http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 2/11
Document 1 of 1
Critical elements of a disaster recovery and business/service continuity plan
References Moore, P. (1995). Critical elements of a disaster recovery and business/service continuity
plan. Facilities, 13(9), 22-22. Retrieved from
http://search.proquest.com/docview/219641993?accountid=31562
_______________________________________________________________
Abstract
Ideas are outlined for a well-designed crisis plan applicable to many corporations,
institutions, or government agencies. In the light of numerous community-wide disasters, as
well as the singular disasters that corporations, institutions, municipalities and government
agencies have suffered in the last few years, disaster recovery needs are detailed. Issues of
site assessment such as whether or not a building is occupied, repairs, fire, and water
cleanup, are discussed. _______________________________________________________________
Full Text
We all know that a well-designed, implemented and tested contingency planis the best
insurance against financial peril for any corporation, institution or organization with a future.
In the last few years we have seen the contingency planning process progress from earlier
issues of addressing primarily information services and data centre priorities, to include
equally important corporate issues involving telecommunications, human resources, vital
records, risk management, security, environmental concerns, product recovery, and the
facility itself.
The numerous community-wide disasters, as well as singular disastersthat corporations,
institutions, municipalities and government agencies have suffered in the last dozen or so
years, have shown us that planning for disaster recoveryonly is simply not enough. We must
also planfor business resumption and business continuity. We cannot expect to recover fully
and continue our business or services without planning for the recoveryof the facility which
houses the business or service operations and which provides the environment in which the
business units and processes operate.More often today it is the facility manager, risk manager, administrator, or director of security,
or safety who are being asked to complete the plan--to address issues far beyond the
recoveryof the data centre or information services alone. These additional issues also directly
affect the bottom line, including business interruption and loss of market share and
stockholder confidence. They can include not only the physical recoveryof the facility, but
such critical disaster recoveryand business continuity issues as:
* emergency response plan;
* emergency notification procedures;* emergency relocation procedures;
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 3/11
* emergency access control and security;
* emergency acquisitions and authorization;
* emergency command centre requirements;
* hot site-cold/site--warm site requirements;
* asset management and retrieval;
* product and distribution recovery;
* vital records recovery;
* telecommunications recovery;
* electronics recovery/restoration;
* hazardous contamination;
* environmental compliance;
* health and safety issues;
* insurance loss documentation.
Where do you begin? No planis more important than that for human health and safety.Singular and community-wide disasters
You must write your planso that your recoveryprocedures and processes can be switched
instantly from one disasterscenario to the other. For example, the same resources on which
you depend to respond to your needs from a singular disastersuch as a fire or water damage
at your building, must be able to respond equally well to your needs in a community-wide
disaster. How thoroughly have you identified and prequalified your resources and alternatives
in this area? It would be helpful to discuss with your facilities their own disaster recovery
plansto see whether or not they are going to be able to respond if they are disabled by thesame geographical disasterwhich affects you.
You will have major notification, mobilization and acquisition concerns that may be more
difficult to address in a community-wide disasterthan in a singular one. Your planning
process must identify your needs and resources in both situations. Make sure your
prequalified resources are able to respond 24. hours a day, seven days a week, and your
contacts with them are updated. If they are local resources only, make sure they have a
regional or national arm of their company that can come in to assist them in assisting you, or
in providing you with the necessary supplies if they are affected by the same disaster. For
example, if you are housed in a building with considerable glass, you may want to have all
your glass premeasured, and then store the measurements in your glass company's
computer, with a backup facility with this information elsewhere. You will also want to make
sure that your labour resources can supply the necessary skilled labour, as well as general
labour. Always consider singular, communitywide and hazardous material incidents when
qualifying facilities and their capabilities.
Notification procedures
Some of the critical notification concerns you must address involve determining who gets
notified, how they are they notified (and you must consider whether or not the telephone lines
are operable) who notifies them, how often your notification list is updated, where a copy of
that notification list is kept (always keep a backup copy off-site) and what mobile
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 4/11
communications equipment you will need to provide in advance.
