counting bikes in madison, wi 2013 fall count procedure madison, wi sept 4 2013

38
Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Upload: cory-fletcher

Post on 25-Dec-2015

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Counting Bikes in Madison, WI

2013 Fall Count Procedure

Madison, WI Sept 4 2013

Page 2: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

What is NBPD?

• An on-going effort by private consultants with support from ITE

• Annual national bicycle and pedestrian count and survey effort

• Fulfills need for in-depth analysis of why people bike and walk

• Objectives– Consistent data collection – Open access data– Shared research

Page 3: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

3

• Lack of consistent data• Non-motorized modes lack funding• Minimal national data sharing• Analysis for other modes are based on marginal data yet receive substantive

funding

Need for NBPD

Page 4: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

4

NBPD Accomplishments

• Over 75 organizations and agencies have sent data

• Over 600 count locations• Extrapolation figures• Related projects: Caltrans Seamless

Travel• Publicly available support documents

including training presentations and count/survey forms

• www.bikepeddocumenation.org

Page 5: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Why Count?

• Evaluate need for new trails and trail upgrades• Evaluate community demand• Explain trail value to community, elected

officials, grant agencies• Justify resource allocation• Forecast demand• Support grant applications

Page 6: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Count Types

• Screenline Intersection

Count everyone who passes Count anyone who enters your intersection and note movement

Page 7: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Screenline and Intersection Counts

Screenline Counts• Volume on a corridor• Simpler, allows counters to

collect other info easily• Less training needed• Automatic counters can be

used

Intersection Counts• Volume• Approximate exposure• Turning movements• More complicated• Requires more training• Automatic counters can’t be

used

Page 8: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Quality Control

It is important to include quality control measures– Spot field checks – Review and verification of data within a day or

two of collection to identify discrepancies – Use of counters who care a lot about bicycle

and pedestrian issues has been shown to improve the accuracy of counts.

Page 9: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Forms• Intersection form• Screenline form• Forms available on

website

Page 10: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Data Input

Name

Location

Date

Time Period

Weather

Page 11: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Intersection Count Form

• Separate bicycle and pedestrian count forms

• Does not differentiate by gender

• Allows counters to collect turning movements

• 15-minute intervals• 2-hour period can be collected

on 1 sheet

Page 12: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Data Input: Intersection Count Form

15 minute intervals

Note movement through intersection

May use different symbols for bikes/peds

Or a symbol for sidewalk riding or road walking

Page 13: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Data Input: Intersection Crossing

Enter after field work

Total and summarize data for after the count and for input into the national database

Page 14: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Conducting Screenline Counts

Page 15: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Screenline Count

Count everyone who passes

Page 16: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Count Form

Page 17: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Data Input

Name

Location

Date

Time Period

Weather

Page 18: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Data Input By gender

15 minute intervals

People on Bicycles

Pedestrians - including wheelchairs

Others - skateboarders & rollerbladers

Anybody passing the screenline (from both directions)

Page 19: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Data Input

4 9

6 12

Page 20: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Returning Count Forms• Count forms collected by the sponsoring

agency• Enter data in spreadsheet available at:

www.bikepeddocumentation.org– NBPD updated the spreadsheets for the 2009

count effort• Send data sheets to

[email protected]

Page 21: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Subjects

Page 22: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 23: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

5!

Page 24: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 25: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

2!

Page 26: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 27: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

4!

Page 28: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 29: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Other!

Page 30: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

By the park.

Page 31: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 32: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

0!

Page 33: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 34: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

2!

How do you count this?

Page 35: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

Page 36: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

How do you count this?

2

Page 37: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Day of Count

• Be available to Abby via text, phone and social media

• Bring a hat• Bring some water• Bring extra pens or pencils• Wear comfortable shoes• Be ready to count!

Page 38: Counting Bikes in Madison, WI 2013 Fall Count Procedure Madison, WI Sept 4 2013

Questions?Thank you!

Ann Freiwald

[email protected]

www.bikepeddocumentation.org