council’s flood map showing the subject property and the

8
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries Our Ref: 59919008 L001:SEG Contact: Stephen Gribble 13 July 2018 Stockland Development Pty Ltd Level 25 133 Castlereagh Street Sydney NSW 2000 Attention: Anthony Kroser & Shaun Mets Email: [email protected], [email protected] Dear Anthony & Shaun, 355 AND 375 CHURCH ST PARRAMATTA - FLOOD ADVICE This flood advice statement for the proposed development at 355375 Church Street Parramatta considers flood data provided by Parramatta City Council and details of the proposed development provided by Stockland. The proposed development is reviewed to the requirements with the Section 9.1 (formerly s117) Ministerial Direction 4.3 and the requirements of the Parramatta Development Control Plan 2011 in relation to floodplain management. It is understood that as the proposed development requires an acceleration of proposed changes to the Parramatta CBD Local Environment Plan and that compliance with Section 9.1 Ministerial Directions are required. Flood Data The Flood Enquiry Information issued by Parramatta City Council on 3 July 2018 (attached) shows the site is not within the 100 year Average Recurrence Interval (ARI) mainstream flood extent and the south-eastern part of the site is within the Probable Maximum Flood (PMF) extent (classified as low hazard). Figure 1-1 is an extract from Council’s flood map showing the subject property and the PMF extent. A peak PMF level of 12m AHD is advised. It advises affectation by overland stormwater runoff from the catchment is subject to detailed investigation. It is therefore recommended that at DA stage additional assessment is undertaken to determine the extent of flooding due to local overland runoff and potential impacts for the development. Proposed Development The proposed development is a mixed-use development consisting of a fast food restaurant, retail and car parking on the ground floor. Residential towers are proposed above the mixed-use podium. Basement car parking is accessed from within the ground floor carpark. Finished floor levels are not shown on the shown on the architectural drawings. It is expected that floor levels and entrance levels will be similar to or above the existing boundaries levels shown on the survey drawing by Lockley Land Title Solutions 2008 (Ref: 31282DT, attached). The following survey levels of existing ground give an indication of reference survey levels on the boundary: Victoria Rd driveway - RL 12.2m AHD Ross Street driveway - RL 12.1m AHD Church Street verge near proposed residential lobby - RL 11.3m AHD Cardno (NSW/ACT) Pty Ltd ABN 95 001 145 035 Level 9 - The Forum 203 Pacific Highway St Leonards 2065 Australia Phone +61 2 9496 7700 Fax +61 2 9496 7748 www.cardno.com

Upload: others

Post on 22-May-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Council’s flood map showing the subject property and the

Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries

Our Ref: 59919008 L001:SEG

Contact: Stephen Gribble

13 July 2018

Stockland Development Pty Ltd Level 25 133 Castlereagh Street Sydney NSW 2000

Attention: Anthony Kroser & Shaun Mets

Email: [email protected], [email protected]

Dear Anthony & Shaun,

355 AND 375 CHURCH ST PARRAMATTA - FLOOD ADVICE

This flood advice statement for the proposed development at 355–375 Church Street Parramatta considers flood data provided by Parramatta City Council and details of the proposed development provided by Stockland. The proposed development is reviewed to the requirements with the Section 9.1 (formerly s117) Ministerial Direction 4.3 and the requirements of the Parramatta Development Control Plan 2011 in relation to floodplain management.

It is understood that as the proposed development requires an acceleration of proposed changes to the Parramatta CBD Local Environment Plan and that compliance with Section 9.1 Ministerial Directions are required.

Flood Data

The Flood Enquiry Information issued by Parramatta City Council on 3 July 2018 (attached) shows the site is not within the 100 year Average Recurrence Interval (ARI) mainstream flood extent and the south-eastern part of the site is within the Probable Maximum Flood (PMF) extent (classified as low hazard). Figure 1-1 is an extract from Council’s flood map showing the subject property and the PMF extent. A peak PMF level of 12m AHD is advised. It advises affectation by overland stormwater runoff from the catchment is subject to detailed investigation.

It is therefore recommended that at DA stage additional assessment is undertaken to determine the extent of flooding due to local overland runoff and potential impacts for the development.

Proposed Development

The proposed development is a mixed-use development consisting of a fast food restaurant, retail and car parking on the ground floor. Residential towers are proposed above the mixed-use podium. Basement car parking is accessed from within the ground floor carpark.