In addressing notification concerns, it is also important to have an updated listing of which
facilities you own, lease space in, or are joint ventures. This information is critical in
understanding who has legal responsibility for the physical recoveryprocedures and costs
involved. For example, if you lease space in a building which has just suffered damage, your
priorities, including retrieval of your critical contents such as vital records, etc., at that
particular location, may not have been addressed in that building owner's plan. There could
be a serious delay in the recoveryprocess. It is important to address these issues in advance
and have thorough disaster recoveryprocedures in place at all locations.
Delayed access
Plansshould not be written with the assumption that the moment the fire is put out, or the
water contained, the building can be occupied immediately. When damage occurs, and once
the glass is stabilized, there can be a need for assessment of structural integrity, forensic
investigations, or testing for toxic contamination, and this can delay re-entry into your facility.Allow for at least a 24-72 hour delay in accessing your facility when you write your plan. If
hazardous materials are involved, you may not have access to your building at all for several
weeks or longer. If you do not allow for delayed access, and it occurs, your disaster recovery
planwill not work.
Also identify in advance those areas of the building that you would need priority access to in
order to do an initial emergency damage assessment. Establish a dialogue in advance with
the proper authorities, and perhaps, depending on the type of damage involved, it may be
possible for you to go in to the building, under proper escort, and assess certain specifiedareas fairly quickly. This would provide you with initial assessment information, allowing you
to activate certain areas of your disaster recovery planmore quickly.
Site assessment
A planfor assessing the damage should address not only dealing with delayed access
situations, but also whether or not special certifications will be required for entry into the
building owing to hazardous contamination. Depending on the type and level of non-routine
contamination such as polychlorinated biphenyls (lubricants), asbestos, lead, cadmium,
mercury, etc., many government agencies require not only special protective gear, but
special training to enter a contaminated or suspected contaminated site. You must comply
with these regulations and training. Identify and prequalify in your planthose internal or
external individuals who will provide the emergency response protocol, as well as the site
assessment for you, and make sure your compliance documentation is up to date.
It is also important to keep a current inventory of any hazardous chemicals materials you
may have on site, facility by facility, and make sure you are in compliance with agency
requirements. Your disaster recoveryplanning process must allow access to this information
immediately.
In addition to the normal structural repair and fire and water damage clean-up concerns, you
may also be faced with corrosion, mould and mildew, hazardous contamination and microbial
contamination. In the event of fire, heat and soot are generated, and areas of the building
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 5/11
you assume may be unaffected directly from the fire can still suffer damage. The initial
damage assessment should always address both indirect as well as direct fire-damage
areas.
Contamination, such as fire combustion by-products, may lie hidden behind the obvious
physical damage to the structure. These by-products are locked into the soot which
condenses on all cool surfaces. For example, when heated, PVC generates hydrogen
chloride gas. This gas, combined with water, forms hydrochloric acid, a very corrosive
chemical.
Other building materials can form sulphates and nitrates. A common cushion material,
polyurethane foam, yields hydrogen cyanide when burned. Even fire-extinguishing chemicals
can generate such by-products as hydrochloric acid, hydrofluoric acid and hydrogen bromide.
Since each fire leaves its own unique chemical fingerprint in the soot, the chemical
components are determined by what has burned, in what quantities, and under what
conditions.Water associated with floods or fire suppression can carry contaminants also. Inorganic salts
from building materials and atmospheric particulate matter can be deposited on exposed
circuit boards. Also, chilled-water systems often contain glycol, which can adversely affect
certain types of paper and magnetic media. The water's ionic content, acidity, suspended
solids, and organic content should be analysed.
Indoor air-quality issues such as proper decontamination of heating, ventilating and air-
conditioning systems must also be addressed to prevent future growth of microbial
contamination and sick building syndrome.A thorough site assessment is critical in determining not only the extent of damage, but the
time-frame and cost for recovery. Although an emergency site assessment of the critical and
priority areas and contents of your building may be accomplished within several hours, it may
be several days before the true extent of damage is identified. Assessment of contaminated
sites will take even longer owing to the time-frames involved in analysis of test samples, and
in some cases it may be as long as a week or longer before you actually know when you can
re-enter to the facility, and that return depends on the levels of contamination and time
allocated to decontamination.
