09/09/2013 1 Creating a Hub for the Future Contents Duqm, a strategic location Port of Duqm: Master Plan & Key Figures & development Potential markets for the Commercial Terminals

Upload: others

Post on 25-Jan-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

  • 09/09/2013

    1

    Creating a Hub for the Future

    Contents

    • Duqm, a strategic location

    • Port of Duqm: Master Plan & Key Figures &

    development

    • Potential markets for the Commercial

    Terminals

  • 09/09/2013

    2

    Oman in the world

    Riyad

    Baghdad

    Beijing

    Singapore

    Tehran

    UAE

    Lagos

    Muscat

    Paris

    Mumbai

    Durban

    Cairo

    Qatar

    London Frankfurt

    Duqm

    Tripoli

    Milan

    Location of Duqm in Oman

    Duqm

    • Duqm port is located

    in the Sultanate of

    Oman

    • Oman is the second

    largest country of

    the GCC in terms of

    population

    • Oman is located out

    of the strait of

    Hormuz

  • 09/09/2013

    3

    Ideal location within Oman

    • Proximity to natural resources

    • Next to the new oil concession,

    inland and offshore

    • Land Availability

    • At the heart of the largest

    development project of OmanSur

    Muscat

    Ras Musandam

    Masirah

    Salalah

    Hayma

    Nizwa

    SoharAl Buraymi

    Duqm

    Duqm, the largest development project of Oman

  • 09/09/2013

    4

    Highlights of Duqm project

    Modern Port and

    Dry Dock

    International

    Airport

    New Town

    Industrial Areas

    Hotel & Resort Area

    Transport System: Duqm access road

    Duqm is (550 km) from

    Muscat and is accessible by

    road via:

    • Muscat – Salalah highway

    • Sinaw –Mahout– Duqm

    • The coastal road (Shannah -

    Mahout) and (Salalah – Duqm)

    DUBAI

    YEMEN

    R 32

    R 31

    Sur

    Masirah

    Salalah

    Sohar

    Duqm

    Muscat

    IRAN

    UAE

    KSA

    ABU DHABI

    Hayma

    Al Buraymi

    Ras Musandam

    Nizwa

    Sinaw

  • 09/09/2013

    5

    Transport System: Duqm railway connection

    • The rail route is part of proposed Inter-

    GCC railway running from Kuwait to

    Salalah (and possibly to Yemen)

    • provide greater capacity for freight and

    passenger transport to:

    • reduce cost and road freight services

    • create faster transfer of goods

    services between countries in GCC

    YEMEN

    R 32

    R 31

    Sur

    Ras Musandam

    Masirah

    Salalah

    Nizwa

    Duqm

    Muscat

    IRAN

    UAE

    KSA

    DUBAI

    ABU DHABI

    Hayma

    SoharAl Buraymi

    Phase 1: 900KM

    Phase 2: 500KM

    Start of operation 2016- 2018

    TRANSPORT SYSTEM: Duqm roads

    • Major Roads (72 km) 80m ROW

    • Local Road ( 73 km) 20-50m ROW

  • 09/09/2013

    6

    Port of Duqm: Master Plan

    11

    Commencement

    Duqm 2003

  • 09/09/2013

    7

    Details of the Master Plan

    Approach Channel

    Commercial

    Terminals

    Phase 1

    Royal Navy BerthsHarbour

    Basin 2

    Commercial

    Terminals

    Phase 2

    Liquid Jetties

    Dry Dock1: L 410m x W 95m x D -14.2m

    Dry Dock 2: L 410m x W 80m x D -14.2m

    Oman Dry Dock

    In addition to the presented facilities, the port is equipped with MARPOL , water

    + fuel bunkering and domestic waste collection+treatment facilities

    Harbour

    Basin 1

    Area for logistics :

    -Warehousing

    -Storage

    -Services

    Infrastructure Packages

    55

    55

    123

    4567

    1

    1

    1

    1

    1

    1

    3

    4

    5

    6

    6

    7

    7

  • 09/09/2013

    8

    Key Figures

    • Area:

    – Total port boundary: 170 km2

    – Land area accommodates: commercial quays, liquid jetties and

    1550 ha for logistics (warehousing, storage and services)

    • Breakwaters:

    – Lee breakwater: 4.5 km

    – Main breakwater: 4.1 km

    • Water depths: to allow safe reception of vessels with capacity up to 150 000 DWT

    – Approach channel: -19m

    – Commercial berths Phase 1: -18m

    • Commercial Terminals Phase 1 (2.325km of berths, 80 ha. area): under construction

    – Multi-Purpose terminal : 0.8 Mt (425 m of berth)

    – Container terminals : 3.5 M TEU (1 600 m of berth)

