCONSTRUCTION.

6. PROTECT ALL FURNITURE, FINISHES AND EQUIPMENT FROM DUST, DEBRISAND DAMAGE DUE TO WORK INVOLVED.

7. PATCH ALL AREAS AFFECTED BY DEMOLITION OR REPLACEMENT OF ITEMSTO MATCH ADJACENT SURFACES, WHETHER SPECIFICALLY MENTIONED INTHE DRAWINGS OR NOT.

8. UPON DISCOVERY OF HAZARDOUS MATERIALS ENCOUNTERED DURINGDEMOLITION, NOTIFY DESIGNER AND OWNER IMMEDIATELY AND AWAITFURTHER INSTRUCTIONS. THE WORK AREA SHALL BE COMPLETELYSEALED OFF DURING ABATEMENT

9. CONTRACTOR MUST COORDINATE MATERIALS STAGING, SITE ANDBUILDING ACCESS AND SECURITY MEASURES WITH THE OWNER.

DRAWING INDEX

0' 4' 16' 32' 64'8'PLAN NORTH TRUE NORTH

1/16" = 1'-0"1 COUGAR RUN CODE PLAN (SIM. BUFFALO RIDGE)

COUG

AR R

UN &

BUF

FALO

RID

GE

707

5 N

. Sho

reha

m D

rive

C

astle

Roc

k, C

O 8

0108

8780

Ven

nefo

rd R

anch

Roa

dH

ighl

ands

Ran

ch, C

O 8

0126

|

COUGAR RUN & BUFFALO RIDGEELEMENTARY SCHOOLS

7075 N. Shoreham Drive Castle Rock, CO 80108

8780 Venneford Ranch RoadHighlands Ranch, CO 80126 |

VICINITY MAP - BUFFALO RIDGE

ALT. CR-1BASE BID: PROVIDE AND INSTALL A FIRE ALARM SYSTEM ASDESCRIBED IN THE DOCUMENTS WITH SIMPLEX/GRINNELL AS THEMANUFACTURER AND FIRE ALARM CONTRACTOR.

ADD ALTERNATE BID: PROVIDE A FIRE ALARM SYSTEM ASDESCRIBED IN THE DOCUMENTS MANUFACTURED BY NOTIFIERAND INSTALLED BY FIRE DETECTION SYSTEMS, LLC.

ALT. CR-2BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, 400A, AND 400B, CORRIDORS 011, 021, AND031.

ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN RESTROOMS KINDERGARTEN 512A,KINDERGARTEN 513A, STAFF 500, HEALTH OFFICE 514C, HEALTHOFFICE TOILET 514.1C, AND KITCHEN 402E. RE. SPEC FORINCLUDED WORK.

ALT. CR-3BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, 400A, AND 400B, CORRIDORS 011, 021, AND031.

ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN RESTROOMS STAFF 500B, STAFFLOUNGE 509A, SPECIAL ED 508A. RE. SPEC FOR INCLUDED WORK.

ALT. CR-4BASE BID: DO NOT MAKE ANY CHANGES TO DOOR 405A.

ADD ALTERNATE BID: AT DOOR 405A, LEADING TO MULTI-PURPOSE ROOM 406, PROVIDE AND INSTALL MAGNETIC HOLDOPENS AS DESCRIBED IN THE DOCUMENTS.

ALT. CR-5BASE BID: DO NOT MAKE ANY CHANGES TO THE LIGHTING INRESTROOMS 100A, 100B, 200A, 200B, 300A, 300B, 400A, AND 400B.

AD ALTERNATE BID: IN RESTROOMS 100A, 100B, 200A, 200B, 300A,300B, 400A, AND 400B ADD EMERGENCY LIGHTING AS DESCRIBEDIN THE DOCUMENTS.

ALT. BR-1BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300, BHEALTH OFFICE 514C, AND HEALTH OFFICETOILET 514.1C, .

ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN KITCHEN 402A, STORAGE 402D,TOILET 402E, LAUNDRY 402F, AND PASSAGE 402H. RE. SPEC FORINCLUDED WORK.

ALT. BR-2BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, HEALTH OFFICE 514C, AND HEALTH OFFICETOILET 514.1C.

ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN STAFF 500A, STAFF 500B, ANDSPECIAL ED 508A. RE. SPEC FOR INCLUDED WORK.