Relocation
At what point do you temporarily relocate your employees and processes, and in what
timeframe must you consider a permanent relocation? Your organization probably has a plan
in place to bring up your critical business applications off site, but where will you relocate the
remainder of your business units, and what are the time-frames in which you must do this? It
is important to identify in advance not only the specific building or buildings you will utilize,
but whether they can provide minimum requirements in the following areas:
* Sufficient square footage, What is the minimum amount of space you will need for each of
your departments to function! Which departments will need to be in close physical proximity
to one another?
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 6/11
* Voice/data communications, Does your new site provide you with the necessary capacity,
circuits, etc.?
* Security. Does the new site offer you the potential for a secure environment? What
additional security provisions would you need at this new site?
* Fire protection. Is the building properly configured to meet your minimum requirements?
* Environmental controls, Can the building meet your needs for clean room, data centre, vital
records area, etc., environment?
* Production area, warehouse space, chemical storage area, shipping and receiving
capability. What are your minimum requirements in these areas, and can the new site
provide them?
* Parking and public transport, What are your minimum requirements regarding parking and
public transport, and can your employees or customers easily get to your new location?
Where do they park?
* Compliance. Regulations regarding disabled access. Will your new site meet theserequirements immediately?
* Employee needs. If you are presently providing food access and/or day care at your facility,
will your new site have the same capabilities?
If your building is the only one affected by the disaster, then there will probably be facilities
into which you can move fairly quickly, but will they allow you an effective business recovery
and continuity In a community-wide disasteryou will have many companies vying for the
same square footage and supply needs. Begin identifying alternative facilities, costs involved
in acquiring alternative space, and legal arrangements that must be put in place foracquisition. Do not identify an alternative site in close proximity to your existing one. There is
a very good chance that this close alternative site could be affected by the same
geographical disturbance as your existing facility.
Security
Does your facility security planaddress disaster recoveryconcerns For example, would you
need backup security in the event of a major disasterat your building? Have your prequalified
resources in this area interacted in advance with your in-house security team to prepare for
protecting the facility and its contents during the recoveryand restoration phase? Have you
identified, for example, those specific floors or contents which will require special security?
Will your everyday security access identification be sufficient when you have numerous
outside personnel in your facility, and under different conditions? Special identification is
strongly recommended, perhaps badges--with a special code or colour that can be changed
daily, and identifies those locations accessible by that particular badge for those in your
facility during the recovery. An important part of the preparedness process is to review your
everyday security measures to see if they will work equally as well in a disastermode.
Emergency authorization procedures
As you review your list of emergency supply and acquisition requirements, also consider who
can authorize major emergency purchases, at what monetary levels those authorizations
change and if the authorized individuals will be available when you need them. Set
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 7/11
procedures in place with backup authorization to help facilitate recovery.
Special accounting procedures may be needed for emergency purchases. For example, it will
be important for you to document that these purchases had to be made as a result of the
damage that occurred, or, that in order to make the building tenable you had to keep it open
for 24 hours so that the proper personnel could perform necessary repair and restoration,
thus increasing your utilities and labour costs for that period of time. Whether you have
insurance coverage or are self-insured, it is your responsibility to help mitigate the loss.
Insurance
Insurance plays another major part in your disaster recoveryand business continuity plan,
and it will be important to interact very closely with your risk manager or insurance
coordinator (terminology differs from company to company). This individual can provide you
with information on the coverages in place for both owned and leased properties, including
the building, betterments and improvements, foundation, machinery and equipment, and
stock and supplies. In addition to property coverage, most commercial facilities carry someform of business interruption insurance, and this coverage is usually on an actual loss
sustained basis. Another coverage often provided is extra expense, which covers the
reasonable cost incurred to operate the business as nearly normal as practical during the
restoration period.
