Sierra Readymix (Pvt.) Ltd.

CP, Productivity, EMSIntegrated Strategy for

Sustainability (SISS)

All About how we plan for our Children

Director / General Manager

Sierra Readymix (Pvt.) Ltd.

Page 2: CP Presentation DGM

8/8/2019 CP Presentation DGM

http://slidepdf.com/reader/full/cp-presentation-dgm 2/7

Against All Odds

Slump in construction industry in Western Province

Rapidly increasing Material Costs

Incremented overheads

Shrinking Gross Profit

Training, Job Enrichment was never compromised

CP workgroup committed with limited resources

With an ambitious Work plan

Understanding CP is not about a Award or monitory gain BUTCorporate & Individual Obligation for our Future Generation

Against All odds SRL TEAM committed to contribute IN OUR OWNSIMPLE WAYS though we do not maintain paper indications.

Page 3: CP Presentation DGM

8/8/2019 CP Presentation DGM

http://slidepdf.com/reader/full/cp-presentation-dgm 3/7

SRL GO GREEN INITIATIVE

ExternalStakeholders &

Community

Company

Departmental

CEA & Legal Compliance Supply Chain

Environmental footprint

Eco-Friendly CSR

Environmental Policy

Environmental footprint

reduction

Waste Minimization Waste Utilization

Reduction of 

Consumption

Page 4: CP Presentation DGM

8/8/2019 CP Presentation DGM

http://slidepdf.com/reader/full/cp-presentation-dgm 4/7

ROADMAP Short Term

1 paper - 2 sides concept

Employees Switch off Consciousness

Natural Light Utilization

Vehicle washing, water tank filling to be monitored by flow meters

Separate electricity meters to be installed to workshop, batching plant,

pre casting yard

Electronic Mail based communication system within internal end external

parties

Hard copied Documents backed up in electronic format instead of paper

based archive

Page 5: CP Presentation DGM

8/8/2019 CP Presentation DGM

http://slidepdf.com/reader/full/cp-presentation-dgm 5/7

ROADMAP Long Term

By 2011 July SRL is committed to be in position to bid for ISO 14001 EMS

certification

Improve facility for rainwater harvesting by 50% by 2012

Expand facility for Down cycled water storing

Weigh bridge to be installed for better mapping of material inflow.

Provision of IT facilities to all departments to ensure tertiary level data input

also made in electronic format.

Pursuing Green Globe requirements only as a measure of improving EMSstandards.

By 2015 modifying office building using natural lighting only

Page 6: CP Presentation DGM

8/8/2019 CP Presentation DGM

http://slidepdf.com/reader/full/cp-presentation-dgm 6/7

Our Unquantified Unrecorded Commitment

which you will not find in Black & White Unaccounted 7 Acre Company maintained Sierra Green Reserve at

Kaduwela maintained with the vision to offset production related

Carbon Foot Print.

Eco-CSR aimed at renewable energy generation, reuse, recycle andknowledge dissemination.

1 Paper-2 sides, switch off consciousness, Check & Print etc.

Inherent by SRL TEAM & families.

No Need to Waste & Nothing is Waste mentality Inherent by ourworkforce

Top to Bottom Commitment as simple tasks for The Bigger Picture

Page 7: CP Presentation DGM

8/8/2019 CP Presentation DGM

http://slidepdf.com/reader/full/cp-presentation-dgm 7/7

In a Nutshell it is

All About how we plan for our Children