cps - faster from the start
TRANSCRIPT
FASTER FROM THE START
VICTAULIC®
CONSTRUCTIONPIPING SERVICESDRAWING, BIM COORDINATION AND SOFTWARE SOLUTIONS FOR THE COMMERCIAL, INDUSTRIAL AND PIPELINE CONSTRUCTION BUSINESS
VICTAULIC® CONSTRUCTION PIPING SERVICESOFFERING FIRST CLASS DRAWING SERVICES FOR OVER 30 YEARS
MB-105 REV C
World Class Partnership More Than a Manufacturer
Since 1919, Victaulic has delivered innovative mechanical pipe joining solutions that help customers succeed worldwide. Look inside many of the world’s most recognizable landmarks, and you’ll find Victaulic products at work making bold design innovations possible and speeding time to completion.
Lean on Victaulic for a full range of capabilities from drawings and Building Information Modeling (BIM) through to prefabrication and installation. No matter your design challenge, Victaulic can help you mitigate risk while navigating today’s toughest standards and delivering high performance building systems.
victauliccps.com 1 MB-105 REV C
Construction Piping Services (CPS)
Dependable and Trusted Drawing and BIM Service Provider
• With over 30 years of experience on more than 1500 projects, our global team can maximize project efficiency by cutting overall costs and condensing construction schedules
• Our drawing team is proficient in Revit™ and full BIM Coordination, offering you a dedicated team from project conception to construction
• Over 700 years of collective drawing experience
• Accuracy of all construction ready drawings to 1⁄16" | 1 ½ mm
• Transparent costs including weekly project schedule updates, and flat or per diem rates, to fit the needs of your piping coordination plan
“THE SERVICES I RECEIVED FROM THE VICTAULIC CONSTRUCTION PIPING SERVICES TEAM WERE EXTREMELY PROFESSIONAL, ACCURATE, AND USER FRIENDLY. THE SCOPE OF WORK WAS EXACTLY AS REQUESTED AND MADE FABRICATION AND SHIPPING VERY EFFICIENT. THE SCHEDULE EXCEEDED THE OWNERS REQUIREMENTS.”Jim Moeller, Division Manager Quality Plus Services
FROM CONSTRUCTION PIPING SERVICES
Victaulic is your drawing partner at any stage of the project life cycle.
Our piping coordinators can work with your team offering advice on
best practices and solutions at any point in your construction schedule.
PACKAGES AND SERVICES
COM
MIS
SION
ING
CONS
TRUC
TION
PRE-
CONS
TRUC
TION
BID/
AWAR
D
DESI
GN E
NGIN
EERI
NG
PREF
ABRI
CATI
ON
• Project Kickoff Meeting• Introduction of Dedicated Project Team
• BIM Coordination• Drawing Packages• Coordination Meetings• Clash Detection
• As Is 3D Models• Drawing Services
• Tagged Isometric Drawings with Cut Lengths• Fabrication Spool Drawings• Fabrication Loading Plans
• As-Builts
• Bag and Tag• Coordinated Shipments
2 MB-105 REV C
Standard Drawing PackagesIncluding Autodesk™ 3D Revit™ or AutoCAD™ drafting for presentation purposes. These models can also be utilized to offer you a head start on construction drawings. See pg. 4 for more information.
Coordinated Drawing PackagesOffering every level of coordination, from basic drafting services to full BIM coordination packages. Every service can be customized to fit your individual project needs. See pg. 6 for more information.
victauliccps.com 3 MB-105 REV C
Construction Piping Services (CPS)
CAD FILES AND SOFTWAREAvoid design delays and errors. Victaulic offers an extensive library of CAD files and software product content created in each software’s native content.
Commercial / BIM Software• Autodesk™ – CADmep™ Imperial Content• Autodesk™ – CADmep™ Metric Content• Autodesk™ – Revit™ MEP• EastCoast CAD™ – AutoCAD™ MEP Piping• MagiCAD™ – MagiCAD™ for AutoCAD™
and Revit™ (Europe)• QuickPen™ – PipeDesigner 3D• Stabiplan™ – StabiCAD (Europe)• TSI Building Data™
Industrial / Plant Design• Autodesk™ – Plant 3D• Aveva™ – PDMS• Bentley™ – AutoPLANT• Bentley™ – PlantSpace• CEA Technologies™ – Plant 4D• Intergraph™ – CADWorx Plant• Intergraph™ – PDS• Intergraph™ – SmartPlant
Mechanical Design • Autodesk™ – Inventor• Dessault™ – Solidworks
Fire Protection• Hydratec™ – HydraCAD• Victaulic Fire Protection Details
Ship Design• FloMatic™ CADMatic 3D Shipbuilding
Victaulic Specified Applications• Victaulic 2D Koil Kits• Victaulic 3D Koil Kits• Victaulic 3D Piping Application• Victaulic Blocks 2D• Victaulic Blocks 3D• Victaulic Data Files• Victaulic ISO Symbols• Victaulic Step Files• Virtual Truck Loading Software
ADDITIONAL SERVICESTo increase productivity and save time on your project, Victaulic offers additional services to best suit your project needs. See pg. 10 for more information.