Public relations
All too often, the individual(s) who is (are) to act as the corporate or institution
spokesperson(s) has (have) not been identified in the plan, or if they have been, identification
of the individual(s) has not been communicated thoroughly to all employees. In addressingpublic relations or public affairs information, it is critical to understand that you must address
not only media relations, but also internal and community-wide relations. There must be a
clear-cut line of communication to the designated spokesperson(s), as well as specific
instructions on how and when the individual(s) can be reached.
In addition to the media, it is equally important to address internal public relations so that
your employees will feel comfortable with the way the recoveryis being handled. For
example, it will be important to let them know quickly that, although your business has been
interrupted, they will still receive their pay cheques. Information on how and when this will
take place should be issued immediately.
If your organization has a high profile in the community, it will be important, for example, to
let those community leaders know what your plansare for continuing your community service.
The designated spokesperson(s) should be responsible for communicating all necessary
information.
Command centre requirements
It is generally recommended that you have two disaster recoverycommand centres, along
with an incident command cenrre. If your responsibilities include equipping these centres,
there follows a list of some of the items which should be included. One centre is normally
dedicated to the recoveryof the business operations, and a second command centre would
manage the actual recovery:
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 8/11
* Command centre for recoveryof business operations will normally require a subset of
current operational equipment, such as local area networks, sufficient communications,
including telephones, terminals, and shared print capability, such as high-speed laser
printers, fax machines (individual or a fax pool), sufficient cabling, etc. These equipment and
capacity needs will be driven by your current business operations. You will also need
cubicles, furnishings, lighting, and will want to set up desk supply kits for recoveryteams so
that they can be functional immediately. Of course, food and showering facilities must be
available.
* Command centre for managing the recoveryshould include the necessary configured
computer equipment, including: PCs, printers; fax machines (outgoing and incoming);
software to manage the recovery; a news intercept program; paper forms for itemizing
problem issues and resolutions (separate forms for each); wall boards to track the progress
of the recoveryteams and to list problem areas; a building board specifically for facility
restoration issues; and an environmental board on which you can track transportationexposures and utility issues. Sufficient communication equipment will be critical and should
include telephones (or least one shared incoming line and one outgoing line per emergency
operations centre member, monitors, scanners, television and video recorder, radio, pagers,
cellular phones, and any other equipment which is specific to your company's recovery).
Many company recovery plansalso include planning for a "war room" which is fully equipped
to handle voice and data, has a subset of the necessary computer equipment, radio,
television and video recorder, news intercept, and in many cases includes a direct link such
as an intercom to the other two command venues. This war room is normally occupied bysuch individuals as the chief executive officer, risk manager, legal counsel, and public affairs
officer.
The command centre or war room might be set up in advance, fully equipped and utilized
during normal business operations as a regular conference room. Most important of all, there
must be an area designated for your emergency operations centre (how ever many you
have), and you must know and planin advance what your requirements for operating the
centre(s) will be. You will, of course, have already determined what your own facility
management and security incident command centre will require.
Vital records recovery
Although most of your vital records may be backed up and stored offsite, your facility
probably houses numerous paper records containing information critical to the continuation of
your business. Those documents could include: vendor contracts; manufacturing
specifications; architectural drawings; medical records; personnel files; permits; building
engineering drawings and updates; material safety data sheets; fire safety evacuation plans;
government agency compliance documentation; asset inventories; equipment operating and
repair reference manuals; plant management and reporting data etc.; as well as archival
documents which are required through legal retention schedules to be saved for specific
periods of time industry by industry.
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 9/11
In addition, what work in progress, which is not backed up and stored off site and is critical to
the continuity of your business, remains in your facilities each night? How, for example,
would you planfor the recoveryof your claims files, litigation files, research and development
information, accounts receivable, financial information such as your general ledger, etc.?
Electronics recovery
In many cases, business resumption depends on the availability of electronic equipment and
data. Loss of these critical elements such as operating systems, applications, databases and
files can seriously affect a company's ability to resume and continue its business. Quick and
proper response in dealing with the affected equipment is critical to restoration.
