COVID-19 Symposium:From Prevention to Control
Role of healthy drains in
the prevention of spread of
COVID-19
Speaker:
Sr. LAM Siu-kay, Junkers
Chief Building Surveyor,
Buildings Department, HKSARG
![Page 2: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/2.jpg)
ContentsA. Control under the Buildings Ordinance
B. Design of Drainage System
C. Lesson Learnt (The SARS in 2003, Amoy Gardens)
D. Special Inspection Scheme of Drainage Pipes
COVID-19 Symposium: From Prevention to Control 2
![Page 3: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/3.jpg)
A. Control under the Buildings Ordinance (BO)
COVID-19 Symposium: From Prevention to Control 3
• Public Library
• Markets
• Stadium
• Government offices
• Military Building
BD
Private Buildings*
Architectural Services Dept.
Government Buildings
Housing Dept.
Public Housing
Not Subject to BO
• Public Rental – fully exempted
* Independent Checking Unit under the Office of Permanent Secretary for Transport and Housing (Housing) has been delegated to exercise control to properties developed by the Hong Kong Housing Authority that have been sold or divested.
![Page 4: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/4.jpg)
4
Section 28(1) of Buildings Ordinance (Cap. 123)“All drainage works for any building shall, save as provided by regulations, be carried out by the owner of such building to the satisfaction of the Building Authority and in compliance with regulations.”
Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (Cap. 123I)
• Technical requirements
Main Objectives:• Health and hygiene
• Rain water / waste water / soil water discharged into government sewage system or treated properly and efficiently
• Prevent contamination / spread of smell
A. Control under the Buildings Ordinance (BO)
COVID-19 Symposium: From Prevention to Control
![Page 5: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/5.jpg)
5
Major design considerations
External wall of the building
Internal pipe duct accessible
from common parts
• Effective from 1.2.2021, new
‘Building (Construction) Regulation’
- access for external
maintenance
• Code of Practice on Design for
Safety – External Maintenance
• Practice Note for Authorized
Persons, Registered Structural
Engineers and Registered
Geotechnical Engineers (PNAP)
APP-93 for further details
Importance of access for
inspection, maintenance and repair
COVID-19 Symposium: From Prevention to Control
![Page 6: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/6.jpg)
6
Requirements for traps
Water seal and anti-syphonage air valve
Depth of water seal
U - Trap
Water Seal
Anti-syphonage
air valve
Bottle Trap
Anti-syphonage
air valve
COVID-19 Symposium: From Prevention to Control
![Page 7: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/7.jpg)
7
Water seal (min. depth and internal diameter)Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and
Latrines) Regulations 24 and 25
FitmentsDepth of Water
SealInternal Diameter
Soil fitments
(W.C. / Urinal)Not less than 50mm Not less than 80mm
Waste fitments
(Basin / Bath / Floor Drain)
Not less than 40mm /
80mm*Not less than 32mm
* For the waste fitment with the waste pipe connected to a soil pipe
COVID-19 Symposium: From Prevention to Control
![Page 8: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/8.jpg)
8
Provision of anti-syphonage pipesBuilding (Standards of Sanitary Fitments, Plumbing, Drainage Works and
Latrines) Regulation 30
COVID-19 Symposium: From Prevention to Control
Anti-syphonagepipeAnti-syphonage
pipe
![Page 9: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/9.jpg)
9
Provision of ventilating pipesBuilding (Standards of Sanitary Fitments, Plumbing, Drainage Works and
Latrines) Regulation – carried up to a height not less than 1m above the roof
COVID-19 Symposium: From Prevention to Control
![Page 10: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/10.jpg)
10
B. Design of Drainage System
Components
COVID-19 Symposium: From Prevention to Control
![Page 11: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/11.jpg)
11
1. Rain water pipesTo discharge rain water from main
roofs, flat roofs, balconies, etc.
collect and carry rain water only
should not be connected with
other pipes carrying soil and/or
waste water
COVID-19 Symposium: From Prevention to Control
Rain water
pipe
![Page 12: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/12.jpg)
12
2. Waste pipes
To discharge waste water from
lavatory basin, bath, shower tray,
floor drain, etc.
COVID-19 Symposium: From Prevention to Control
Waste pipe
![Page 13: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/13.jpg)
13
3. Soil pipe and anti-syphonage pipe
To discharge soil water from water
closet, urinal, etc.
COVID-19 Symposium: From Prevention to Control
Anti-syphonagepipe
Soil pipe
![Page 14: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/14.jpg)
14
4. TrapsBy keeping a water seal inside a trap to prevent smells, insects and bacteria
from the drainage system into the premises.
The trap will
only work as
long as the
water seal is
maintained.