ALT. BR-3BASE BID: REMOVE AND REPLACE EXISTING FLOOR AND BASEWITH NEW MMA RESINOUS FLOORING IN RESTROOMS 100A, 100B,200A, 200B, 300A, 300B, HEALTH OFFICE 514C, AND HEALTH OFFICETOILET 514.1C.

ADD ALTERNATE BID: IN ADDITION TO RESTROOMS IN BASE BID,REMOVE AND REPLACE EXISTING FLOOR AND BASE WITH NEWMMA RESINOUS FLOORING IN 400A, 400B, KINDERGARTEN 512A,KINDERGARTEN 513A, AND STAFF LOUNGE 509A. RE. SPEC FORINCLUDED WORK.

ALTERNATE LIST

Page 2: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

KNEE

FC

FC

FCBC COMP

KNEE

BC

FC

KNEE

COMP

A.V.

INSTR.

ELEC514.1D

KINDERGARTEN513

TOILET513A

TOILET514.1C

CORRIDOR008

CLOSET

WORK514D

A. PRIN.514E

PRIN.514B

CORRIDOR007

COMPUTER511

PASSAGE006

STOR.501B

TOIL.509A

SPECIAL ED.508

TOILET508A

CORRIDOR004

PASSAGE003

RES. OFFICE505

CUST.500C

CONF.503

COMMUNITY502

VESTIBULE001B

KITCHEN402A

TOIL.402E

CUST.402D

FREEZER402B

STORAGE402C

DINING/MUSIC PLATFORM402

STOR.402F

MUSIC403

MUSIC404

WOMEN400A

MEN400B

RAMP405

MULTI-PURPOSE406

CUSTODIAN408

OFFICE407

MECHANICAL406A

STORAGE406C

ELECTRICAL406B

VESTIBULE406E

STORAGE409

MEDIA CENTER501

TOIL.500B

HEALTH514C

GALLERIA001

CONFERENCE514A

OFFICE514

VESTIBULE001A

CLASSROOM306

GIRLS300A

BOYS300B

CLASSROOM305

CLASSROOM304

CORRIDOR032

CLASSROOM303

GROUP ROOM307

CLASSROOM301

CORRIDOR030

CLASSROOM302

L. D.507

KINDERGARTEN512

TOILET512A

OFFICE501A

TELEPHONE

TEACHER OFFICE510

SPEECH506

TOIL.500A

CHAIRS406D

READING ROOM308

CORRIDOR031

KILN

TEACHER LOUNGE509

PSYCH/OFF504

PASSAGE402F

INTERCOM

WATER HTR

STORAGE108

CORRIDOR010 CORRIDOR

012

CORRIDOR002

COR

CORR02

STORAGE208

CORRIDOR005

DOOR405A

P

12

14

OPQR

6

15

16

17

EGIKN

5.8

7

DEMO LEGEND

REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.

REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.

REMOVE FLOOR MOUNTED PLUMBINGFIXUTRE FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.

1 / AD2.11

1 / AD2.10

1 / AD2.111 / AD2.10

1.1

1.1

1.4

1.3

1.3

1.3

1.3

1.3

1.3

1.4

1.11.1

1.3

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0 1.0

1.0 1.0

THIS WORK IS PART OF ALT. CR-2

THIS WORK ISPART OF ALT. CR-2

THIS WORK IS PART OF ALT. CR-2

THIS WORK IS PARTOF ALT. CR-2

THIS WORK IS PARTOF ALT. CR-2

THIS WORK IS PARTOF ALT. CR-3

THIS WORK IS PARTOF ALT. CR-3

THIS WORK IS PARTOF ALT. CR-3

DEMO FLAGNOTES

REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL

1.0

1.1

1.21.3

1.4

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

8780

Ven n

e fo r

dR

anc h

Ro a

dH

ighl

ands

Ra n

c h, C

O80

1 26

3/15

/201

310

:36:

39AM

C:\R

evit

Loca

lFile

s\5 1

2121

_DC

SD-C

R_A

12\ 5

1212

1_D

CSD

- CR

_A12

_ash

ave r

.rvt

As indicated

COUG

AR R

UN

512121.00

AS

RG

03.15.2013

100% CD

DEMOLITION FLOORPLAN - AREA A

AD2.10

COUGAR RUN

KY

DEMO PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,

ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES

BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.

EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.

6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST

REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.

8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.

