creet · 2019-12-19 · rawafid al-hadharah al bakri group • family-owned with over 2,500...
TRANSCRIPT
CREETYou Start ... We
Deliver
Contents
CEO Message 04
Strategy 05
Our Mission & vision 06
Creet Milestones 07
AlBakri Group 08
Our Services 09
Creet Assets 10
Our Valuable Clients 11
Financing Credit Facilities 12
PROJECT CONTROL 13
HSE 15
INDUSTRIAL PROJECTS 18
MEP PROJECTS 32
Contents
HOTEL /COMMERCIAL/ RESIDENTIAL PROJECTS 33
INFRASTRUCTURE PROJECTS 51
CREET CLIENTS 60
Completed Project 61
Organization Chart 63
Equipment And Machinery 64
Legislation Documents 65
CONTACT US 69
CEO MESSAGE Our business can be divided into three key areas, namely, our domestic construction business, overseas business, and environmental business. To add further value to these areas, we strive to provide services tailored to the individual needs of our clients, both in Saudi Arabia and overseas, by using our technologies and the know-how which we have acquired through our experience and achievements.
The changing environment and diversifying needs—
Today, uncertainty about the global economy is widespread. By viewing changes in our environment as business opportunities, we remain firm in our commitment to developing advanced technologies and formulating innovative proposals unique to our company.
In addition to fulfilling our social responsibilities, our employees continue to focus all of our corporate resources to provide professional services to meet our client needs. To that end, we would like to ask for your continued support and patronage to help us serve all our clients.
( 4 )
StrategyOur Strategy in the current 5-year businessplan is to obtain a scale, of diversity andstrength of our company to ensure we arewell on the way to achieving our vision.Adopting and implementing proveninternational standards and best practices, isconsidered a major contributor to thisstrategic objective.
( 5 )
Our Mission & Vision
OUR MISSION & VISION
Mission
Maximizing our long term benefits
by satisfying customers’ needs
through value added design,
construction, and project
management services
Vision
To become the quality leader in
KSA, and the preferred choice by
our current future clients, in all the
business sectors that we are
specialized in.
( 6 )
CREET MILESTONES
2004Company Established
CREET was established in Jeddah—KSA, as a MEP contracting company
2006Expanded
CREET has expanded in the central region of Saudi
Arabia by having a strong base in Riyadh
2011Main Contractor
Creet became one of the Main contractors for KAEC
Mega project.
2015Project Volume
Creet start to have a work volume yearly exceeding 200
million S.R
2012AL Bakri Group
Creet merged with Al Bakri group to be the contracting
arm for all in-house and other projects.
01 02 03 04 05
( 7 )
Main Events in the Creet life
Rawafid Al-HadharahAL Bakri Group
• Family-owned with over 2,500 employees
• US 4-5 billion $ in revenues and assets over 1.5 billion $
• Largest KSA privately-owned oil and gas shipping fleet, oil storage and blending terminal,
bunker fuel distributor,
and oil bulk trader
• Bakri’s focus is liquids-based industries with a number of finance-design-build-operate
projects (FDBO) including:
• Storage and blending terminals
• Pipeline systems
• Desalinated water plant
• US 300 million $ of Bakri-Group equity invested into own FDBO projects and trade
financing of US 1.5 billion $ pa
• Financing tools include private equity, commercial debt, SIDF loans, and public market
Sheikh Abdulkader Al Bakri( 8 )
Our Services Creet contracting Co is a Design & Build contractor specialized in industrial and commercial projects & Fuel tank projects & with focus on low rise buildings .
Our scope of work at Creet is to undertake fully civil, Steel structural supply/erection, low-voltage electrical, HVAC and plumbing + finishing works for industrial and commercial low rise buildings, as we have MEP department specialized in MEP projects for all type of buildings (High rise buildings , low rise buildings ).
Design & build turnkeyDevelop a project from conception through constriction to completion .
Turnkey constructionProjects based on the requirements of the client as per the design of consultant.
