CREATING NEW PROJECT

PT. Yokogawa IndonesiaWisma Aldiron Dirgantara 2nd floor, suite 202-209

Jl. Jend. Gatot Subroto Kav.72 Jakarta 12780Phone : 021-799 0102, Fax : 021-799 0070

CREATING NEW PROJECT

Engineering Course

Page 2: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Engineering Work FlowStart

Start System View

Step 1: Project Creation• Create necessary folders for target system

Step 2: Defining Project Common Item• Define security function• Define operation marks

Step 3: Defining FCS Control Functions• Define FCS station configuration• Define Process I/O modules• Define Software I/O• Define Messages• Define Regulatory Control Functions• Define Sequence Control Functions

Step 4: Defining HIS Control Functions• Define HIS station configuration• Define HIS constants• Define Function Keys assignment• Scheduler Function• Trend Recording Functions• Define Sequence Message• Define User-defined windows • Define Help Dialog

Step 5: Conducting Test Function• Run a Virtual Test Function Page B4

Page 3: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Specification ReviewReview the I/O list, process control methods and necessary hardware.

Basic DesignUsing organized and structured windows to realize the desired control functions (regulatory control, sequence control and unit supervision) and the operation and monitoring functions.

Detailed DesignDesign detailed items (program configuration, creation of data list) for the regulatory control, sequence control, unit supervision and the operation and monitoring windows according to the basic design.

Engineering Work Flow

Page 4: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

System GenerationConstruct a system using various builders based on the basic design and detailed design.

Unit TestCheck the control loop operation as well as the operation and monitoring windows by using the virtual test function.

Integration TestUsing the actual FCS, check the overall validity of functions and execution timings that were checked individually through the unit test.

Engineering Work Flow

Page 5: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Start UpInstall and wire the target machine, carry out test operation and then normal operation.

MaintenanceBack up engineering data, inspect hardware, etc.

Expansion and ModificationExpand the station, as well as add and change functions.Review the I/O list, process control methods and necessary hardware.

Engineering Work Flow

Page 6: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Project Creation

ProjectProject’’s Attribution Utilitys Attribution Utility

Click

Click

In the Yokogawa Centum Menu select “Project’s Attribution Utility”

Page 7: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

ProjectProject’’s Attribution Utilitys Attribution Utility

A B C

D E F G

A.A. Project nameProject name Shows the projects that have been registered.

B.B. LocationLocation Shows the location/directory where the project file reside

C.C. Project AttributeProject Attribute Shows the attribute of the registered projects.

D.D. RegisterRegister Button used to register new projects.

E.E. ChangeChange Button used to change project’s attribute.

F.F. DeleteDelete Button used to remove projects registration information

G.G. ExitExit Button used to finish/exit project registration utility.

Project Creation

Page 8: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Registering Project DatabaseRegistering Project Database

Locate your project database file, folder name must not contain space.

Click

Select your project

Project name registered is shown here

Select project attribute *

* For active project, select “Current Project”

1

2

3

4

Project Creation

Page 9: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Registering Project DatabaseRegistering Project Database

Project has been registered !

Project Creation

Page 10: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Changing Project Database AttributeChanging Project Database Attribute

Select/highlight the project its attribute you want to change.

Select attribute

1

2

3

4

5

Project Creation

Page 11: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Default Current User-defined

Created the first time when the System View starts

Yes - -

Virtual test with the FCS simulator. Yes Yes but target test Yes

Can be downloaded to the FCS of the target system

Yes but off line Yes but on line No

Can be downloaded to HIS. Yes Yes No

Multiple projects can be created in System View.

No No Yes

Page C1

When any one of the FCS’s created in default project is successfully downloaded, the attribute changes to a current project.

Project Attribute - Differences

Page 12: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION

To create a project for the first time, start the System View.

Microsoft Windows Start button

Page 13: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION

This message window pops up if there’s no a project registered. It will also pops up when creating project for the first time.

Respond by clicking Yes button.

Page 14: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION

Fill in the user and project information below. Project information should not be left blank, otherwise project creation will terminate.

Create a name for your project name. A project name is an alphanumeric character string, maximum 8 characters. The first character of a project must be an alphabet.