Finished floor levels are not shown on the shown on the architectural drawings. It is expected that floor levels and entrance levels will be similar to or above the existing boundaries levels shown on the survey drawing by Lockley Land Title Solutions 2008 (Ref: 31282DT, attached). The following survey levels of existing ground give an indication of reference survey levels on the boundary:

Victoria Rd driveway - RL 12.2m AHD

Ross Street driveway - RL 12.1m AHD

Church Street verge near proposed residential lobby - RL 11.3m AHD

Cardno (NSW/ACT) Pty Ltd ABN 95 001 145 035

Level 9 - The Forum 203 Pacific Highway St Leonards 2065 Australia

Phone +61 2 9496 7700 Fax +61 2 9496 7748

www.cardno.com

Page 2: Council’s flood map showing the subject property and the

59919008 L001:SEG 2 13 July 2018

59919008 L001 355&375ChurchSt FIA.docx

Figure 1-1 Site and Flood Extent

Compliance with Section 9.1 (formerly s117) Ministerial Direction 4.3

The requirements of Section 9.1 Ministerial Direction 4.3 include the following:

4) “A draft LEP shall include provisions that give effect to and are consistent with the NSW Flood Prone Land Policy and the principles of the Floodplain Development Manual 2005 (including the Guideline on Development Controls on Low Flood Risk Areas).

5) A draft LEP shall not rezone land within the flood planning areas from Special Use, Special Purpose,Recreation, Rural or Environmental Protection Zones to a Residential, Business, Industrial, Special Use or Special Purpose Zone.

6) A draft LEP shall not contain provisions that apply to the flood planning areas which:

(a) permit development in floodway areas,

(b) permit development that will result in significant flood impacts to other properties,

(c) permit a significant increase in the development of that land.”

A draft LEP may be inconsistent with the above requirements if it “is in accordance with a floodplain risk management plan prepared in accordance with the principles and guidelines of the Floodplain Development Manual 2005.”

The planning proposal does not involve a change of zoning. The proposed development is located on the fringe of the PMF extent. Therefore it is not in a floodway and will not result in significant flood impacts to other properties.

The only inconsistency with Ministerial Direction is that the proposed development is a significant increase in the development of the land. However inconsistencies are permitted if it “is in accordance with a floodplain risk management plan prepared in accordance with the principles and guidelines of the Floodplain Development Manual 2005.” Therefore the following section assesses the proposed development in accordance with the development controls of The Floodplain Risk Management Plan for the Upper Parramatta River Catchment.

Page 3: Council’s flood map showing the subject property and the

59919008 L001:SEG 3 13 July 2018

59919008 L001 355&375ChurchSt FIA.docx

Requirements of Parramatta DCP 2011

Parramatta DCP 2011 includes the development controls of The Floodplain Risk Management Plan for the Upper Parramatta River Catchment presented in a matrix format. Table 1-1 compares the proposed development to the floodplain matrix controls for residential and commercial development in a low flood risk precinct (being the precinct relevant for this site).

Table 1-1 Assessment Against Parramatta DCP 2011 Floodplain Matrix Controls

Consideration Relevant Controls Assessment

Floor Level 2. Habitable floor levels to be equal to or greater than the 100 year ARI flood level plus freeboard.

Existing ground survey levels at the site are at least 2m above the 100 year ARI flood level advised at locations not directly adjacent to the site.

Flood Affectation

2. The impact of the development on flooding elsewhere to be considered having regard to: (i) loss of flood storage; (ii) changes in flood levels, flows and velocities caused by alterations to flood flows; and (iii) the cumulate impact of multiple potential developments in the vicinity.

As the site is on the fringe of the PMF extent the development will not change flood flows or velocities. As the volume of flood water on the site in a PMF is negligible compared to the overall floodplain so any changes in flood level would be indiscernible.

Car Parking & Driveway Access

1. The minimum surface level of open spaces or carports shall be as high as practical, but no lower than 0.1m below the 100 year ARI flood level. In the case of garages, the minimum surface level shall be as high as practical, but no lower than the 100 year ARI flood level.

3. Garages capable of accommodating more than 3 motor vehicles on land zones for urban purposes, or enclosed car parking, must be protected from inundation by floods equal to or greater than the 100 year ARI flood. Ramp levels to be no lower than 0.5m above the 100 year ARI flood level.

5. The level of the driveway providing access between the road and parking spaces shall be no lower than 0.2m below the 100 year ARI flood level.

