29 th March 2012 Yeo Kim Hock Code of Practice on Safe Lifting Operations at Workplaces LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT Formulating a Lifting Plan Fundamental Contents- Key Factors of a Lifting Plan Introduction-Objectives of Lifting Plan/ PTW/ RA Review of the Lifting Plan Conclusion Objectives of a Lifting Plan Facilitate common understanding amongst the lifting crews Conduct Risk Assessment Eliminate Risks Mitigate Risks PTW LP Safe Outcomes & Compliance to Regulations Fundamental Contents Key Factors of a Lifting Plan Detail of the Load Detail of the Lifting Equipment Means of Communication Personnel Involved in the lifting operation Physical & Environmental Considerations Not nec essary in sequenc e Description of the load/s Load Configurations Overall dimensions Weight Centre of Gravity. Type of Lifting Equipment Maxi SWL Max boom/Jib length Intended Load Radius Visual-Standard Hand Signal Audio-Radio Within sight and view of load and all personnel Lifting Supervisor Crane Operator Rigger Signalman Site Supervisor/ others Acronym ‘GOLDEN’ Fundamental Contents Key Factors of a Lifting Plan Other Considerations based on the 5M Model Critical Document and Information Method of Rigging Not nec essary in sequenc e Machine Material Medium Man Method Load Capacity Chart/ Range Diagram Operations Manual/ Logbook Appointment of Competent Personnel Valid Test Certificate Checklists Choker Hitch Basket Hitch Direct Rigging Sling Angle Sequence/ Special Precautions Sketch of the Lifting Zone Public Safety/ Tandem Ops Initial and Final location of the load Path of the load Load Radius Obstructions Type of LGs Chain Sling Fibre Sling Wire Sling General Formulating a Lifting Plan

Upload: mohan-prasad

Post on 10-Dec-2015

14 views

Category:

Documents


0 download

DESCRIPTION

Workplace-Lifting Plan_6 Slides Per

TRANSCRIPT

29th March 2012

Yeo Kim Hock

Code of Practice

on Safe Lifting Operations at Workplaces

LIFTING PLAN

PERMIT TO WORKRISK ASSESSMENT

Formulating a Lifting Plan

Fundamental Contents- Key Factors of a Lifting Plan

Introduction-Objectives of Lifting Plan/ PTW/ RA

Review of the Lifting Plan

Conclusion

Objectives of a Lifting Plan

Facilitate common

understanding

amongst the lifting

crews

•Conduct Risk Assessment

•Eliminate Risks

•Mitigate Risks

•PTW

•LP

Safe Outcomes

&

Compliance to

Regulations

Fundamental ContentsKey Factors of a Lifting Plan

Detail of the Load

Detail of the Lifting

Equipment

Means of Communication

Personnel Involved in the

lifting operation

Physical & Environmental Considerations

Not necessary

in s

equence

Description of the load/sLoad ConfigurationsOverall dimensionsWeightCentre of Gravity.

Type of Lifting EquipmentMaxi SWLMax boom/Jib lengthIntended Load Radius

Visual-Standard Hand SignalAudio-RadioWithin sight and view of load and all personnel

Lifting SupervisorCrane OperatorRiggerSignalmanSite Supervisor/ others

Acronym‘GOLDEN’

Fundamental ContentsKey Factors of a Lifting Plan

OtherConsiderations based on the 5M

Model

Critical Document and

Information

Method of Rigging

Not necessary

in s

equence

MachineMaterialMediumManMethod

Load Capacity Chart/ Range DiagramOperations Manual/ LogbookAppointment of Competent PersonnelValid Test CertificateChecklists

Choker HitchBasket HitchDirect RiggingSling Angle

Sequence/ Special

Precautions

Sketch of the Lifting Zone

Public Safety/ Tandem Ops

Initial and Final location of the loadPath of the loadLoad RadiusObstructions

Type of LGs

Chain SlingFibre SlingWire Sling

General

Formulating a Lifting Plan

Formulating a Lifting Plan- General

1

Detail of the Load/s

Formulating a Lifting Plan

Formulating a Lifting Plan- Detail of the load/s

Formulating a Lifting Plan - Detail of the load/s

3

Detail of the Lifting

Equipment/ Lifting Gears

Formulating a Lifting Plan

Formulating a Lifting Plan - Detail of the Lifting Equipment

Formulating a Lifting Plan- Detail of the Lifting Equipment

4

Means of

Communications

Formulating a Lifting Plan

5

Personnel Involved in the

Lifting Operation

Formulating a Lifting Plan

Formulating a Lifting Plan- Lifting Personnel

6

Physical & Environmental

Considerations

Formulating a Lifting Plan

Formulating a Lifting Plan – Physical & Env Considerations

� Stability of Crane (Tipping Stability)

� Structural Stability

� Integrity of Lifting Gear/ Safety Devices

� ‘‘‘‘GOLDEN’’’’

7

Sequence and Special

Precautions

• Public Safety

•Tandem Lift

Formulating a Lifting Plan

Formulating a Lifting Plan-Sequence and Special Precautions

8

Sketch of the Zone of

Operation

Formulating a Lifting Plan

Formulating a Lifting Plan -Sketch of Ops Zone

Formulating a Lifting Plan-Sketch of Ops Zone

Formulating a Lifting Plan- Sketch of Ops Zone

Lifting PlanPTWRA

Lifting PlanPTWRA

Lifting PlanPTWRA

Checklists

Review of the Lifting Plan

•Changes to Lifting Plans

�Changes to the type and capacity of lifting equipment used.

�Changes to the sequence of operations.

�Changes requiring reconfiguration of the crane (boom/jib length, outrigger beam length reduction, parts of hoist line, etc).

�Changes in the rigging details which could result in a reduction in rigging strength or significant increase in rigging weight.

�Changes in surrounding environment such as sudden presence of a temporary structure obstructing the operation.

�Changes in the weather and environmental conditions which have an adverse impact to the lifting operation.

�Changes to safety-critical personnel.

In conclusion

Make Every Lifting Operations

SAFE

Thank You