MEP constructionSupply, Installation , Operation & Maintenance for HVAC, fire protection, plumbing process works, electrical, BMS, etc. ( 9 )
CREET ASSETS
+85
MANAGEMENTS
Managers, Engineers, Head
office Staff and Senior Levels.
+140
EQUIPMENT
Equipment, Machines, Manlifts,
Generators, Busses, Cars, etc.
+750
MANPOWER
CREET Manpower with all
trades,, Carpenters, Steel Fixers,
Pipe Fitters, Welders,
Technicians, etc.
( 10 )
CREET REFERENCES
OUR VALUABLE CLIENTS
( 11 )
FINANCING
CREDIT FACILITIES
Creet as a part of AL BAKRI Group is availing of credit facilities in excess of 200 Millions.
( 12 )
DURING PROJECT EXECUTION STAGE
PROJECT CONTROL
PROJECT CONTROL- QA/QC Managements
Inspection And Test PlanAll inspections and testing activities at site shall be carried out as per the approved Inspection & Test Plan (ITP).
Mockups & Sample ApprovalsMockups will enable the contractor and the client to ensure the work is built to their expectations.
Project Closeout DeliverablesProject Closeout Deliverables shall consist of the following: As Built Drawings, O & M Manuals, Guarantee & Warrantees, Spare Parts & Asset Register and all required documents
.
Project Quality PlanProject Quality Plan defines the project quality control and assurance system to be used for the Project as Document Numbering and Controlling Procedure, Project Quality Policy Quality Planning & Training, etc.
Work Method StatementWork method statement outlines the procedure and sequence of activities to be followed during the execution of the work with safe working environment.
SITE QUALITY CONTROL Site Quality Control shall be as per Work Inspection Procedure
.
( 14 )
Health, Safety and Environmental Plan
HSE
Our goal is to create sustain and incident-free environment,to deliver an excellent HSE performance at every stage of the projects by focusing on :
PROJECT MONITOR- HSE PLAN
Training Program
Safety and Skills training program that
cover all trades from top to bottom for all
site members. .
Indicators
Establishing meaningful leading and lagging
indicators to measure and manage
performance.
H.S.E behaviors
Creating a climate that is intolerant of
inappropriate H.S.E behaviors and unsafe
situations.
H.S.E management systems
Maintenance of effective H.S.E
management systems.
( 16 )
Creet have been awarded an appreciation certificate for the
achievement of 1,000,000 H without a lost time incident.
HSEAPPRECIATION CERTIFICATE
CERTIFICATE
( 17 )
INDUSTRIAL PROJECTS
The project Consist of Main Warehouse Bldg. (Area 62,950 sqm ) , Medical Hall Bldg. (Area 9,068 sqm ) and services Buildings (Area :1,982 sqm).
IMDAD PROJECT
Value
Scope
Consultant
Duration
Project Size
TEXT HOLDER
170,000,000 S.R
Civil & MEP Work
Al Hamdan Consulting
18 Months
82,000 BUA
Al Nahadi Pharma 2018
Industrial City, Jeddah
( 19 )
( 20 )
IMDAD PROJECT
( 21 )
IMDAD PROJECT
Turnkey project for cement product Industry ,the factory consist of Main PEB Steel Bldg.(Area 21,000 sqm ),and attached with administration Bldg, Total area of the land 55,000 sqm .
CEMENT PRODUCT INDUSTRY-(CPI)
Value
Scope
Consultant
Duration
Project Size
TEXT HOLDER
45,000,000 S.R
Civil & MEP Work
SAK
14 Months
21,000 BUA
CPI ongoing
KAEC
( 22 )
( 23 )
CEMENT PRODUCT INDUSTRY-(CPI)
( 24 )
CEMENT PRODUCT INDUSTRY-(CPI)
Complete Civil & MEP works of Agility Warehouse No.07 39,000 M2 and Mezzanine area 3600M2.
