cpsf el det 1 0655-06-00_reva1 electrical installation diagram
DESCRIPTION
Electrical installation diagramTRANSCRIPT
-
CABLE TRAY FIXING (TYP.)
LCS
FOR LCS MOUNTING
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
CABLE TRAY
LCS
A
LCS
CABLE TRAY
REQUIRED QTY.
2 Nos.
DETAIL-``C"
FOR EARTHING
PLATE 100x50x6mm THK.
(TYP.)
TOP OF SKID STRUCTURE
DETAIL-``C"
-
CABLE TRAY FIXING (TYP.)
FOR LCS MOUNTING
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
CABLE TRAY
LCS
A
LCS
CABLE TRAY
REQUIRED QTY.
1 No.
DETAIL-``C"
FOR EARTHING
PLATE 100x50x6mm THK.
(TYP.)
FGL
LCS
FGL
DETAIL-``C"
-
CABLE TRAY FIXING (TYP.)
MLJB
FOR LCS MOUNTING
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
CABLE TRAY
MLJB
ACABLE TRAY
REQUIRED QTY.
3No.
DETAIL-``C"
FOR EARTHING
PLATE 100x50x6mm THK.
(TYP.)
TOP OF SKID STRUCTURE
EMLJB
DETAIL-``C"
-
CABLE TRAY FIXING (TYP.)
FOR LCS MOUNTING
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
MLJB
ACABLE TRAY
REQUIRED QTY.
1 No.
DETAIL-``C"
FOR EARTHING
PLATE 100x50x6mm THK.
(TYP.)
TOP OF SKID STRUCTURE
MLJB
DETAIL-``C"
-
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
FOR EARTHING
PLATE 100x50x6mm THK.
(TYP.)
CABLE TRAY FIXING (TYP.)
FOR LCS MOUNTING
EMLJB
ACABLE TRAY
REQUIRED QTY.
1 No.
DETAIL-``C"
TOP OF SKID STRUCTURE
EMLJB
DETAIL-``C"
-
CABLE TRAY FIXING (TYP.)
FOR LCS MOUNTING
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
A
CABLE TRAY
REQUIRED QTY.25 No.
DETAIL-``C"
FOR EARTHING
PLATE 100x50x6mm THK.
(TYP.)
TOP OF SKID STRUCTURE
HEATTRACING
ISOLATIONSWITCH
HEAT TRACINGISOLATION SWITCH
HEATTRACING
ISOLATIONSWITCH
DETAIL-``D"
6mm Thk.Plate
for M6 Bolts
-
STRUCTURECOLUMN OR
EARTH BOSS
CABLE TRAY
& SHROUD CABLE GLAND
EARTHING BOSS POWER CABLE
STRUCTURECOLUMN OR
HEAT TRACINGISOLATION SWITCH
FOR LCS MOUNTING
HEATTRACING
ISOLATIONSWITCH
HEATTRACING
ISOLATIONSWITCH
6mm Thk.Plate
for M6 Bolts
DETAIL-``B"
REQUIRED QTY.
15 No.
-
for M6 Bolts
for M6 Bolts
-
for M6 Bolts
for M6 Bolts
-
10 mm Rod.
6mm Thk.(TYP.)
10mm Thk.Platefor M12 Bolts
(TYP.)
for M6 Bolts
1
3
4
4
1
6
TRAYCABLE
2
for M6 Bolts
5
2
TO NEXT JB
FROM JB
6
5
7
8
-
CABLE TRAY
F.G.L
HORIZONTALMOTOR
POWER CABLE
MOTOR TERMINAL BOX
CABLE GLAND & SHROUD(NICKEL PLATED BRASS)100x50x6mm STEEL
CHANNEL
CONTROL CABLE
CANOPY LOCAL CONTROL STATION
TO MCC
PVC CONDUIT
SADDLES FORCONDUIT FIXING
PVC CONDUIT
CABLE TRAY
F.G.L
HORIZONTALMOTOR
POWER CABLE
MOTOR TERMINAL BOX
CABLE GLAND & SHROUD(NICKEL PLATED BRASS)100x50x6mm STEEL
CHANNEL
CONTROL CABLE
CANOPY LOCAL CONTROL STATION
TO MCC
PVC CONDUIT
SADDLES FORCONDUIT FIXING
PVC CONDUIT
SPACE HEATER TERMINAL BOX
SPACE HEATER CABLE
TO MCC
PVC CONDUIT
SADDLES FORCONDUIT FIXING
EARTHING LUG PLATE
EARTHING LUG PLATE
-
CABLE TRAY
T.O.S
HORIZONTALMOTOR
POWER CABLE
MOTOR TERMINAL BOX
CABLE GLAND & SHROUD(NICKEL PLATED BRASS)100x50x6mm STEEL
CHANNEL
CONTROL CABLE
CANOPY LOCAL CONTROL STATION
TO MCC
CABLE TRAY
HORIZONTALMOTOR
POWER CABLE
MOTOR TERMINAL BOX
CABLE GLAND & SHROUD(NICKEL PLATED BRASS)100x50x6mm STEEL
CHANNEL
CONTROL CABLE
CANOPY LOCAL CONTROL STATION
TO MCC
SPACE HEATER TERMINAL BOX
SPACE HEATER CABLE
TO MCC
T.O.S