0' 2' 8' 16' 32'4'

PLAN NORTH TRUE NORTH

1/8" = 1'-0"1 DEMO FLOOR PLAN - AREA A

KEY PLAN - AREA A

Page 3: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

513A

TOIL.509A

CORRIDOR004

RES. OFFICE

CUST.500C

TELEPHONE

TOIL.500A

WATER HTR

STORAGE108

CORRIDOR010 CORRIDOR

012

CORRIDOR002

CORRIDOR011

CLASSROOM102

CLASSROOM101

GROUP ROOM107

CLASSROOM103

CLASSROOM104

CLASSROOM105

BOYS100B

GIRLS100A

CLASSROOM106

CORRIDOR020

CORRIDOR022

STORAGE208 GROUP ROOM

207

CLASSROOM202

CLASSROOM203

CLASSROOM201

GIRLS200A

CLASSROOM204

CLASSROOM205

CORRIDOR021

BOYS200B

CLASSROOM206

CORRIDOR005

7

9

11

13

12

10

8

6

5

4

DEFHJMN GIK C B A

3

2

1

1 / A2.11

1 / A2.10

1 / A2.111 / A2.10

1.4

1.11.1

1.4

1.1

1.1

FLOOR SLIGHTLYRAISED AROUNDDRAIN.

1.01.0

1.0

1.0

DEMO LEGEND

REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.

REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.

REMOVE FLOOR MOUNTED PLUMBINGFIXUTRE FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.

DEMO FLAGNOTES

REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL

1.0

1.1

1.21.3

1.4

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

8780

Ven n

e fo r

dR

anc h

Ro a

dH

ighl

ands

Ra n

c h, C

O80

1 26

As indicated

COUG

AR R

UN

512121.00

AS

RG

03.15.2013

100% CD

DEMOLITION FLOORPLAN - AREA B

AD2.11

COUGAR RUN

KY

0' 2' 8' 16' 32'4'

PLAN NORTH TRUE NORTH

1/8" = 1'-0"1 DEMO FLOOR PLAN - AREA B

DEMO PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,

ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES

BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.

EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.

6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST

REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.

8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.

KEY PLAN - AREA B

Page 4: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

KNEE

FC

FC

FCBC COMP

KNEE

BC

FC

KNEE

COMP

A.V.

INSTR.

ELEC514.1D

KINDERGARTEN513

TOILET513A

TOILET514.1C

CORRIDOR008

CLOSET

WORK514D

A. PRIN.514E

PRIN.514B

CORRIDOR007

COMPUTER511

PASSAGE006

STOR.501B

TOIL.509A

SPECIAL ED.508

TOILET508A

CORRIDOR004

PASSAGE003

RES. OFFICE505

CUST.500C

CONF.503

COMMUNITY502

VESTIBULE001B

KITCHEN402A

TOIL.402E

CUST.402D

FREEZER402B

STORAGE402C

DINING/MUSIC PLATFORM402

STOR.402F

MUSIC403

MUSIC404

WOMEN400A

MEN400B

RAMP405

MULTI-PURPOSE406

CUSTODIAN408

OFFICE407

MECHANICAL406A

STORAGE406C

ELECTRICAL406B

VESTIBULE406E

STORAGE409

MEDIA CENTER501

TOIL.500B

HEALTH514C

GALLERIA001

CONFERENCE514A

OFFICE514

VESTIBULE001A

CLASSROOM306

GIRLS300A

BOYS300B

CLASSROOM305

CLASSROOM304

CORRIDOR032

CLASSROOM303

GROUP ROOM307

CLASSROOM301

CORRIDOR030

CLASSROOM302

L. D.507

KINDERGARTEN512

TOILET512A

OFFICE501A

TELEPHONE

TEACHER OFFICE510

SPEECH506

TOIL.500A

CHAIRS406D

READING ROOM308

CORRIDOR031

KILN

TEACHER LOUNGE509

PSYCH/OFF504

PASSAGE402F

INTERCOM

WATER HTR

STORAGE108

CORRIDOR010 CORRIDOR

012

CORRIDOR002

COR

CORR02

STORAGE208

CORRIDOR005

DOOR405A

P

12

14

OPQR

6

15

16

17

EGIKN

5.8

7

1 / A2.111 / A2.10

10.1

10.1

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.0

10.110.1

9.0

1 / A2.11

1 / A2.10

9.1

9.1

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0 10.0

10.0 10.0

THIS WORK IS PART OF ALT. CR-2

THIS WORK ISPART OF ALT. CR-2

THIS WORK IS PART OF ALT. CR-2

THIS WORK IS PARTOF ALT. CR-2

THIS WORK IS PARTOF ALT. CR-2

THIS WORK IS PARTOF ALT. CR-3

THIS WORK IS PARTOF ALT. CR-3

THIS WORK IS PARTOF ALT. CR-3

THIS WORK IS PARTOF ALT. CR-4

FLAGNOTES

PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR.PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.