AGILITY WAREHOUSE NO.7
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
45 Million Saudi Riyal
Civil & MEP
Agility Engineering
12 Months
Agility Logistic Parks
( 25 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 6
• +20
• +80
• 10
Staff& Manpower
( 26 )
AGILITY WAREHOUSE NO.7
( 27 )
AGILITY WAREHOUSE NO.7
Complete Civil & MEP works of ARAMEX Warehouse 3,000 M2 and Mezzanine area 1500M2.
ARAMEX WAREHOUSE PROJECT AT RIYADH AIRPORT
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
15 Million Saudi Riyal
Civil & MEP
Dar Engineering
10 Months
Aramex
( 28 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 3
• +6
• +35
• 3
Staff& Manpower
ARAMEX WAREHOUSE PROJECT
Value Main
Contractor
( 29 )
The project consist of Warehouse with area 5,000 sqm include mezzanine offices ,Including cabling &cable tray supply and installation for hydration building ,silos,conveyor..kiln….and rest of process plant.
ASTRA AMC LIME PLANT
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
+20 million( Re-measurable )
Civil & MEP
BIN JAMAAN
12 Months
ASTRA
( 30 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 7
• +15
• +70 DirectManpower
• 10
Staff& Manpower
Main Scope :
• Civil works for the facilities .• Industrial warehouse .• Cable tray and cabling .• Air compressor system .
ASTRA AMC LIME PLANT
ASTRA AMC LIME PLANT
Construction Of Plastic Factory Main Contract Was Civil ,Plumbing ,Firefighting & Electrical
UNION PIPES INDUSTRIES FACTORY
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
+30 million
Civil & MEP
TYA
18 Months
UPI
( 33 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 8
• +12
• +75 DirectManpower
• 16
Staff& Manpower
Main Scope :
•Civil works & Finishing for the facilities.
• Industrial warehouse.
• Infra structure & Asphalt Works .
UNION PIPES INDUSTRIES FACTORY
UNION PIPES INDUSTRIES FACTORY
Other Industrial / Warehouse projects
MEP PROJECTS
1 2 3 4El-KHAYAT FACTORIES
Value: 45,000,000 S.R
Scope: MEP
Duration: 14 Months
CAN MAKING Factory
Value: 22,000,00 S.R
Scope: MEP &All related Works
Duration : 10 Months
JUICE Factory
Value: 20,000,000 S.R
Scope: MEP & All Related Works
Duration: 8 Months
MARS Chocolate Factory
Value: 18,600,000
Scope: MEP Services for the KAEC factory
Duration: 10 Months
( 36 )
HOTEL /COMMERCIAL/ RESIDENTIAL
PROJECTS
Turnkey Project Of Accommodation Blocks Including Senior Accommodation Building,Regular Accommodation Buildings, Community Building, Mosque And Exterior Development(Road And Landscape) Guard House, Basketball Court Etc.
LABOUR VILLAGE PROJECT
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
107 Million Saudi Riyal
Civil & MEP
ACE
30 Months
EMMAR
( 38 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 18
• 35
• 155
• 28
Staff& Manpower
LABOUR VILLAGE PROJECT MEP SCOPEInternal Systems :
• Mechanical Systems Cold & Hot water system ,Drainage System . Fire Fighting System ,HVAC ( Chilled water system & Chillers and AHUs ) ,LPG System .
• Electrical Systems LV Electrical system for the buildings (Power Distribution, Lighting System , Earthling and Lighting Protection ) ,Fire Alarm System Voice , Data and CCTV System .
External System :
• Mechanical Systems Pump Rooms, Lift stations, Fire Fighting Pumps, LPG Room & tanks and Storm Network system .
• Electrical Systems
MV Switch Gear, Package Substations, MV & LV cables between substation and buildings and ELV Cables &System for all the ( Fire Alarm , Data , Voice and CCTV System ) .
THE VILLAGE PROJECT
LABOUR VILLAGE PROJECT
Scope/Work Description : Turnkey project included such as Civil , structural ,architectural works , Mechanical and Electrical Works .