A critical component of your disaster recovery planwill be your electronic data processing
(EDP) inventory. Just as with all your other vital record, you will want to have a backup copy
of your hardware, software and communications inventory stored off site. You will also want
to make sure that it is updated as new equipment is brought in to your facility. A thorough
EDP inventory will identify not only the manufacturer's name, model, serial number and anyspecial configurations, but also the physical location of the equipment. In recovering from a
disasterit will be important for you as the facility manager to know where the critical
equipment is located, and your disaster recovery planshould not only identify this, but should
allow you access to this information whenever needed.
It will also be important to prequalify your electronics and telecommunications restoration and
replacement vendors in advance. You want to make sure that proper emergency measures
are employed to mitigate the damage. If the equipment cannot be restored and recertified,
you want to make sure you have sufficient lead time for replacement items.Management's commitment
As we review this partial list of concerns which must be addressed (and we have not even
begun to address in this article the critical area of information systems, telecommunications,
establishing a crisis team and their tasks), it is easy to see the amount of man-hours which
will be involved in accomplishing the development of the plan. As time is money, how
important is this planning process?
We must understand the true nature of cost of risk to an organization. While the term cost of
risk is often used by today's risk management world, it is often less understood by disaster
recoveryor business recoverypersonnel, or by their senior management. In a broad sense,
cost of risk is a way of measuring a company's degree of risk by examining several of its
worst possible loss scenarios. Once identified, these scenarios should be communicated to
senior management so they, too, can begin to see and support the value of risk management
and disaster recoveryplanning co-ordinating efforts. Failure to support these efforts can
directly affect the company's bottom line.
A well-designed,--implemented and--tested contingency planis a teamwork effort. Through
thorough input from the managers of the areas we have discussed here, as well as others
(including the possible use of external consultants) and utilization of the proper analysis and
software planning products, you can accomplish this enormous, but necessary task, and you
will be able to respond to unexpected circumstances and their requirements for business
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 10/11
resumption and business continuity.
Application questions
(1) Has your organization identified which vendors may need access to your facility after a
disaster? Have proper identification systems been pursued to ease their access during a
short time-frame?
(2) If your internal security team was overwhelmed during a facility emergency, what
additional resources in your community could you access? What if every local business was
attempting to hire from the same pool of resources?
(3) Who has access to your facility blue prints? What if that person was not available during a
disaster?
Pat Moore is Vice-President of Business Continuity Education for Strohl Systems, based at
King of Prussia, Pennsylvania, USA. Strohl Systems and its global network of distributors
provide disaster recovery, business continuity, and business impact analysis software and
consulting services.
_______________________________________________________________
Indexing (details)
Subject Security;
Contingency planning;
Guidelines;
Disaster recovery
Classification 5340: Safety management, 5100: Facilities management, 9150:Guidelines
Title Critical elements of a disaster recovery and business/service continuity
plan
Author Moore, Pat
Publication title Facilities
Volume 13
Issue 9,10
Pages 22
Number of pages 6
Publication year 1995
Publication date Aug 1995
Year 1995
Publisher Bradford
Publisher Emerald Group Publishing, Limited
Place of publication Bradford
Country of publication United Kingdom
Journal subject Building And Construction
ISSN 02632772
Source type Scholarly Journals
8/3/2019 Critical Elements of a Disaster Recovery
http://slidepdf.com/reader/full/critical-elements-of-a-disaster-recovery 11/11
Language of publication English
Document type PERIODICAL
Subfile Security, Guidelines, Disaster recovery, Contingency planning
Accession number 01098521
ProQuest document ID 219641993
Document URL http://search.proquest.com/docview/219641993?accountid=31562
Copyright Copyright MCB University Press Limited Aug 1995
Last updated 2010-06-09
Database ABI/INFORM Complete
<< Link to document in ProQuest
_______________________________________________________________
Contact ProQuest ©
2011 ProQuest LLC. All rights reserved. - Terms and Conditions