The project position is the volume / folder where your project folder (database) is located in the hardisk. The default position is C:\CENTUMVP\ENG\BKPROJECT\XXXXXXXX

Page 15: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Page 16: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Page 17: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Page 18: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

Page 19: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION

A project appears in the System View when it is created and registered.

Next step is to create first FCS.

Select the type of the FCS (you may have to consult the label attached to the FCS panel for the station type).

Select database type for your FCS. Most of the time General-Purpose is selected.

Define the correct domain and station number. This is the address of your station in the system. The number set here must correspond to the address set by hardware.

Additional information for the FCS. If left blank, will not impact system performance.

Click to finish. When clicked, the new FCS will be generated.

Page 20: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION

Newly created FCS and other builder items are shown.

Next step is to create first HIS/EWS.

Select the type of the HIS. Available types are: - PC with operation &

monitoring functions. - Enclosed display style

console type HIS. - Open display style

console type HIS. - Server type for remote

monitoring HIS.

Define the correct domain and station number. This is the address of your station in the system. The number set here must correspond to the address set by hardware.

Additional information for the FCS. If left blank, will not impact system performance.

Click to finish. When clicked, the new HIS will be generated.

Page 21: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION

Newly created HIS and other builder items are shown.

You just have created a minimum configuration of a project.

Page 22: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Adding New Station)

To add some other stations, you may right click on any icon/folder under System View folder then select Create New… option. Pick a station type from the menu that pops up.

Click to add new FCS

Click to add new HIS

Click to add new BCV

Click to add new CGW

Click to add new SCS (ProSafe)

Click to add new other station type

Page 23: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Adding I/O Node)

To add I/O node: Expand the FCS folder, right-click IOM folder

Create new

Node

Page 24: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Adding I/O Node)

Select node type, either Local or Remote type.

Define the node number. This number corresponds to node address hardware setting.

This section is used only in case of remote node.

Setting for node power supplies.

Additional information for the node.

Click to finish. When clicked, the new I/O node will be generated.

Page 25: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Adding I/O Node)

Newly created Node is displayed after generation.

Up to 10 nodes can be assigned in an FCS.

When a node is created and ready, you can now add I/O modules to that node.

Page 26: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Adding I/O Module)

To add I/O module: Expand the IOM folder, right-click NODEXXXX folder

Create new

IOM…

Page 27: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Adding I/O Module)

To add I/O module: Expand the IOM folder, right-click NODEXXXX folder

Create new

IOM…

Select I/O module type. This must confirm with your field signal type.

Slot number of the I/O module.

Check this option if you assign a redundant I/O module.

Check this option for high speed reading.

Additional information (commentary) for the I/O module.

Click to finish. When clicked, the new I/O module will be generated.

Page 28: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Creating I/O Module)

Newly created I/O module is displayed.

Up to 8 modules can be assigned in a node unit if FCS is KFCS.

List of I/O modules assigned in a node.

Page 29: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Creating I/O Module Tag Name)

To create I/O module tag name, double click on the I/O module to open its builder. In this example, let’s create analog & digital I/O module tag name (AAI143-S [Slot 1] and ADV151-P [Slot 3]).

Page 30: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Creating I/O Module Tag Name)

I/O Module Builder (Analog) Click this button (Show/Hide Detailed Setting Items) to show this portion of builder.

Label is the item that will be used in the control drawing. Analog I/O module tag name must have %% symbol as prefix and followed by alphanumeric identifier. Note that alphabet must come right after %% symbol.

Example %%TT101

Correct %%100TT101

Wrong (numeric comes after %% symbol)

%%TT-101

Correct

Download

Download when finish creating I/O module tag name.

1

2

3

Page 31: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

PROJECT CREATION (Creating I/O Module Tag Name)

I/O Module Builder (Digital)

Tag Name is the item that will be used in the control drawing. Digital I/O module tag name uses combination of alphanumeric characters. Unlike analog I/O module tag name, %% symbol is not necessary.

Example LSL102

Correct 100LSL102

Correct 100-LSL-102

Correct

Download

Download when finish creating I/O module tag name.

Define the label for status indication here.

Define the color for status indication label here.