9.09.1

10.010.1

PLAN LEGEND

NEW MMA FLOORING AND BASE

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

8780

Ven n

e fo r

dR

anc h

Ro a

dH

ighl

ands

Ra n

c h, C

O80

1 26

3/15

/201

3 10

:36:

34 A

MC

:\Rev

itLo

calF

iles\

5 121

21_D

CSD

-CR

_A12

\ 512

121_

DC

SD- C

R_A

12_a

shav

e r.rv

t

As indicated

COUG

AR R

UN

512121.00

Author

Checker

03.15.2013

100% CD

FLOOR PLAN - AREA A

A2.10

COUGAR RUN

Approver

0' 2' 8' 16' 32'4'

GENERAL PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF

DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR

MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.

6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED.

7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.

8. RE: SHEET A2.11 FOR TYPICAL FLOOR DETAILS.

PLAN NORTH TRUE NORTH

1/8" = 1'-0"1 FLOOR PLAN - AREA A

KEY PLAN - AREA A

Page 5: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

513A

TOIL.509A

CORRIDOR004

RES. OFFICE

CUST.500C

CONF.

TOIL.500A

WATER HTR

STORAGE108

CORRIDOR010 CORRIDOR

012

CORRIDOR002

CORRIDOR011

CLASSROOM102

CLASSROOM101

GROUP ROOM107

CLASSROOM103

CLASSROOM104

CLASSROOM105

BOYS100B

GIRLS100A

CLASSROOM106

CORRIDOR020

CORRIDOR022

STORAGE208 GROUP ROOM

207

CLASSROOM202

CLASSROOM203

CLASSROOM201

GIRLS200A

CLASSROOM204

CLASSROOM205

CORRIDOR021

BOYS200B

CLASSROOM206

CORRIDOR005

7

9

11

13

12

10

8

6

5

4

DEFHJMN GIK C B A

3

2

1

EXISTING FLOORING,(VCT, CARPET, CONCRETE SUBFLOOR)

TRANSITION STRIP

MMA, EPOXY RESINOUSFLOORING

EXISTING CONCRETE SUBFLOOR

STRAIGHT SAW CUT 1/4" DEEP, ATPERIMETER OF FLOOR AREA TOPROVIDE EXTRA ADHEASION ATEDGES.

1/2"

MAX

.

1 1/2"

SEAMLESS RESIN COVEBASE

MMA, EPOXY RESINOUSFLOORING

(E) CONCRETE SUBFLOOR

(E) WALL

CO

VEH

EIG

HT

4"-6

"

1 / A2.11

1 / A2.11

1 / A2.10

9.0

10.110.1

9.010.1

10.1

9.1

9.1

10.010.0

10.0

10.0

THIS WORK IS PART OF ALT. CR-2

FLAGNOTES

PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR.PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.

9.09.1

10.010.1

PLAN LEGEND

NEW MMA FLOORING AND BASE

MMA, EPOXY RESINOUSFLOORING

EXISTING CONCRETESUBFLOOR

MANUFACTURER APPROVEDPATCHING MATERIAL

SAW

CU

T1/

2"

MMA, EPOXY RESINOUSFLOORING

EXISTING CONCRETESUBFLOOR

MANUFACTURER APPROVEDPATCHING MATERIAL

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

8780

Ven n

e fo r

dR

anc h

Ro a

dH

ighl

ands

Ra n

c h, C

O80

1 26

As indicated

COUG

AR R

UN

512121.00

AS

RG

03.15.2013

100% CD

FLOOR PLAN - AREA BAND DETAILS

A2.11

COUGAR RUN

KY

GENERAL PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF

DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR

MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.

6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED.

7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.