6. Enclosed car parking and car parking areas accommodating more than 3 vehicles, with a floor below the 100 year ARI flood level, shall have adequate warning systems, signage, exits and evacuation routes.

Existing ground survey levels at the site are at least 2m above the 100 year ARI flood level advised at locations not directly adjacent to the site.

The levels of 100 year ARI flood, PMF flood, basement floor, and basement entry should be confirmed at DA stage to assess compliance.

Evacuation 3. Reliable access for pedestrians and vehicles is required from the site to an area of refuge above the PMF level, either on site (eg. second storey) or off site.

4 Applicant is to demonstrate the development is consistent with any relevant flood evacuation strategy or similar plan.

The extent of the PMF event advised is on the south-eastern part of the site thus there are locations within the site that would be above the PMF level. There is also access to upper floors if required.

Molino Stewart (2016) identify the property as a “Shelter in Place” site for which evacuation is not required.

Local Overland Stormwater Runoff

The NSW Floodplain Development Manual (FDM) and Parramatta DCP 2011 requires that “New development must consider the impact of flooding resulting from local overland flooding whether it is a result of Local Drainage or Major Drainage.”

The site survey indicates that is a sag point on Church adjacent to the proposed development with a kerb level of RL 10.91m. Runoff may pond here when the capacity of the stormwater is exceeded until the runoff is able to overtop the crown of Victoria Road. The survey shows that the crown of Victoria Road is RL 11.45m.

Page 4: Council’s flood map showing the subject property and the

59919008 L001:SEG 4 13 July 2018

59919008 L001 355&375ChurchSt FIA.docx

A hydraulic analysis of the local stormwater has not been undertaken. It is recommended that at DA stage additional assessment is undertaken to determine the extent of flooding due to local overland runoff and potential impacts for the development.

In the absence of a detailed investigation, potentially proposed habitable floor levels be set above the Victoria Road crown level plus an appropriate freeboard. The FDM recommends that a lower freeboard is applied to overland stormwater flooding than is normally applied to mainstream flooding.

Conclusion

The Planning Proposal for 355–375 Church Street Parramatta is consistent with the Section 9.1 Ministerial Direction 4.3. The only exception is that is an increase in the occupation of the land is proposed, noting the preceding review of evacuation above.

Such inconsistencies are permitted where the planning proposal “is in accordance with a floodplain risk management plan prepared in accordance with the principles and guidelines of the Floodplain Development Manual 2005.” The proposed development is in accordance with the development controls of The Floodplain Risk Management Plan for the Upper Parramatta River Catchment as outlined in the Parramatta DCP 2011.

References

Bewsher Consulting (2003) The Floodplain Risk Management Plan for the Upper Parramatta River Catchment, prepared for the Upper Parramatta River Catchment Trust

Department of Infrastructure, Planning and Natural Resources (2005) Floodplain Development Manual

Molino Strewart (2016) Update of Parramatta Floodplain Risk Management Plans, prepared for Parramatta City Council.

Parramatta City Council (2011) Parramatta Development Control Plan 2011

Yours sincerely,

Stephen Gribble Senior Civil Engineer for Cardno Direct Line: +61 2 9496 7700 Email: [email protected] Enc: Flooding Information from Parramatta City Council Site Survey by Lockley Land Title Solutions (2008, Ref: 31282DT)

Page 5: Council’s flood map showing the subject property and the

Flood Enquiry Information Issued - 3 July 2018Mainstream Flooding

Is this property affected by mainstream flooding? 355 and 375 Church Street, Parramatta

Yes No

Flood Levels Closest Cross Sections: (Please refer to Flood Study): Refer to Flood Map

5% AEP m AHD Comments:

See Note on flood/Hazard Map 1% AEP m AHD PMF RL 12 m AHD Refer to flood maps provided for detailed flood levels.

Flood information is obtained from the following flood study report: Upper Parramatta River Flood Study – Draft 8 (UPRCT)

Note: Flood inundation can be verified by detail survey to AHD undertaken by a Registered Surveyor.

Local Flooding Is the property located within a Hatched Grey Area? Properties located within a Hatched Grey Area are subjected to flooding from the local catchment.

Yes No

Is the property located within a Grey Area? Properties located within a Grey Area are subjected to additional site drainage controls to manage flooding in the local catchment.