AL RAJHI BANK – OLD AIRPORT ROAD BRANCH
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
6 Million Saudi Riyal
Turnkey Project
ACE
7 Months
Al Rajhi Bank
( 42 )
Owner
Creet Int.
AL RAJHI BANK –RIYADH OLD AIRPORT ROAD
Design Supply And Install The Total Electro Mechanical Work For The Lulu Hyper Market In Khuraish Road Riyadh .
LULU HYPER MARKET
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
22 Million Saudi Riyal
Electromechanical Work ( D&B)
Dar Alarabia
18 Months
LuLu Hyper Market
( 44 )
End User
Creet Int.
Electromechanical Works
LULU HYPER MARKET
Scope/Work Description : Interior Finishing Including Wood Furniture Doors, Decorative Lights And Class Partitions,Painting And Decorative Marble And Wood Flooring, Wall Papers And Carpets ,Mechanical Works.
ISTETHMAR HEAD QUARTER TOWER
Value
Scope Duration
Main Contractor
TEXT HOLDER
22 Million Saudi Riyal
Fit Out (Finishing & MEP)
20 Months
Al Saghyir Investment
( 46 )
Client
Creet Int.
ISTETHMAR HEAD QUARTER TOWER
Construction Of 4 Stars hotel , with 255 keys operated by Millennium and Copthorne,located in Jeddah Al- Hamarh district, consist of 8 stories in addition to 4 basements
MILLENNIUM & COPTHORNE HOTEL PROJECT
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
132 million
Trunkey
AlBarah Consultancy Office
30 Months
AMSAD / ARA
( 48 )
Designer & ID
Creet Universal
Engineers
Equipments
Manpower
Foremens
• 7
• 20
• +250
• 8
Staff& Manpower
MILLENNIUM & COPTHORNE HOTEL PROJECT
MILLENNIUM & COPTHORNE HOTEL PROJECT
MILLENNIUM & COPTHORNE HOTEL PROJECT- IN PROGRESS
Construction Of 3 Senior Accommodation Buildings, 4 Regular Accommodation Buildings, Exterior Development (Road And Landscape) and all related infrastructure.
THE VILLAGE -PH03
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
74 Million Saudi Riyal
Civil & MEP
ECG
22 Months
EMMAR
( 52 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 12
• 35
• +400
• 10
Staff& Manpower
PHASE – 03 – PRECAST ERECTION
THE VILLAGE -PH03
PHASE – 03 – PODS INSTALLATION
THE VILLAGE -PH03
INFRASTRUCTURE
PROJECTS
Infrastructure and amenities, including water networks, sewage systems, telecommunication network, safety, security, drainage network, electricity and lighting
AL TALAH GARDENS 6
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
99 Million Saudi Riyal
Infrastructure
ECG
20 Months
EMMAR
( 56 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 17
• 110
• 320
• 35
Staff& Manpower
Main Scope :
oA- Grading & Backfilling
oB- Infrastructure:
1-Water and Fire Network2-Irrigation Network3- Sewage Network4- Storm Network5- Electrical Network6- Low Current Network7-Roads8- Streetscape9- Secondary Irrigation Network
AL TALAH GARDENS 6
AL TALAH GARDENS 6
AL TALAH GARDENS 6
Infrastructure and amenities, including water networks, sewage systems, telecommunicationnetwork, safety, security, drainage network, electricity and lighting
INDUSTRIAL VALLEY 04-B
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
32 Million Saudi Riyal
Infrastructure
Saudi Consult
10 Months
EMMAR
( 60 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 12
• +50
• +100
• 10
Staff& Manpower
INDUSTRIAL VALLEY 04-B
INDUSTRIAL VALLEY 04-B
Infrastructure and amenities, including water networks, sewage systems, telecommunicationnetwork, safety, security, drainage network, electricity and lighting
SHAMS AL RIYADH ZONE 4
Value
Scope
Consultant
Duration
Main Contractor
TEXT HOLDER
115 Million Saudi Riyal
Infrastructure
Aecom
14 Months
Dar Al Arkan
( 63 )
Owner
Creet Int.