8. RE: SHEET A2.11 FOR TYPICAL FLOOR DETAILS.

3" = 1'-0"2

TRANSITION @ (E) FLOOR ANDEPOXY RESINOUS FLOORING

3" = 1'-0"3 EPOXY BASE

0' 2' 8' 16' 32'4'

PLAN NORTH TRUE NORTH

1/8" = 1'-0"1 FLOOR PLAN - AREA B

KEY PLAN - AREA B

3" = 1'-0"4 SUBFLOOR CRACK REPAIR

3" = 1'-0"5 FLOOR DRAIN WITH REPAIR

Page 6: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

15

Page 7: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c
Page 8: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

15

Page 9: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c
Page 10: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

300B 300A

Page 11: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c
Page 12: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

KNEE

FC

FC

FCBCCOMP

KNEE

BC

FC

KNEE

COMP

A.V.

INSTR.

ELEC

KINDERGARTEN513

TOILET513A

TOILET514.1C

CORRIDOR

CLOSET

WORK514D

A. PRIN.514B

PRIN.514A

CORRIDOR

COMPUTER511

PASSAGE

STOR.

TOIL.509A

SPECIAL ED.508

TOILET508A

CORRIDOR

PASSAGE

RES. OFFICE505

CUST.

CONF.503

COMMUNITY502

VESTIBULE

KITCHEN402A

TOIL.402E

CUST.402G

FREEZER402C

STORAGE402D

DINING/MUSIC PLATFORM402

STOR.

MUSIC403

MUSIC404

WOMEN400A

MEN400B

RAMP

MULTI-PURPOSE406

CUSTODIAN

OFFICE407

MECHANICAL

STORAGE

ELECTRICAL

VESTIBULE

STORAGE

MEDIA CENTER501

TOIL.500B

HEALTH514C

GALLERIA

CONFERENCE514E

OFFICE514

VESTIBULE

CLASSROOM306

GIRLS300A

BOYS300B

CLASSROOM305

CLASSROOM304

CORRIDOR

CLASSROOM303

GROUP ROOM307

CLASSROOM301

CORRIDOR

CLASSROOM302

L. D.507

KINDERGARTEN512

TOILET512A

OFFICE

TELEPHONE

TEACHER OFFICE510

SPEECH506

TOIL.500A

CHAIRS

STORAGE

CORRIDOR

KILN

TEACHER LOUNGE509

PSYCH/OFF504

PASSAGE402H

INTERCOM

WATER HTR

STORAGE CORRIDORCORRIDOR

CORRIDOR

ORRIDOR

CORRIDOR

STORAGE

M

CORRIDOR

F.S. ROOM

REF.402B

CUST.

LAUNDRY402F

P

14

O P Q R

15

16

17

E G I K N

5.8

DEMO LEGEND

REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.

REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.

REMOVE FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.

1.3

1 / AD2.11

1 / AD2.10

1 / AD2.111 / AD2.10

1.3

1.3

1.3

1.3

1.1

1.1

1.5 1.2

1.3

1.11.1

1.3

1.3

1.2

1.3

1.0

1.0

1.0

1.0

1.01.0

1.0

1.0

1.0

1.0

1.0

THIS WORK ISPART OF ALT.BR-1

THIS WORK IS PART OF ALT. BR-2

THIS WORK IS PARTOF ALT. BR-2

THIS WORK IS PARTOF ALT. BR-2

THIS WORK IS PARTOF ALT. BR-3

THIS WORK IS PARTOF ALT. BR-3

THIS WORK IS PARTOF ALT. BR-3

THIS WORK IS PARTOF ALT. BR-3

DEMO FLAGNOTES

REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIAL TOSTRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL TO STRUCTURAL FLOOR.REMOVE (E) CEMENTITIOUS FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.

1.0

1.1

1.21.3

1.4

1.5

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

7075

N.S

h ore

h am

Dr iv

eC

a st le

Roc

k,C

O80

108

3/15

/201

310

:33:

58AM

C:\R

evit

Loca

lFile

s\5 1

2121

_DC

SD-B

R_A

12\ 5

1212

1_D

CSD

- BR

_A12

_ash

ave r

.rvt

As indicated

BUFF

ALO

RIDG

E

512121.00

AS

RG

03.15.2013

100% CD

DEMOLITION FLOORPLAN - AREA A

BD2.10

BUFFALO RIDGE

KY

DEMO PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,

ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES

BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.

EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.

6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST

REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.

8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.