STANDARD DRAWING PACKAGES
4 MB-105 REV C
• Offered early in project life cycle• You have the ability to receive a 3D model walk through of your bid or contract documents• Experienced Victaulic Coordinators can offer their assumptions and recommendations
for your internal drawing team• Detailing and modeling packages available
Eric14 Years Experience
victauliccps.com 5 MB-105 REV C
Construction Piping Services (CPS)
Internal drafting team overloaded?
Victaulic is your off-loading solution. Our drawing team can offer modeling, coordination and drafting services at a fixed hourly rate to continue moving your business forward. Deliverables will be provided in your native software, with the detailing you request.
UP
12
1224
12
1224
N.5
N
P
M.6
M
52 53 54 55
8'-6
15/1
6"0"
2' - 7"
5'-5
1/16
"
2' - 7"
8'-4
"
2' - 9"
10" HWR
4" HWSCL:11' - 6"
10" HWRCL:10' - 6"
1'-6
"
10" HWRCL:10' - 6"
4" HWSCL:9' - 0"4" HWR
CL:9' - 0" (TYP)(TYP)
6" HWSCL:11' - 6"
8" HWSCL:11' - 6"
111/
2"
(TYP
)1'
-61/
16"
3'-0
1/16
"(T
YP)
45°
10" HWRCL:10' - 6"
8" HWSCL:11' - 6"
16' - 4 1/8"1' - 6"
10" HWSCL:11' - 6"10" HWS
CL:4' - 9 1/2"
10" HWSCL:11' - 6"
10" HWSCL:4' - 9 17/32"
3'-1
7/8"10" HWS
CL:11' - 6"
10" HWSCL:11' - 6"
HWB-4 HWB-3HWB-5HWB-6
HWB-7
HWB-8
HWB-9
HW
P-1
HW
P-2
HW
P-3
HW
P-4
HWB-12
HWB-11
HWB-10
ET-6ET-5
UP THRU FLOOR10" HWS
UP THRU FLOOR10" HWR
45°
45°
45°
45° 45°
H29H22H17H11H4
H2
H5 H10H15 H20
H21
H18
H16
H13
H12
H8H7
H3
H1
H6 H9 H14 H19
H25
H32
H43
H39
H24
H23
H26
H28 H48
H51
H52
H27
H30H36
H41
H46
H31
H33
H37
H42
H38
H44
H47
H35
H34 H40
H45
H49
H50
H53
H54
SCALE:
PROJ.#:
P.O.#:
DRN. BY:
CHK. BY:
DATE:
DATE:
AREA #:LEVEL:
REV.
All Victaulic drawings and piping engineer ing submittals will be based on information furnished to us and is provided solely as an aidto procurement and installation. The Victaulic Company is not responsible for design by engineer of record, erection, or operation. Liability ofVictaulic Company with reference to descriptions, lengths, locations, dimensions, or any other data shown herein is l imited to the amountcharged by Victaulic Company for producing the drawing in question. In the event of an order , Victaulic products must be used in accordancewith published specifications and Victaulic literature.
NOTE: Contractor to field ver ify all equipment configurations, nozzle locating dimensions and elevations for conformance to Victauliclayout drawing(s) PRIOR TO CUTTING PIPE. Please notify Victaulic Construction Piping Services Division for recommendations regardingany deviations.
CONSTRUCTION PIPING SERVICES
AREA:
REF DWG:
LEVEL-DRAWING TYPE-SEQUENCE
SHEET:
1/4" = 1'-0"
5/12
/201
48:
44:2
5A
M
13-3837
00000000-0000
Author
Checker
01-SK-1B
PIPING LAYOUT
Mechanical Contractor
Project Name
REV REVISION DESCRIPTION BY DATE
NTRUE NORTH
NPLAN NORTH
70 H
AW
ES
WA
Y S
TOU
GH
TON
, MA
020
72
Ph:
(781
) 341
-150
0 F
ax: (
781)
344
-244
5
An
EM
CO
R C
om
pan
y
J.C
.HIG
GIN
S
Drawing packages to fit your condensed construction schedules If you need a quick turnaround, the Victaulic Construction Piping Services team is your solution. Utilizing your contract drawings and specifications, our experienced drawing team can create a 3D model of your building or project with necessary clearance spaces for walkways and maintenance. From large rooms to condensed spaces, Construction Piping Services has the skills and expertise to help prepare you for your first coordination meeting.