    – Dry bulk terminal : 5.0 Mt (300 m of berth)

    • Liquid Jetties: design works start in 2013

    • Commercial Terminals Phase 2 (10km of berths) to be defined later

    Dredging Works

    Channel

    Dredged

    to -19m

    CD

    Dry Dock

    Area

    Dredged

    to -18m

    CD

    Dredged

    to -7m

    CD

    Main

    Basin -

    Dredged

    to -18m

    CD

    Dredged

    to -10m

    CD

    Dredged Quantities

    Channel Dimensions

    Basin Properties

    Approach Channel

    27 million m3

    Basin 44 million m3

    Total Quantity 71 million m3

    Channel Depth

    Channel Length

    Channel Width

    -19 m CD

    9.5 km

    275 - 350 m (655m at bend)

    Basin Area

    Basin Depth

    Dry Dock Depth

    5.12 km2

    -18 m CD

    -10 m CD

  • 09/09/2013

    9

    •Dry bulk terminal

    •300 m of berth ( 5 Mt/y)

    •Container terminal

    1600m of berth (3.5 MEU/y)

    •Multi-Purpose terminal

    •300 + 125 m of berth (0.8 Mt/y)

    •Port Operations Area ( traffic

    control tower, tugboats, port

    emergency building…)

    Details Commercial Quays

    Phase 1

    Terminal 2

    = Container handling

    Terminal 1

    = Multi Purpose

    Terminal 4

    = Dry Bulk

    Port Operations

    Area

    Terminal 3

    = Container handling

    Government Berths: Buildings & Infrastructure

    ROYAL OMANI

    POLICE

    IP3

  • 09/09/2013

    10

    Finger Pier & Early Operations

    • PDC Working Offices & Control Room

    • Finger Pier for Operational Vessels & Fueling

    • Pipelines for Cement & Fuel Loading/Unloading

    Potential Market forMulti-Purpose / Project Cargo

    in the Port of Duqm

  • 09/09/2013

    11

    Central Location in Oman

    • Close to the (new) oil and gas

    concessions, inland and

    offshore

    • Direct road access between

    Duqm and the oil fields and

    free of bridges and tunnels

    • Today there is no longer

    acceptance of (oversized)

    project cargo going to Oman

    through UAE’s main portsMuscat

    Salalah

    Sohar

    HaymaDuqm

    300KM

    250KM

    200KM

    150KM

    100KM

    First Project Cargo, April 2012

  • 09/09/2013

    12

    Potential Market for

    the container terminalsin the Port of Duqm

    On the Main Shipping Route

    • Duqm is strategically located:

    on the main international trading route between Asia and Europe.

  • 09/09/2013

    13

    Connection To The Growing Markets

    India Ocean Rim

    Mid-East

    ISC

    East Africa

    Red Sea Port Traffic

    24.1 Mn -12%

    Port Traffic

    11.2 Mn -10%

    Total Tanshipment

    Market

    37 Mn TEU –11% average

    growth

    Port Traffic

    1.9 Mn -7%

    Mid-East

    ISCEast Africa

    The pyramid

    shows each

    region’’’’s total and gateway

    traffic in Million

    TEU and growth

    rate over last 9

    years

    (2000-09)

    Potential Market for the Dry Bulk terminal in the

    Port of Duqm

  • 09/09/2013

    14

    Logistic Support for Minerals Industry

    • The region is very rich in minerals:

    Limestone

    Silica Sand

    Dolomite

    Solar Salt

    Basalt

    Laterite

    • The region is very rich in minerals:

    Gypsum

    Kaolin

    Granite

    Gabbro

    Attapulgite

    Logistic Support for Minerals Industry

  • 09/09/2013

    15

    Comparison with Iconic Structures

    Rock required

    for the port

    construction:

    18.0 million

    tonnes

    Rock required

    for the port

    construction:

    18.0 million

    tonnes

    The mass of the

    Pyramid of Giza

    in Egypt

    The mass of the

    Pyramid of Giza

    in Egypt

    Steel required

    for the port

    construction:

    35,000 tonnes

    Steel required

    for the port

    construction:

    35,000 tonnes

    The metal

    structure of the

    Eiffel Tower in

    France

    The metal

    structure of the

    Eiffel Tower in

    France

    Concrete

    required for the

    port

    construction:

    1.8 million

    tonnes

    Concrete

    required for the

    port

    construction:

    1.8 million

    tonnes

    The concrete

    used to

    construct the

    Burj Khalifa in

    Dubai

    The concrete

    used to

    construct the

    Burj Khalifa in

    Dubai

    3 times 5 times 2.5 times 65 times

    Total quantity of the channel

    & basin dredging:

    71 million cubic metres

    The volume of the new

    Wembley Stadium in

    United Kingdom

    Thank you