Yes No

Is the property likely to be affected by overland stormwater run-off from the local catchment? Note: No site inspection conducted for this assessment. Based solely on the information supplied for this flood enquiry application.

Yes Subject to Detailed

Investigation

Note: You are required to contact Council’s Development Service Engineer for any details and requirements relating to development that is affected by local flooding.

Additional Recommended Actions The Applicant needs to discuss the proposal to re-develop this site with Council’s Town Planner and Development Services Engineer. The Applicant needs to contact Council’s Town Planner and organise a pre-lodgement meeting to discuss any proposal to redevelop this property. The Applicant needs to refer to Council’s Local Floodplain Risk Management policy for details relating to developing a land affected by flooding.

Definitions: (As per NSW Floodplain Development Manual dated April 2005) 1. AHD – a common national surface level datum approximately corresponding to mean sea level.2. ARI – the long term average number of years between the occurrences of a flood as big as or larger than, the selected

event.3. PMF – is the largest flood that could conceivably occur at a particular location, usually estimated from probable maximum

precipitation.4. AEP – Annual Exceedance Probability is the chance of a flood of a given or larger size occurring in any one year, usually

expressed as a percentage.

Page 2 of 4

Page 6: Council’s flood map showing the subject property and the

City o

f Parr

amatt

a Cou

ncil F

lood M

ap

525

675

600

450

Non-Pipe

375

1200

750

1050

300 900

225

N/A

1650

150

375

300

525

300

225

525

375

300

375

600

375

375

375

375

375

450

300

525

375

600

375

375

300

600

450

375

375

450

675

450

375

750

375

900

375

300

450

375 52

5

375

375

375

600

600

600

600

Non-P

ipe

525

375

375

Non-Pipe

375

450

1050

375

375

300

Non-Pipe

375

375

450

375

375

375

375

225

900

750

375

375

375

525

450

450

375

300

375

525

300

375

30037

5

375

375

450

450

375

375

375

300

600

450

375

375

750

450

375

375

375

375

750

300

Chur

ch St

reet

O'Co

nnell

Stree

t

Victoria Road

Trott S

treet

Wilde

Aven

ue

Grose Street

Marsd

en St

reet

Ross Street

Byrnes AvenueEli

zabe

th St

reet

Maris

t Plac

e

Phillip Street

Fennell Street

Market Street

Palmer Street

Harold Street

North

cott L

ane

Sorre

ll Stre

et

Villie

rs St

reet

Palmer Lane

Lamont Street

Edgewater Parade

Grose Street

Sorre

ll Stre

et

Ross Street

Grose Street

Ross Street

Fennell Street

Fennell Street

Byrne

s Ave

nue

Sorre

ll Stre

et

Sorre

ll Stre

et

Harold Street

9

11

10

12

13

14

8

15

7

166

17

18

19

20

5

43

1

21

22

0

2

2324

40

1976

1980

2004

1935

22

2012

2050

2219

2123

2227

26

2211

1177

1733

2537

922

2196

1021

13

910

2467

846

3149

3068.2

40

137

2250

2609

1137

3171.7

1173

2629

3135.1

1786.31805.5

1822.3

2652

1773.5

3097.2

1749.1

2701

2287.9

18

1887.8

1857.5

2358

.4

60

1728.6

3047.9

1699.9

1583

44.6

59

106.2

2146

141.8

2373

.323

87.8

45

2984.3

1961.7

2341

.9

2781

2323

.7

3478.6

141

104

3307.5

3402.7

3280.7

260

3252

3225.1

2012

0

0

0

4

0

1976

0

1

1

1

1

24

24

11

1

11-13

1C

340A340A

3

53

3

340A

20

1

8

353D

11-13

22A

21

17

2626

22A

18

1

11

27

1

39

1

24A

330

24A

330

2

50

2B

20A

5

11-13

13

26

30

35

8-10

11-13

375

7

14

22B

170

1212

5

464

12-14

15

1A

2

122A

40

30B

1

37

30B

2-6

11-13

351

17

338

350

426

2A

111

44

1

20B

2

11-13

34