0' 2' 8' 16' 32'4'

PLAN NORTH TRUE NORTH 1/8" = 1'-0"1 DEMO FLOOR PLAN - AREA A

KEY PLAN - AREA A

Page 13: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

TOIL.509A

CORRIDOR

PASSAGE

RES. OFFICE505

CUST.

CONF.503

TELEPHONE

TOIL.500A

WATER HTR

STORAGE CORRIDORCORRIDOR

CORRIDOR

CORRIDOR

CLASSROOM102

CLASSROOM101

GROUP ROOM107

CLASSROOM103

CLASSROOM104

CLASSROOM105

BOYS100B GIRLS

100A

CLASSROOM106

CORRIDOR

CORRIDOR

STORAGEGROUP ROOM

207

CLASSROOM202

CLASSROOM203

CLASSROOM201

GIRLS200A

CLASSROOM204

CLASSROOM205

CORRIDOR

BOYS200B

CLASSROOM206

CORRIDOR

7

9

11

13

12

10

8

6

5

4

D E F H J M NG I KCBA

3

2

1

1 / AD2.11

1 / AD2.10

1 / AD2.111 / AD2.10

1.3

1.1 1.1

1.3

1.1

1.3

1.0

1.0

1.01.0

DEMO LEGEND

REMOVE FLOOR FINISH AND BASE FORNEW FLOORING.

REMOVE AND STORE TOILET PARTITIONFOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTER NEW FLOORING HASBEEN POURED.

REMOVE FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF (E) FLOOR FINISH.REINSTALL AFTERN NEW FLOORING HASBEEN POURED.

DEMO FLAGNOTES

REMOVE AND STORE FOR REINSTALLATION (E) FLOOR MOUNTED PLUMBINGFIXTURES FOR DEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) TOILET PARTITIONS FORDEMO OF FLOOR FINISH.REMOVE AND STORE FOR REINSTALLATION (E) CASEWORK/EQUP.REMOVE (E) VINYL SHEET FLOORING AND BASE. REMOVE ALL MATERIAL TOSTRUCTURAL FLOOR.REMOVE (E) CONTINUOUS EPOXY FLOORING AND BASE. REMOVE ALLMATERIAL TO STRUCTURAL FLOOR.REMOVE (E) CEMENTITIOUS FLOORING AND BASE. REMOVE ALL MATERIALTO STRUCTURAL FLOOR.

1.0

1.1

1.21.3

1.4

1.5

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

7075

N.S

h ore

h am

Dr iv

eC

a st le

Roc

k,C

O80

108

As indicated

BUFF

ALO

RIDG

E

512121.00

AS

RG

03.15.2013

100% CD

DEMOLITION FLOORPLAN - AREA B

BD2.11

BUFFALO RIDGE

KY

0' 2' 8' 16' 32'4'

PLAN NORTH TRUE NORTH

1/8" = 1'-0"1 DEMO FLOOR PLAN - AREA B

DEMO PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION2. (E) BULIDING, ITEMS, ETC. TO REMAIN ARE DENOTED LIGHTLY U.ON.,

ITEMS SHOWN DASHED OR BOLD SHALL BE REMOVED U.O.N.3. VERIFY ALL LOCATIONS OF PUBLIC AND PRIVATE, AND ON-SITE UTILITIES

BEFORE PROCEEDING.4. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL DEMOLITION

INFORMATION.5. COORDINATE ALL DEMOLITION WORK WITH NEW CONSTRUCTION.

EXECUTE DEMOLITION AS REQUIRED TO COMPLETELY ACCOMMODATEWORK AS DELINEATED IN THE PLANS, DETAILS AND SPECIFICATIONS.

6. RELOCATION OF ALL FREESTANDING FURNITURE BY OWNER, U.O.N.7. ALL ELECT, MECH, FIRE ALARM, SECURITY AND PAGING SYSTEMS MUST

REMAIN OPERATIONAL WHILE BUILDING IS OCCUPIED ANDOPPERATIONAL.

8. ALL ITEMS TO BE REMOVED SHALL BE REMOVED IN THEIR ENTIRETY ANDLEGALLY DISPOSED OF.

KEY PLAN - AREA B

Page 14: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

KNEE

FC

FC

FCBCCOMP

KNEE

BC

FC

KNEE

COMP

A.V.

INSTR.