Engineers
Equipments
Manpower
Foremens
• 17
• +120
• +320
• 35
Staff& Manpower
SHAMS AL RIYADH ZONE 4
IMDAD Project- Enabling work for Zone1,Zone3 and Zone4, the scope includes cleaning the site & disposal all debris, excavation works and filling of (A-1-a), (A-1-b) and A-3 (Clean Sand) materials.
IMDAD- ENABLING WORKS
Value
Scope
Consultant
Duration
Project Size
TEXT HOLDER
4,047,650 S.R
Enabling Works
AlHamdan Consultant
3 Months
250,000 M3
(Filling & Excavation)
AL-NAHDI 2018
Industrial City, Jeddah
Excavated Trenches
( 65 )
IMDAD- ENABLING WORKS
N IMDAD Project- Enabling work for Zone1,Zone3 and Aone4, the scope includes cleaning the site & disposal all debris, excavation works and filling of (A-1-a), (A-1-b) and A-3 (Clean Sand) materials.
( 66 )
CREET CLIENTSCREET CONTRACTING COMPANY LTD IS PROUD TO ASSOCIATE ITSELF TO DI STINGUISHED CLIENTS IN KSA AND LOOKS FORWARDS TO A LONG LASTING RELATIONSHIP WITH CURRENT CLIENTS AS WELL AS EXTENDING OUR SERVI CES TO A WIDER CLIENTELE ENFORCED BY OUR VISION OF QUALITY&EXCELLENCE.WE ARE PROUD TO HAVE THE FOLLOWING CLIENTS ON OUR LIST OF REFERE NCES:CREET COMPLETED & RUNNING PROJECTS
S.N. Project Name Location SCOPE Value (SR)
DURATION Hand Over date Status
1 Emaar Kaec Labour Village Ph-3.
KAEC Turnkey 74,000,000
22 Months March- 2020
Running
2Millennium & Copthorne Hotel Project
Jeddah Turnkey145,000,000
30 months April- 2019 Running
3 Agility Mega AC Warehouse Project
Riyadh Turnkey45,000,000
12 months Feb-2020 Running
4 Al Nahdi warehouse & service facility Jeddah Turnkey170,000,000
20 months Dec- 2020 Running
5 Industrial valle–Zone 4
KAEC Turnkey33,000,000
10 months Dec -2019 Running
6 Cement Bag IndustryKAEC Turnkey
45,000,00014 months June-2020 Running
7 Aramex Facility_KKIA
Riyadh Turnkey15,000,000
10 months July 2020 Running
8 Infrastructure for Zone 4 at Shams Al Riyadh
Riyadh Turnkey115,000,000
14 months Dec 2020 Running
( 67 )
COMPLETED PROJECTS
S.N. Project Name Location SCOPE Value (SR) DURATION Hand Over date Status
1Emaar Kaec Labour Village Ph-1, Ph-2
KAEC Turnkey 107,000,000
30 Months Dec. 2016 Completed
2Union Pipes Industries Factory
KAEC Turnkey30,000,000
12 Months Apr- 2017Completed
3
Astra Factory
AlKharj Turnkey 20,000,000
12 Months Jun-2017Completed
4Tala Infrastructure Project –phase-2
KAEC Turnkey 99,000,000 20 Months June- 2018 Completed
5 Al Rajhi bank old air port Branch Riyadh Turnkey6,000,000
7 months March-2018 Completed
6 Power Plant Rabegh Tank Refar Beshment Rabegh Service &Maintinance 100,000,000
36 Months Sep- 2019 Completed
7 Power Plant Shoaiba Tank Refar Beshment Shoaiba Service &Maintenance
100,000,00036 Months Sep- 2019 Completed
( 68 )
