# Estimate Cost : Rs. 900.00 Lakhs # Admn. Sanction : GO Rt. No. 344 dt. 15.02.2014 of the PR & RD (RWS-II) Dept, Govt., of Andhra Pradesh. Hyderabad. of PR&RD (RWS- II) Department # Source of water : Gargeya project # Habitations to be covered : # Name of Contractor: M/s VSA infra projects pvt.Ltd,Hyd. . CPWS Scheme to Piler & 8other Habitations Mandal : Piler Tota l Habitati ons: 9 9

Upload: prasadreddy-nemmali

Post on 07-Apr-2017

192 views

Category:

Engineering


1 download

TRANSCRIPT

Page 1: cpwss to piler and 8other habitations

# Estimate Cost : Rs. 900.00 Lakhs# Admn. Sanction : GO Rt. No. 344 dt. 15.02.2014 of the PR &

RD (RWS-II) Dept, Govt., of Andhra Pradesh. Hyderabad. of PR&RD (RWS-II) Department

# Source of water : Gargeya project

# Habitations to be covered :

# Name of Contractor: M/s VSA infra projects pvt.Ltd,Hyd.

.

CPWS Scheme to Piler & 8other Habitations

Mandal : Piler TotalHabitations: 9 9

Page 2: cpwss to piler and 8other habitations

Salient features of the Project

DescriptionNo. Amount

(Rs. in Lakhs)

Drilling of Bore wells 1 7.20

Pump sets (In the Bore wells) 1 16.20

Construction of 5m dia Intake well cum Pump House at Gargeya Project

1 15.00

Construction of foot bridge at Intake well 1 35.00

Constuction of 150KL GLBR near Kuravapalle 1 10.80

Contd….

Page 3: cpwss to piler and 8other habitations

Description No. Amount (Rs. in Lakhs)

Construction 0f 9x6mts Watchman quarters at Piler and head works

1 7.00

Construction of Slow sand filters of size 22x11 at kothapalle

1 10.00

Providing Pumping & Transmission lines 1 615.00

From intake well to 150KL GLBR (50HP VT pumpsets 2 No)

1 10.00

From existing 250 KL sumpwell to 250kl OHBR at R&B guest house (Suitable horizontal submersible pumpsets 12 HP 2 Nos)

1 22.80

Power supply 1 27.00

Construction 0f 6x4mts Watchman quarters at Piler and head worksConstuction of 150KL GLBR near Kuravapalle

1 6.60

Page 4: cpwss to piler and 8other habitations

Present stage of workDescription of Item Stage

a. Off-take point The Proposed source Grageya project was located near village Balamvaripalle which is at a distance of 10KM from the Piler town. The Gargeya project is an irrigation project which is having 98 mcft of storage capacity and having dead storage of 16 mcft and capacity of the reservoir above sluice is 82mcft.The total water requirement t for Piler and 8 other habitations is 4275 LPM (43mcft).

b. Bore well and SP Sets completed

c. GLBR completed

D Power supply Progress

>

>

>

Page 5: cpwss to piler and 8other habitations

Description of Item Stage

e. Head works:

(i) In take well Earth work completed

(ii) Foot bridge Earth work completed

f. Pipes(Pumping Main):

(i) 400mm K7- DI pipes 400m Procured

(ii) 150mm K9- DI pipes 3800m Procured

(iii) 350mm K7-DI Pipes 11000m Procured

>

>

>

>

Contd…. Present stage of work

>

Page 6: cpwss to piler and 8other habitations

THANK YOU

SUPERINTENDING ENGINEER

RWS&S CIRCLE, CHITTOOR

Page 7: cpwss to piler and 8other habitations

END

Page 8: cpwss to piler and 8other habitations

BACK

GLBR 150 KL @ BALAMVARIPALLE

Page 9: cpwss to piler and 8other habitations

BACK

Watchman quarters

Page 10: cpwss to piler and 8other habitations

BACK

BORE WELL - I

Page 11: cpwss to piler and 8other habitations

BACK

BORE WELL - II

Page 12: cpwss to piler and 8other habitations

BACK

BORE WELL - III

Page 13: cpwss to piler and 8other habitations

BACK

BORE WELL - IV

Page 14: cpwss to piler and 8other habitations

BACK

BORE WELL - V