50

2

24

2-6

410

24

1A174

2

8

2

46-48

30B

4

2

2D

40

25

11-13

11-13

419-423

15

3

13-15

2121

8

15

6

30B

181818

53

30B

7

51

2-6

11

6666

6

11

62

4

4150 8

29

2

7

354

30B

43

9

27

9 154747

47

4949

24

11-13

174

52

470

38

353A-353C

57

10-12

1

2A

24

42

39

332

37

44

51A

32

50

47

48

3

9

24

34

43

38

2

19

42

36

14-16

16

4

9

4352

5

9

3

55

1A

34

10

2-6

53

26

44

2-6

14

29

5-7

3535

45-47

11

29

320

5252

49

31

39-435-7

33

48

3510

6

13

1

42

23

2634

50

38

31

23

11-13

25

54

4036

431

2-6

6

27

11

5858 58

40

40A

33

47

44

54

17

332

13

31

340

32-36

370

14

28

3137 39

1

51

46

2A

24

33

26

56

25

24

46

448

6

31

19

20

50

29

23

58-60

54

52

4

42A

15

30

28 3037452

43

44

28

21

11-13

41

41

42

32

32

356

22

48

37

54

330

32

20

38-40

355

14

446

22A

50-52

10

30B

49-51

31

9

387

382

10

20

33

54

333

45-47

101

24

3C

2-6

36

17

12

30

389

8

32

14

5

51A

458

16

16 431

10

398

3

32

1B

12

19

12

12

4

9

295

22

404-406

440-444

4

385

27

33

2150

1A

1818

2

6

53

49

2

17

27

2-6

50A

20-2420-24

5

11-13

34A

338A338A

2-6

330

17

53A

44

17

46-48

21

11-1318

18

25

431

56

18

456

21-2321-23

2-6

18

42-46

2-6

18

2-6

20

330

454

22

8

20

17

338

9595

396

328

4

2-6

2-620

2-6

2-6

47A

47A

29

2-62-6

2-6

2-62-6

2-6

2-6

2-6

339

55A

30

311

29

4

28A 2A

330

5

366

18

431

431431

399397

295

395

16

66-68

11A

64

295

306

11A

9

30B 3

30A

40A

22-24

415

15

321

30B

315

11-13

18

407

325

30895

30B

172B

2-6

11-13

310

279

411

2-62-6

40A40A

439-441

60A

415

318

332317 323

327

316

2A

331

435RD

314

23

3292A

31295

22D

385

11C

395

281959595

291

95

293

370B

10A

295

2B

12

323

2R

1A378-380

20 20

44

443Z

64

20

30B

20

2020

21

20

30B

382Z

20C

55A

382A

64

9 476

11B

20C

24

3055.5

1794.61809.6

1923.71946.4

3023.3

2420

1709.5

3079.2

192.4

1691.71681.3

3169.53175.6

2949.8

78.6

105

780

200

1676

2871.3

108

2

2903.42927.2

1669.6

3209.5

578.8

2091

6973

3315.2

1748.3

3237.2

1723.4

2170

22

0

0

LegendGround Contours (metre AHD)Stormwater PitStormwater Pipe NetworkUpper Parramatta River Cross Section5% AEP Flood (Upper Parramatta River)1% AEP Flood (Upper Parramatta River)PMF (Upper Parramatta River)

1:3,000

DISC

LAIM

ER: F

lood l

evels

and f

lood e

xtent

lines

are b

ased

on cu

rrent

inform

ation

held

by Co

uncil.

Coun

cil do

es no

t acce

pt res

pons

ibility

for t

he ac

curac

y of t

his In

forma

tion.

Any p

ipe si

zes

and l

ocati

on of

pits

and p

ipe lin

es sh

ould

be co

nfirm

ed by

site

inves

tigati

on.

The f

lood l

evels

prov

ided a

re on

ly an

appro

ximate

guide

and h

ave b

een d

erive

d usin

g the

curre

nt co

mpute

r sim

ulated

mod

el.

The i

nform

ation

prov

ided o

n this

docu

ment

is pre

sente

d in g

ood f

aith.

It is

the re

spon

sibilit

y of e

ach i

ndivid

ual u

sing t

his in

forma

tion t

o und

ertak

e the

ir own

chec

ks an

d con

firm th

is inf

ormati

on pr

ior to

its us

e. Cit

y of P

arram

atta C

ounc

il, its

agen

ts an

d emp

loyee

s are

not li

able

(whe

ther b

y rea

son o

f neg

ligen

ce, la

ck of

care

or oth

erwise

) to a

ny pe

rson f

or an

y dam

age o

r loss

whats

oeve

r whic

h has

oc

curre

d or m

ay oc

cur in

relat

ion to

that

perso

n tak

ing or

not t

aking

(as t

he ca

se m

ay be

) acti

on in

resp

ect o

f any

repre

senta

tion,

statem

ent,

or ad

vice r

eferre

d to a

bove

.