EARTHING LUG PLATE
EARTHING LUG PLATE
-
HORIZONTALMOTOR
F.G.L
REMOTE CONTROL UNIT
EARTHING CABLEMOTORTERMINAL BOX
INT/EXT EARTH STUD M10 SSTINNED COPPER CRIMP TYPE CABLE LUG
EARTHING BOSSDETAIL-1 (TYP)
HORIZONTALMOTOR
T.O.S
REMOTE CONTROL UNIT
EARTHING CABLEMOTORTERMINAL BOX
INT/EXT EARTH STUD M10 SSTINNED COPPER CRIMP TYPE CABLE LUG
EARTHING LUG PLATE
EARTHING BOSSDETAIL-1 (TYP)
MATERIAL: BRASS
LOCK WASHERPHOSPHOR BRONZE
CS (EARTH BOSS)
OR SURFACE OF EQUIPMENT
6mm FILLET WELD
STRUCTURAL MEMBER
NUT & WASHERM10/13 x 65mm LONG STUD
M10x65mm LONGSTUD (BRASS)
CRIMPED TINNED COPPER LUG
SHRINK SLEEVE OR EQUIVALENT
TO NEAR BY
EARTHING BUS BARDETAIL-2
EARTH GRID
MATERIAL: BRASS
LOCK WASHERPHOSPHOR BRONZE
CS (EARTH BOSS)
OR SURFACE OF EQUIPMENT
6mm FILLET WELD
STRUCTURAL MEMBER
NUT & WASHERM10/13 x 65mm LONG STUD
M10x65mm LONGSTUD (BRASS)
CRIMPED TINNED COPPER LUG
SHRINK SLEEVE OR EQUIVALENT
EARTHING BUS BAR300(L) X 50(W) X 6(THK)
M10 NUT, WASHER, FOR EARTHING(TYP)
1. ELECTRICAL EQUIPMENT MOUNTED ON THE SKID WILL BE EARTHED TO SKID STRUCTURE.2. TWO NUMBER OF DIAGONALLY OPPOSITE EARTH BOSS WILL BE PROVIDED ON THE SKID FOR SKID EARTHING.
NOTES:
-
TO NEAR BY
HORIZONTALMOTOR
F.G.L
REMOTE CONTROL UNIT
EARTHING CABLEMOTORTERMINAL BOX
INT/EXT EARTH STUD M10 SSTINNED COPPER CRIMP TYPE CABLE LUG
EARTHING BUS BAR
EARTHING BOSSDETAIL-1 (TYP)
HORIZONTALMOTOR
REMOTE CONTROL UNIT
EARTHING CABLEMOTORTERMINAL BOX
INT/EXT EARTH STUD M10 SSTINNED COPPER CRIMP TYPE CABLE LUG
EARTHING LUG PLATEEARTHING BOSSDETAIL-1 (TYP)
MATERIAL: BRASS
LOCK WASHERPHOSPHOR BRONZE
CS (EARTH BOSS)
OR SURFACE OF EQUIPMENT
6mm FILLET WELD
STRUCTURAL MEMBER
NUT & WASHERM10/13 x 65mm LONG STUD
M10x65mm LONGSTUD (BRASS)
CRIMPED TINNED COPPER LUG
SHRINK SLEEVE OR EQUIVALENT
MATERIAL: BRASS
LOCK WASHERPHOSPHOR BRONZE
CS (EARTH BOSS)
OR SURFACE OF EQUIPMENT
6mm FILLET WELD
STRUCTURAL MEMBER
NUT & WASHERM10/13 x 65mm LONG STUD
M10x65mm LONGSTUD (BRASS)
CRIMPED TINNED COPPER LUG
SHRINK SLEEVE OR EQUIVALENT
T.O.S
DETAIL-2
EARTH GRID
EARTHING BUS BAR300(L) X 50(W) X 6(THK)
M10 NUT, WASHER, FOR EARTHING(TYP)
1. ELECTRICAL EQUIPMENT MOUNTED ON THE SKID WILL BE EARTHED TO SKID STRUCTURE.2. TWO NUMBER OF DIAGONALLY OPPOSITE EARTH BOSS WILL BE PROVIDED ON THE SKID FOR SKID EARTHING.
NOTES:
-
CABLE TRAY
ACABLE TRAY
TOP OF SKID STRUCTURE
EARTHING LUG PLATE
ELECTRICAL EQUIPMENT
EARTHING CABLE
INT/EXT EARTH STUD M10 SSTINNED COPPER CRIMP TYPE CABLE LUG
EARTHING LUG PLATE
ELECTRICAL EQUIPMENT
EARTHING CABLE
INT/EXT EARTH STUD M10 SSTINNED COPPER CRIMP TYPE CABLE LUG
ELECTRICAL EQUIPMENT
EARTHING CABLE
EARTHING LUG PLATEDETAIL-B
FOR EARTHING
PLATE 100x50x6mm THK.
TOP OF SKID STRUCTURE
EARTHING BOSSDETAIL-1 (TYP)
MATERIAL: BRASS
LOCK WASHERPHOSPHOR BRONZE
CS (EARTH BOSS)
OR SURFACE OF EQUIPMENT
6mm FILLET WELD
STRUCTURAL MEMBER
NUT & WASHERM10/13 x 65mm LONG STUD
M10x65mm LONGSTUD (BRASS)
CRIMPED TINNED COPPER LUG
SHRINK SLEEVE OR EQUIVALENT
1. ELECTRICAL EQUIPMENT MOUNTED ON THE SKID WILL BE EARTHED TO SKID STRUCTURE.2. TWO NUMBER OF DIAGONALLY OPPOSITE EARTH BOSS WILL BE PROVIDED ON THE SKID FOR SKID EARTHING.
NOTES: