create bom cs01
TRANSCRIPT
-
8/13/2019 Create Bom Cs01
1/6
Process Create Bill Of Material
Enter Transaction code CS01in command field.
After entering transaction code CS01 in command field Press Enter then you
will get a screen having title, Create Material BOM: Initial Screen.
On this screen you have to enter Material (For which you want to create BOM),
Plant (In which you want to create BOM) and usage (1 - Production). Current
date will appear as a Valid From date.
Command Field enter CS01
-
8/13/2019 Create Bom Cs01
2/6
After entering material, plant and usage press enter then you will get a screen
having title Create material BOM: General Item Overview
On this screen you have to enter Item Category ( L- Stock Item ) , material
number and quantity of the material. Material description and base unit of
measure will be picked from material master and will be displayed on the same
screen in Component Description and Un fields respectively. You can add any
number of components.
Valid from and valid to dates will also appear. Valid From date will be the dateon which you are creating BOM (currant date) and Valid to date will be the
SAP standard date 31.12.9999.
Enter Material number for which you
want to create BOM.
Enter plant in which you want to create
BOM.
Enter USAGE
1 - Production
-
8/13/2019 Create Bom Cs01
3/6
After entering item category, component number and component quantity just
press enter , component description and unit of measure will be automatically
picked up from material master.
Enter Component
Number
Component Description and Unit of
measure (From Mat. Mast.)
Enter Component
Quantity
Enter
tem
Category
L
Valid From date
current date.
Valid To date SAP
standard 31.12.9999
-
8/13/2019 Create Bom Cs01
4/6
Select the component and Click the item detail icon which is there on a
toolbar of the same screen.
After clicking on item detail icon you will get a screen having title Create
Material BOM:Item:All data .
Select Item 0010 and click on item
detail icon.
-
8/13/2019 Create Bom Cs01
5/6
Click on status/Lng Texttab. Following screen will appear.
Click on this Status/Lng Text
Tab
-
8/13/2019 Create Bom Cs01
6/6
Enter production storage location
After entering production storage location SAVE (Click on this icon).
Message will appear at as creating BOM for material 22222201#
BOM for material 22222201# created.
Transaction complete.
Enter production storage
location.
Click on this Icon to
SAVE the BOM.