ELEC

KINDERGARTEN513

TOILET513A

TOILET514.1C

CORRIDOR

CLOSET

WORK514D

A. PRIN.514B

PRIN.514A

CORRIDOR

COMPUTER511

PASSAGE

STOR.

TOIL.509A

SPECIAL ED.508

TOILET508A

CORRIDOR

PASSAGE

RES. OFFICE505

CUST.

CONF.503

COMMUNITY502

VESTIBULE

KITCHEN402A

TOIL.402E

CUST.402G

FREEZER402C

STORAGE402D

DINING/MUSIC PLATFORM402

STOR.

MUSIC403

MUSIC404

WOMEN400A

MEN400B

RAMP

MULTI-PURPOSE406

CUSTODIAN

OFFICE407

MECHANICAL

STORAGE

ELECTRICAL

VESTIBULE

STORAGE

MEDIA CENTER501

TOIL.500B

HEALTH514C

GALLERIA

CONFERENCE514E

OFFICE514

VESTIBULE

CLASSROOM306

GIRLS300A

BOYS300B

CLASSROOM305

CLASSROOM304

CORRIDOR

CLASSROOM303

GROUP ROOM307

CLASSROOM301

CORRIDOR

CLASSROOM302

L. D.507

KINDERGARTEN512

TOILET512A

OFFICE

TELEPHONE

TEACHER OFFICE510

SPEECH506

TOIL.500A

CHAIRS

STORAGE

CORRIDOR

KILN

TEACHER LOUNGE509

PSYCH/OFF504

PASSAGE402H

INTERCOM

WATER HTR

STORAGE CORRIDORCORRIDOR

CORRIDOR

DOR

RIDOR

STORAGE

CORRIDOR

F.S. ROOM

REF.402B

CUST.

LAUNDRY402F

P

12

14

O P Q R

6

15

16

17

E G I K N

5.8

7

1 / A2.11

1 / A2.10

1 / A2.111 / A2.10

9.0

9.0

9.0

9.0

9.0

10.1

10.1

9.0

9.0

10.1

9.0

9.0

9.0

9.1

11

11

10.0

10.0

10.0

10.0

10.010.0

10.0

10.0

10.0

10.0

10.1

10.0

THIS WORK ISPART OF ALT.BR-1

THIS WORK IS PART OF ALT. BR-2

THIS WORK IS PARTOF ALT. BR-2

THIS WORK IS PARTOF ALT. BR-2

THIS WORK IS PARTOF ALT. BR-3

THIS WORK IS PARTOF ALT. BR-3

THIS WORK IS PARTOF ALT. BR-3

THIS WORK IS PARTOF ALT. BR-3

FLAGNOTES

PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR .PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.REPLACE (E) CASEWORK/EQUIP.

9.09.1

10.010.111.0

PLAN LEGEND

NEW MMA FLOORING AND BASE

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

7075

N.S

h ore

h am

Dr iv

eC

a st le

Roc

k,C

O80

108

3/15

/201

3 10

:33:

54 A

MC

:\Rev

itLo

calF

iles\

5 121

21_D

CSD

-BR

_A12

\ 512

121_

DC

SD- B

R_A

12_a

shav

e r.rv

t

As indicated

BUFF

ALO

RIDG

E

512121.00

AS

RG

03.15.2013

100% CD

FLOOR PLAN - AREA A

B2.10

BUFFALO RIDGE

KY

0' 2' 8' 16' 32'4'

GENERAL PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF

DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR

MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.

6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED

7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.

8. RE: SHEET B2.11 FOR TYPICAL FLOOR DETAILS.

PLAN NORTH TRUE NORTH 1/8" = 1'-0"

1 FLOOR PLAN - AREA A

KEY PLAN - AREA A

Page 15: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

TOIL.509A

CORRIDOR

PASSAGE

RES. OFFICE505

CUST.

CONF.503

VESTIBULE

TELEPHONE

TOIL.500A

WATER HTR

STORAGE CORRIDORCORRIDOR

CORRIDOR

CORRIDOR

CLASSROOM102

CLASSROOM101

GROUP ROOM107

CLASSROOM103

CLASSROOM104

CLASSROOM105

BOYS100B GIRLS

100A

CLASSROOM106

CORRIDOR

CORRIDOR

STORAGEGROUP ROOM

207

CLASSROOM202

CLASSROOM203

CLASSROOM201

GIRLS200A

CLASSROOM204

CLASSROOM205

CORRIDOR

BOYS200B

CLASSROOM206

CORRIDOR

7

9

11

13

12

10

8

6

5

4

D E F H J M NG I KCBA

3

2

1

EXISTING FLOORING,(VCT, CARPET, CONCRETE SUBFLOOR)

TRANSITION STRIP

MMA, EPOXY RESINOUSFLOORING

(E) CONCRETE SUBFLOOR

STRAIGHT SAW CUT 1/4" DEEP,AT PERIMETER OF FLOOR AREATO PROVIDE EXTRA ADHEASIONAT EDGES.

