cpo 7 traffic control changes may 4 th, 2009 washington county land use and transportation tom...
Post on 21-Dec-2015
215 views
TRANSCRIPT
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
CPO 7
Traffic Control Changes:
Updates and Explanations
May 4, 2009
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Traffic Section
• Areas of Responsibility– Traffic Analysis – Traffic Design– Traffic Operations
• Signals• Signing• Striping• Illumination
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Background - Budget
• Budget• Funding Sources
– Road Fund– MSTIP/MTIP/TIF - SB 994– Private Development– ARRA (American Recovery and
Reinvestment Act of 2009)
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
ARRA Project Requirements
• Economic Stimulus Parameters• “Shovel Ready” projects• Environmental Impacts• Project Size• Jobs Bill• Time Lines for Delivery
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Traffic Projects
• Projects Moving Forward– School Zone Flashers– Flashing Yellow Arrow (FYA)– Interior Illuminated Signs– Traffic Signal Retiming– Transport Regional Arterial Improvement Project
• ITS Corridors – Scholls Ferry Road, Cornell Road and 185th Avenue
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Traffic Projects
• Back-Fill Projects– Emergency Vehicle Preemption– Pedestrian Count Down Head Replacement
• Fail-Safe Project– Video Detection
• Other Considered Projects– Recessed Pavement Marker– Retroreflective Sign Replacement
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
School Zone Flashers
• 15 locations being considered
• Estimate - $250,000
• Solar Powered
• Pager Activated
• Environmental Concerns
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
FYA/Interior Illuminated Signs
• Combined Projects
• 190 intersections retrofit with FYA
• 240 interior illuminated signs
• Estimate - $650,000
• Environmental Concern/Benefits, $20,000 annual savings
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Flashing Yellow Arrow
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Traffic Signal Retiming
• Approximately 170 intersections
• Focus on corridors
• Estimate - $600,000
• Environmental Benefits
• Minor CIP – Communications, wireless
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Transport Regional Arterial Improvement Project
• ODOT/Metro• Coordination of six jurisdictions• Estimate - $4,288,000
– $475,000 for County owned system– $875,000 for ODOT and cities within County
• Washington County– 3 corridors – Scholls Ferry, 185th and Cornell– Approximately 50 intersections on Washington County system,
another 70 intersections within Washington County
• Scope – Controllers, cabinets, communications, retiming
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Emergency Vehicle Preemption
• Previous work• Completes County system• Impacts approximately 1/3 of the County
signals, 66 intersections• Minor environmental benefit• Safety benefit• Estimate - $320,000
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Pedestrian Count Down Head Replacement
• Approximately 200 intersections, 1,500 pedestrian heads
• Estimate - $740,000
• MUTCD requirement
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Video Detection
• Fail-Safe
• Flexible Size, fit to available funds
• Current Program – 42 intersections
• ITS relationship
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Recessed Pavement Markers
• Estimate - $500,000
• Snowstorm damage/advantages
• Environmental concerns
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Retroreflective Sign Replacement
• 14,000 SF, 1,300 miles of road, 1,400 signs
• MUTCD Requirement
• Estimate - $246,000
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Kaiser at Bethany/Kaiser at Laidlaw
• TIF Projects
• Signalization– FYA (N/S only at Laidlaw, Sight Distance
issue)– Right Turn Overlaps– Ped Count Down Signals
CPO 7Traffic Control ChangesMay 4th, 2009
Washington County Land Use and Transportation
Tom Tushner
Questions