;N

Printed 3/07/2018

Chainage Flood Level (metre AHD) 5% AEP 1% AEP PMF

13 8.71 8.75 12.60 137 8.79 8.81 12.47

2287.9 6.47 7.64 12.72 2323.7 6.42 7.55 12.63 2341.9 6.39 7.53 12.64 3068.2 8.92 9.58 11.50 3079.2 9.10 9.54 11.41 3097.2 9.03 9.41 11.33 3135.1 8.94 9.19 11.21 3149 8.93 9.18 11.29

NOTE: The Upper Parramatta River Flood Study is currently being updated. Flood levels in this area may change.

Page 3 of 4

Page 7: Council’s flood map showing the subject property and the

City o

f Parr

amatt

a Cou

ncil H

ydrau

lic Ha

zard M

ap

525

675

600

450

Non-Pipe

375

1200

750

1050

300 900

225

N/A

1650

150

375

300

525

300

225

525

375

300

375

600

375

375

375

375

375

450

300

525

375

600

375

375

300

600

450

375

375

450

675

450

375

750

375

900

375

300

450

375 52

5

375

375

375

600

600

600

600

Non-P

ipe

525

375

375

Non-Pipe

375

450

1050

375

375

300

Non-Pipe

375

375

450

375

375

375

375

225

900

750

375

375

375

525

450

450

375

300

375

525

300

375

30037

5

375

375

450

450

375

375

375

300

600

450

375

375

750

450

375

375

375

375

750

300

Chur

ch St

reet

O'Co

nnell

Stree

t

Victoria Road

Trott S

treet

Wilde

Aven

ue

Grose Street

Marsd

en St

reet

Ross Street

Byrnes AvenueEli

zabe

th St

reet

Maris

t Plac

e

Phillip Street

Fennell Street

Market Street

Palmer Street

Harold Street

North

cott L

ane

Sorre

ll Stre

et

Villie

rs St

reet

Palmer Lane

Lamont Street

Edgewater Parade

Grose Street

Sorre

ll Stre

et

Ross Street

Grose Street

Ross Street

Fennell Street

Fennell Street

Byrne

s Ave

nue

Sorre

ll Stre

et

Sorre

ll Stre

et

Harold Street

9

11

10

12

13

14

8

15

7

166

17

18

19

20

5

43

1

21

22

0

2

2324

40

1976

1980

2004

1935

22

2012

2050

2219

2123

2227

26

2211

1177

1733

2537

922

2196

1021

13

910

2467

846

3149

3068.2

40

137

2250

2609

1137

3171.7

1173

2629

3135.1

1786.31805.5

1822.3

2652

1773.5

3097.2

1749.1

2701

2287.9

18

1887.8

1857.5

2358

.4

60

1728.6

3047.9

1699.9

1583

44.6

59

106.2

2146

141.8

2373

.323

87.8

45

2984.3

1961.7

2341

.9

2781

2323

.7

3478.6

141

104

3307.5

3402.7

3280.7

260

3252

3225.1

2012

0

0

0

4

0

1976

0

1

1

1

1

24

24

11

1

11-13

1C

340A340A

3

53

3

340A

20

1

8

353D

11-13

22A

21

17

2626

22A

18

1

11

27

1

39

1

24A

330

24A

330

2

50

2B

20A

5

11-13

13

26

30

35

8-10

11-13

375

7

14

22B

170

1212

5

464

12-14

15

1A

2

122A

40

30B

1

37

30B

2-6

11-13

351

17

338

350

426

2A

111

44

1

20B

2

11-13

34

50

2

24

2-6

410

24

1A174

2

8

2

46-48

30B

4

2

2D

40

25

11-13

11-13

419-423

15

3

13-15

2121

8

15

6

30B

181818

53

30B

7

51

2-6

11

6666

6

11

62

4

4150 8

29

2

7

354

30B

43

9

27

9 154747

47

4949

24

11-13

174

52

470

38

353A-353C

57

10-12

1

2A

24

42

39

332

37

44

51A

32

50

47

48

3

9

24

34

43

38

2

19

42

36

14-16

16

4

9

4352

5

9

3

55

1A

34

10

2-6

53

26

44

2-6

14

29

5-7

3535

45-47

11

29

320

5252

49

31

39-435-7

33

48

3510

6

13

1

42

23

2634

50

38

31

23

11-13

25

54

4036

431

2-6

6

27

11

5858 58

40

40A