COMPLETED PROJECTSS.N. Project Name SCOPE Location
Value (SR)
1 Al-Fateh Sea Water Intake Turnkey Jubail 60,000,0002 Hail Mental Hospital MEP Hail 41,500,000
3 Mahmoud Saeed Can Making Factory MEP&Process Jeddah 22,000,000
4 Khumra Okam Warehouse Project MEP Jeddah 24,500,000
5 Istethmar Head Quarter Tower MEP&Fit out Riyadh 22,000,000
6 Lulu Hayper Market MEP Riyadh 22,000,000
7 Juice Factory MEP Riyadh 20,000,000
8 Yanbu Bulk Plant & Cargo Line Turnkey Yanbu 105,000,000
9 Sec Rabigh Power Plant MEP Rabegh 30,000,000
10 Madina Jet Fuel Terminal Turnkey AlMonawra 30,000,000
11 Elkhayat Red Bricks Factory MEP AlKharj 15,000,000
12 Elkhayat Red Bricks Factory MEP Sudair 15,000,000
13 El Khayat Ceramic Factory MEP Yanbu(RC) 15,000,000( 69 )
S.N. Project Name SCOPE Location Value (SR)
14 Mars Chocolate Factory MEP KAEC 10,600,000
15 Hvac Plant Ucic HVAC Jeddah 7,500,000
16 Service Contract For Overhead Cranes MEP Jeddah 6,500,000
17 Packaging Product Factory MEP Riyadh 5,000,000
18 Saudi Bin Laden Group MEP&Fit out Riyadh 4,200,000
19 Saudi Mobile Telecommunication Co (Zain)
MEP&Fit out Riyadh 6,000,000
20 Emaar Middle Est Co MEP&Fit out Riyadh 5,000,000
21 Okam Warehouse Distribution Centre Ph 1
MEP Jeddah 4,600,000
22 Swan Medical Center MEP&Fit out Riyadh 4,000,000
23 Saudi Oger Ltd Co MEP&Fit out Riyadh 3,860,000
24 King Faisal Specialist Reserch Center MEP&Fit out Jeddah 3,600,000
25 International Smart Card Factory Co MEP Riyadh 3,300,000
26 Private Villa Turnkey Riyadh 3,700,000
COMPLETED PROJECTS
( 70 )
ORGANIZATION CHARTPRESIDENT
FINANCE DIRECTOR
CHF.ACCOUNTANT
SNR.ACCOUNTANT
ACCOUNTANT
Estimation OfficerContractsDocument Control
ADMIN & HR MANAGER
AHMAD MURAD
ASST.HR MANAGER
GM
EX.SECRETRY
PR .MANAGER
PRO & AGENS
O&MLOGISTIC MANAGER
LOGISTIC COORDINATOR
OPERATIONS MANAGER
EX.SECRETRY
COST CONTROL SR.PROCUREMENT OFFICER
PROCUREMENT OFFICER
PROCUREMENT OFFICER
DOC .CONTROL
PURCHASER
ENGINEERING CIVIL
HR OFFICERS
ENGINEERING MEP HEAD
Projects Control
DRIVER
BUSINESS DEVELOPMENT
Manager
ENGINEERINGCIVIL & ARC HEAD
SECO DEP MANAGER
GOVERNMENT RELATION
SR.PR .OFFICER
PROCUREMENT ASST
PROCUREMENT MANAGER
ENGINEERINGMEP
Health & Safety Mgr.
QA/QC Mgr.
Health & Safety Engr.
Health & Safety Engr..
( 71 )
EQUIPMENT AND MACHINERY
S.N. Equipment Type Quantity
1 Forklifts 10
2 Telescopic forklift 6
3 Man lifts 12
4 Scissor Lifts 8
5 Generators 16
6 Wheel Loader/Bobcat/backhole 16
7 Cranes 4
8 Service Cars 31
9 Small Trucks 6
10 Busses 10
( 72 )
Legislation
Documents
( 74 )
( 75 )
( 76 )
Enter your subhead line here
CONTACT US
Al Murjana Tower,
Prince Sultan
Street, Jeddah,
Office no. 504.
[email protected] www.creet.com.sa+966 ( 012 ) 28 889 18