COVID-19 Symposium: From Prevention to Control
![Page 15: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/15.jpg)
15
Types of trapsU-trap
Bottle trap
COVID-19 Symposium: From Prevention to Control
![Page 16: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/16.jpg)
16
C. Lesson learnt (The SARS in 2003)
淘大花園AMOY GARDENS
Probable explanations: Person-to-person contact
Use of shared communal facilities
Defective anti-syphonage pipe at
4/F of Block E
Sewage system – dried up U-traps
(loss of water seal)
(For more details, please see Main Findings
of the Investigation published by the
Department of Health in April 2003)COVID-19 Symposium: From Prevention to Control
![Page 17: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/17.jpg)
17
Reasons for loss of water seal
Evaporation
No usage for a long time without
feed-in water to the trap
Leakage
Broken / Defective trap
Self-syphonage
Partial vacuum formed when large amount
of water discharge (e.g. bath tub) flowing
in full-bore in branch pipe when there is no
anti-syphonage device
Syphonage
The suction effect caused by the negative
pressure induced by fast moving water
flow in the main down pipe when there is
no anti-syphonage device
COVID-19 Symposium: From Prevention to Control
![Page 18: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/18.jpg)
18
SyphonageCOVID-19 Sym - Role of healthy drains (vid-1).mp4(video-1)
COVID-19 Symposium: From Prevention to Control
![Page 19: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/19.jpg)
19
What if the water seal is lost ?COVID-19 Sym - Role of healthy drains (vid-2).mp4(video-2)
COVID-19 Symposium: From Prevention to Control
![Page 20: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/20.jpg)
20
New / Revised Practice Notes for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers (PNAP) issued after 2003
APP-13 – Submission of Certificate of Completion of Building Works, Application for Occupation Permit and Submission of Record Plans and Information
APP-93 – Planning and Design of Drainage Works
APP-133 – Cast Iron Pipes for Drainage Works
ADV-14 – Facilities for External Inspection and Maintenance of Buildings
ADV-24 – Floor Drains in Kitchens and Bathrooms
Minor Works Control System
To facilitate building owners and occupants to carry out aboveground drainage
works.COVID-19 Symposium: From Prevention to Control
![Page 21: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/21.jpg)
21
Prevention is better than cure
Under Anti-epidemic Fund
To proactively inspect the external drainage pipes (from June 2020)
Aims:• To promote environmental hygiene
• To create job opportunities
Scope of inspection:• 20,000 private domestic and composite buildings (except 3-storey or less)
• External drainage pipes
D. Special Inspection Scheme of Drainage Pipes
COVID-19 Symposium: From Prevention to Control
![Page 22: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/22.jpg)
22
Common problems
Lack of maintenance and repair
Improper (unauthorised) alteration of drainage system
Misconnection of drainage pipes
COVID-19 Symposium: From Prevention to Control
![Page 23: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/23.jpg)
23
Drainage Repair Orderunder Section 28 of Buildings Ordinance
COVID-19 Symposium: From Prevention to Control
![Page 24: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/24.jpg)
24
Owner’s responsibility
COVID-19 Symposium: From Prevention to Control
![Page 25: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/25.jpg)
25
小型工程監管制度Minor Works
Control System
Commenced on 31.12.2010
To facilitate building owners
and occupants to carry out
small-scale building works
safely and lawfully through
simplified requirements
BD’s site audit checks
COVID-19 Symposium: From Prevention to Control
![Page 26: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/26.jpg)
26
• Not involving main pipes, other
than the replacement of
components at existing junctions
• Not involving embedded pipes,
other than through a wall or slab
Minor works items - aboveground drainage system
COVID-19 Symposium: From Prevention to Control
Stepped-up audit checks of
completed minor works for
aboveground drainage system
![Page 27: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/27.jpg)
27
Mobile App
COVID-19 Symposium: From Prevention to Control
![Page 28: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/28.jpg)
28
搜尋註冊專業人士或承建商Registered Professionals or
Contractors
https://bit.ly/2PXanVM
COVID-19 Symposium: From Prevention to Control
![Page 29: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/29.jpg)
29
財政資助Financial
Assistance
https://bit.ly/2DSQ3lLCOVID-19 Symposium: From Prevention to Control
![Page 30: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/30.jpg)
30
https://bit.ly/320Uh2F
Public Education and Publicity
COVID-19 Sym - Role of healthy drains (vid-3).mp4
(video-3)
COVID-19 Symposium: From Prevention to Control
![Page 31: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/31.jpg)
31
預防勝於治療
PREVENTION IS
BETTER THAN CURE
定期檢驗 防患未然REGULAR INSPECTION AND PREVENTIVE
MAINTENANCE FOR YOUR SAFETY
COVID-19 Symposium: From Prevention to Control
![Page 32: COVID-19 Symposium: From Prevention to Control](https://reader031.vdocuments.net/reader031/viewer/2022011801/61d30906442ef6474b5952fa/html5/thumbnails/32.jpg)
32
電話 P H ONE N UMBER
(852) 2626 1616
網站 W E BSI TE
www.bd.gov.hk
聯絡我們C O N T A C T U S
電郵 EM AIL AD DRESS
F A C EBOOK
屋宇署 Buildings Department
I N S TAGRAM
buildingsdepartment
謝謝Thank you
COVID-19 Symposium: From Prevention to Control