33

47

44

54

17

332

13

31

340

32-36

370

14

28

3137 39

1

51

46

2A

24

33

26

56

25

24

46

448

6

31

19

20

50

29

23

58-60

54

52

4

42A

15

30

28 3037452

43

44

28

21

11-13

41

41

42

32

32

356

22

48

37

54

330

32

20

38-40

355

14

446

22A

50-52

10

30B

49-51

31

9

387

382

10

20

33

54

333

45-47

101

24

3C

2-6

36

17

12

30

389

8

32

14

5

51A

458

16

16 431

10

398

3

32

1B

12

19

12

12

4

9

295

22

404-406

440-444

4

385

27

33

2150

1A

1818

2

6

53

49

2

17

27

2-6

50A

20-2420-24

5

11-13

34A

338A338A

2-6

330

17

53A

44

17

46-48

21

11-1318

18

25

431

56

18

456

21-2321-23

2-6

18

42-46

2-6

18

2-6

20

330

454

22

8

20

17

338

9595

396

328

4

2-6

2-620

2-6

2-6

47A

47A

29

2-62-6

2-6

2-62-6

2-6

2-6

2-6

339

55A

30

311

29

4

28A 2A

330

5

366

18

431

431431

399397

295

395

16

66-68

11A

64

295

306

11A

9

30B 3

30A

40A

22-24

415

15

321

30B

315

11-13

18

407

325

30895

30B

172B

2-6

11-13

310

279

411

2-62-6

40A40A

439-441

60A

415

318

332317 323

327

316

2A

331

435RD

314

23

3292A

31295

22D

385

11C

395

281959595

291

95

293

370B

10A

295

2B

12

323

2R

1A378-380

20 20

44

443Z

64

20

30B

20

2020

21

20

30B

382Z

20C

55A

382A

64

9 476

11B

20C

24

3055.5

1794.61809.6

1923.71946.4

3023.3

2420

1709.5

3079.2

192.4

1691.71681.3

3169.53175.6

2949.8

78.6

105

780

200

1676

2871.3

108

2

2903.42927.2

1669.6

3209.5

578.8

2091

6973

3315.2

1748.3

3237.2

1723.4

2170

22

0

0

LegendGround Contours (metre AHD)Stormwater PitStormwater Pipe NetworkUpper Parramatta River Cross SectionHigh Hazard - 1% AEP (Upper Parramatta River)Low Hazard (Upper Parramatta River)

1:3,000

DISC

LAIM

ER: F

lood l

evels

and f

lood e

xtent

lines

are b

ased

on cu

rrent

inform

ation

held

by Co

uncil.

Coun

cil do

es no

t acce

pt res

pons

ibility

for t

he ac

curac

y of t

his In

forma

tion.

Any p

ipe si

zes

and l

ocati

on of

pits

and p

ipe lin

es sh

ould

be co

nfirm

ed by

site

inves

tigati

on.

The f

lood l

evels

prov

ided a

re on

ly an

appro

ximate

guide

and h

ave b

een d

erive

d usin

g the

curre

nt co

mpute

r sim

ulated

mod

el.

The i

nform

ation

prov

ided o

n this

docu

ment

is pre

sente

d in g

ood f

aith.

It is

the re

spon

sibilit

y of e

ach i

ndivid

ual u

sing t

his in

forma

tion t

o und

ertak

e the

ir own

chec

ks an

d con

firm th

is inf

ormati

on pr

ior to

its us

e. Cit

y of P

arram

atta C

ounc

il, its

agen

ts an

d emp

loyee

s are

not li

able

(whe

ther b

y rea

son o

f neg

ligen

ce, la

ck of

care

or oth

erwise

) to a

ny pe

rson f

or an

y dam

age o

r loss

whats

oeve

r whic

h has

oc

curre

d or m

ay oc

cur in

relat

ion to

that

perso

n tak

ing or

not t

aking

(as t

he ca

se m

ay be

) acti

on in

resp

ect o

f any

repre

senta

tion,

statem

ent,

or ad

vice r

eferre

d to a

bove

.

;N

Printed 3/07/2018

NOTE: The Upper Parramatta River Flood Study is currently being updated. Hydraulic hazard extents in this area may change.

Page 4 of 4

Page 8: Council’s flood map showing the subject property and the