1/2"

MAX

.

1 1/2"

1 / A2.11

1 / A2.10

1 / A2.111 / A2.10

9.0

10.1 10.1

10.1

9.0

10.1

10.0

10.0

10.010.0

FLAGNOTES

PATCH/PREP. (E) SUB FLOOR FOR NEW MMA RESINOUS FLOOR .PARCH/REPAIR CRACKS IN (E) SUB FLOOR WITH MANUFACTURERAPPROVED PATCHING MATERIAL BEFORE APPLYING NEW MMARESINOUS FLOOR.REPLACE (E) FLOOR MOUNTED PLUMBING FIXTURES.REPLACE (E)TOILET PARTITIONS.REPLACE (E) CASEWORK/EQUIP.

9.09.1

10.010.111.0

PLAN LEGEND

NEW MMA FLOORING AND BASE

MMA, EPOXY RESINOUSFLOORING

EXISTING CONCRETESUBFLOOR

MANUFACTURER APPROVEDPATCHING MATERIAL

SAW

CU

T1/

2"MMA, EPOXY RESINOUSFLOORING

EXISTING CONCRETESUBFLOOR

MANUFACTURER APPROVEDPATCHING MATERIAL

SEAMLESS RESIN COVEBASE

MMA, EPOXY RESINOUSFLOORING

(E) CONCRETE SUBFLOOR

(E) WALL

CO

VEH

EIG

HT

4"-6

"

PROJ. NO.

DRAWN:

CHECKED:

DATE:

REVISIONS

© OZ ARCHITECTURE

SCALE:SHEET NUMBER

SHEET TITLE:

ISSUED FOR:

APPROVED:

3003 LARIMER STREETDENVER, CO 80205

PHONE 303.861.5704

7075

N.S

h ore

h am

Dr iv

eC

a st le

Roc

k,C

O80

108

As indicated

BUFF

ALO

RIDG

E

512121.00

AS

RG

03.15.2013

100% CD

FLOOR PLAN - AREA BAND DETAILS

B2.11

BUFFALO RIDGE

KY

GENERAL PLAN NOTES

1. RE: GENERAL NOTES ON SHEET G1.00 FOR ADDITIONAL INFORMATION.2. EXISTING BUILDING IS SHOWN AS LIGHT SHADED LINES.3. FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS.4. FLOOR MATERIAL TRANSITIONS SHALL OCCUR AT THE CENTERLINE OF

DOOR, UNLESS OTHERWISE NOTED.5. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR

MATERIALS INTERSECT PERPENDICULAR TO EACH OTHER, AND THEINTERSECTION IS EXPOSED TO VIEW, UNLESS INDICATED OTHERWISEON THE DRAWINGS.

6. TOUCH-UP WALLS & FINISHES AS NECESSARY WHERE BASE ISREPLACED

7. PATCH/REPAIR CRACKS WITH MANUFACTURER APPROVED PATCHINGMATERIAL.

8. RE: SHEET B2.11 FOR TYPICAL FLOOR DETAILS.

3" = 1'-0"2

TRANSITION @ (E) FLOOR ANDEPOXY RESINOUS FLOORING

0' 2' 8' 16' 32'4'

PLAN NORTH TRUE NORTH

1/8" = 1'-0"1 FLOOR PLAN - AREA B

KEY PLAN - AREA B

3" = 1'-0"4 SUBFLOOR CRACK REPAIR

3" = 1'-0"5 FLOOR DRAIN WITH REPAIR

3" = 1'-0"3 EPOXY BASE

Page 16: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

15

Page 17: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

15

Page 18: COUGAR RUN & BUFFALO RIDGE - Himmelman Construction · 2013-03-21 · knee fc fc fc bc comp knee bc fc knee comp a.v. instr. elec 514.1d kindergarten 513 toilet 513a toilet 514.1c

15