Page 32: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

I/O MODULE CREATION

Loop Diagram (1/5) – Analog Input/Output

FieldMarshalling

CabinetDCS

Terminal Board

+_

+_

100-JBA-01

0102

+_

900-CP-01 TB-01

101102

+_

900-TBA-01 F1-AEA4D

0102

Type AAI143 Node 01 Slot 01 Channel 01

FCS0101Black

White

+_

+_

100-JBA-01

0304

+_

900-CP-01 TB-01

103104

+_

900-TBA-01 F1-AEA4D

0304

Type AAI143 Node 01 Slot 01 Channel 02

FCS0101Black

White

+_

+_

100-JBA-02

0102

+_

900-CP-01 TB-02

101102

+_

900-TBA-01 F2-AEA4D

0102

Type AAI543 Node 01 Slot 02 Channel 01

FCS0101Black

White

TIC 101

PIC 101

DR0002

DR0002

TT-101

PT-101

PV-101

DCSI/O Module Software

I

Page 33: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

I/O MODULE CREATION

Loop Diagram (2/5) - Analog Input

FieldMarshalling

CabinetDCS

Terminal Board

+_

+_

100-JBA-01

0506

+_

900-CP-01 TB-01

103104

+_

900-TBA-01 F1-AEA4D

0506

Type AAI143 Node 01 Slot 01 Channel 03

FCS0101Black

White

+_

+_

100-JBA-01

0708

+_

900-CP-01 TB-01

105106

+_

900-TBA-01 F1-AEA4D

0708

Type AAI143 Node 01 Slot 01 Channel 04

FCS0101Black

White

LI 102

FI 101

DR0002

DR0002

LT-102

FT-101

DCSI/O Module Software

I

Page 34: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

I/O MODULE CREATION

Loop Diagram (3/5) – Digital Input

FieldMarshalling

CabinetDCS

Terminal Board

+_

+_

100-JBD-01

0102

+_

900-CP-02 TB-11

103104

+_

900-TBA-01 R1-AEA5D

0102

Type ADV115 Node 01 Slot 03 Channel 01

FCS0101Black

White

+_

+_

100-JBD-01

0304

+_

900-CP-02 TB-11

105106

+_

900-TBA-01 R1-AEA5D

0304

Type ADV115 Node 01 Slot 03 Channel 02

FCS0101Black

White

LAL 102

LAH 102

DR0003

DR0003

LSL-102

LSH-102

DCSI/O Module Software

NC

NC

I

Page 35: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

I/O MODULE CREATION

Loop Diagram (4/5) – Digital Input

FieldMarshalling

CabinetDCS

Terminal Board

+_

+_

100-JBD-01

0506

+_

900-CP-02 TB-11

107108

+_

900-TBA-01 R1-AEA5D

0506

Type ADV551 Node 01 Slot 04 Channel 03

FCS0101Black

White

+_

+_

100-JBD-01

0708

+_

900-CP-02 TB-11

109110

+_

900-TBA-01 R1-AEA5D

0708

Type ADV551 Node 01 Slot 04 Channel 04

FCS0101Black

White

LALL 102

LAHH 102

DR0003

DR0003

LSLL-102

LSHH-102

DCSI/O Module Software

NC

NC

Page 36: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

I/O MODULE CREATION

Loop Diagram (5/5) – Digital Output

Field Interposing Relay Cabinet

DCS Terminal Board

+_

+_

100-JBE-01

0102

49

905-CP-02 R-01 T-01

0102

+_

900-TBA-01 R4-ARM55W

0102

Type ADV551 Node 01 Slot 04 Channel 01

FCS0101Black

White

+_

+_

100-JBE-01

0304

0304

+_

900-TBA-01 R4-ARM55W

0304

Type ADV551 Node 01 Slot 04 Channel 02

FCS0101Black

White

DR0003

SV-101

SV-102

DCSI/O Module Software

I

905-CP-02 R-02 T-01

49

110VAC

110VAC

Page 37: CREATING NEW PROJECTmaulana.lecture.ub.ac.id/files/2012/04/5.-VPEG... · CREATING NEW PROJECT. PT. Yokogawa Indonesia. Wisma Aldiron Dirgantara 2. nd . floor, suite 202-209 Jl. Jend

PT YOKOGAWA INDONESIATraining Center – Technical Support Group

CS3KEG-Project Creation

PT YOKOGAWA INDONESIATraining Center – Technical Support Group