The Construction Piping Services team can also provide construction ready drawings, bills of material and material coordination, along with fabrication spool drawings and isometric or shop drawings to fit your construction plan. Whether we use field verification or our best practices, the Construction Piping Services team can lay out and coordinate your piping system efficiently and tailor our services to best fit your needs.
Mechanical Room layouts are provided along will 3D models in the software of your choice.
BIM COORDINATION
6 MB-105 REV C
Victaulic offers a dedicated and experienced project team to participate
in all levels of your BIM construction project. Your personal Victaulic
Coordination Team will attend all of your coordination meetings,
sharing schedules and status updates each week.
Our BIM Services will help to condense your project schedule • Detecting clashes and spatial issues during planning phases • Allowing all trades to coordinate prior to construction • Ensuring change orders or requests for information occur early in the planning process
Andrea7 Years Experience
Matt18 Years Experience
Scott14 Years Experience
victauliccps.com 7 MB-105 REV C
Construction Piping Services (CPS)
Customized models and drawings to match your BIM Execution Plan With the use of advanced BIM Coordination techniques and Revit™ software expertise, you can depend on Victaulic Construction Piping Services to successfully model even your most complicated construction project. Victaulic will participate in coordination meetings and follow your BIM Execution and Level of Detail requirements. Our deliverables can be customized to fit your construction and material management schedule. From project conception to completion, your personal Victaulic Coordination Team will be by your side.
Through our participation in BIM coordination meetings, the Victaulic team will provide tried and trusted solutions to clashes throughout the planning process.
“I AM HAPPY TO SAY THAT WE BUILT THE ENTIRE PLANT IN TEN WORKING DAYS WITH A THREE MAN CREW AND NO CUTTING OF ANY PIPE OR SPOOLS. THIS IS AMAZING, TWO CHILLERS, SEVEN PUMPS, A HEAT EXCHANGER AND ALL ASSOCIATED TRIM AND ALL OPENINGS WENT IN BETTER THAN ANY PLANT I HAVE EVER BUILT, AND PROVES ONCE AGAIN THAT A TEAM EFFORT AND PRE- PLANNING MAKES ALL THE DIFFERENCE IN THE WORLD. I WOULD JUMP AT THE CHANCE TO UTILIZE MY CPS COORDINATOR’S SKILLS AND PROFESSIONAL WORKMANSHIP ON ANY OF MY FUTURE PROJECTS.”Corey Housworth, Pipe Fitter General Foreman Mckenney's Inc
Philip – Victaulic Europe15 Years Experience
Partner with Victaulic for your training needsOur global coordinators are available to train your internal drawing teams on software and BIM best practices. Custom packages available today.
BIM COORDINATIONPPL CENTER ALLENTOWN, PENNSYLVANIA, USA
8 MB-105 REV C
9 MB-105 REV Cvictauliccps.com
“VICTAULIC CONSTRUCTION PIPING SERVICES ALLOWED US TO WORK MULTIPLE AREAS OF THE PROJECT SIMULTANEOUSLY. THEY WERE PROMPT AND ADJUSTED WELL TO AN EVER-CHANGING WORKFLOW.
I WOULD USE THEM AGAIN.”Rich F. Reznicek, Senior Project Manager HT Lyons
Actual Revit™ model created for the PPL Center in Allentown, Pennsylvania
ADDITIONAL SERVICES
10 MB-105 REV C
Prefabrication utilizing Victaulic fittings allows you to optimize your fabrication shipments based upon sequence of assembly or maximum allowable weight.
Advanced Bills of Material available for all jobs.
To increase the productivity and time savings on your project, Victaulic offers additional services to best suit your project needs.
Limit any delays due to product back order or delivery through the use of the Victaulic Material Management Services.
victauliccps.com 11 MB-105 REV C
Construction Piping Services (CPS)
Fab Spool Maps and Custom Isometric Drawings are available upon request to match your installation plan. We will work to tailor our services to your business.
The Victaulic Bag and Tag Service ships product directly from one of our global warehouses to your fabrication shop or jobsite labeled and packaged per your request.
Your Victaulic Project Team is available throughout the course of construction to assist with As-Built Drawings upon completion of installation.
“WE USED CPS TO SET UP THE BILLS OF MATERIAL AND DO BAGGING AND TAGGING AND GAVE THEM OUR DRAWINGS TO SECTION OFF THE JOB. IT’S THE FIRST TIME WE’VE USED THAT SYSTEM AND OVERALL IT WAS VERY SUCCESSFUL. IT’S DEFINITELY A SYSTEM WE’D WANT TO USE AGAIN AS IT GIVES US MORE COST CERTAINTY.” Bill Teasdale, Contracts Director Briggs & Forrester
12 MB-105 REV C
Construction Piping Services (CPS)
Deliverables:
As Is Model
Client Supplied 2D or 3D
Model Conversion
Dimensioned Field
Verification
3D
Coordinated
BIM 3D
CoordinatedSTANDARD DRAWING PACKAGES COORDINATION DRAWING PACKAGES
Project Kickoff Meeting • • • • •3D Model • • • • •Clash Detection • • • • •Bills of Material • • • • •Complete Piping Model in Revit™ or CADmep™ • • • • •Dedicated Project Team or Direct Contact • • • • •Utilization of Client’s FTP Site for Up-to-date File Transfer • • • • •Material Coordination • • • •Construction Ready Drawings • • • •Prefabrication or Field Fabrication Drawings • • • •Feedback From Client Mark Up’s Required • • •Shop Drawings • • •Customized Models and Drawings Following Clients BIM Execution Plan or Internal CAD Modeling Standards • •Maximized Pre-construction Timeline • •Participation in Client’s BIM Coordination Meetings •Proof of BIM Compliance Upon Job Completion •3D Model is Industry Foundation Class (IFC) Compliant •
Optional Deliverables:Tagged Isometric Drawings with Cut Lengths • • • •Fab Spool Drawings with Fab Spool Maps • • • •Hanger Point Models and Hanger Layout Drawings • • • •Fabrication Loading Plans • • • •As-Builts • • • •Penetration/Sleeve Drawings • •
STANDARD DRAWING PACKAGES
CPS CAPABILITIES
victauliccps.com 13 MB-105 REV C
Deliverables:
As Is Model
Client Supplied 2D or 3D
Model Conversion
Dimensioned Field
Verification
3D
Coordinated
BIM 3D
CoordinatedSTANDARD DRAWING PACKAGES COORDINATION DRAWING PACKAGES
Project Kickoff Meeting • • • • •3D Model • • • • •Clash Detection • • • • •Bills of Material • • • • •Complete Piping Model in Revit™ or CADmep™ • • • • •Dedicated Project Team or Direct Contact • • • • •Utilization of Client’s FTP Site for Up-to-date File Transfer • • • • •Material Coordination • • • •Construction Ready Drawings • • • •Prefabrication or Field Fabrication Drawings • • • •Feedback From Client Mark Up’s Required • • •Shop Drawings • • •Customized Models and Drawings Following Clients BIM Execution Plan or Internal CAD Modeling Standards • •Maximized Pre-construction Timeline • •Participation in Client’s BIM Coordination Meetings •Proof of BIM Compliance Upon Job Completion •3D Model is Industry Foundation Class (IFC) Compliant •
Optional Deliverables:Tagged Isometric Drawings with Cut Lengths • • • •Fab Spool Drawings with Fab Spool Maps • • • •Hanger Point Models and Hanger Layout Drawings • • • •Fabrication Loading Plans • • • •As-Builts • • • •Penetration/Sleeve Drawings • •
STANDARD DRAWING PACKAGES COORDINATION DRAWING PACKAGES
VICTAULIC CONSTRUCTION PIPING SERVICES WORLDWIDE
UNITED STATES
4901 Kesslersville Road Easton, PA 18040 USA
610 923 3836
CANADA
123 Newkirk Road Richmond Hill, ON L4C 3G5
905 884 7444
EUROPE
Prijkelstraat 36 9810 Nazareth, Belgium
32 9 381 15 30
ASIA PACIFIC
Unit 808, Building B Hongwell Plaza No.1602 West Zhongshan Road Shanghai, China
86 21 6021 9400
VICTAULIC® CONSTRUCTION PIPING SERVICES
victauliccps.com
MB-105 8200 REV C 11/2014Victaulic and all other Victaulic marks are the trademarks or registered trademarks of Victaulic Company, and/or its affiliated entities, in the U.S. and/or other countries. All other trademarks listed herein are the property of their respective holders, in the U.S. and/or other countries. The terms “Patented” or “Patent Pending” refer to design or utility patents or patent applications for articles and/or methods of use in the United States and/or other countries.
© 2014 VICTAULIC COMPANY. ALL RIGHTS RESERVED.