Page 1: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

1

Page 2: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

Horizon Power has undertaken long range modelling and forecasting of each of its microgrid networks.

The new LCOE where determined based on a Greenfields site to determine lowest cost of a supply solution overlaying the cost curves

Challenges still on fixed cost and the discrepancy between flat variable tariff and a new structure that appropriately reflects the fixed cost recovery

2

Page 3: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We hear a lot of talk about the volution of the electricity industry but what does that mean for us:

• We have seen distributed generation will growing to become the largest generator on the network and completely change network load profiles as we have known them for the last 100 years

• Distributed energy storage will grow and completely change network load profiles as we know them today.

• The bulk of energy dispatch on the network will come from non-industrial standard consumer electronics

• This dispatch will not be secured by a 10 year power purchase agreement with all the certainty we have built our businesses on

• No long term security• No step in rights• No liquidated damages• No dispatch profile guarantee• No spinning reserve limits• No SCADA visibility or control

• How do we address these challenges?• How do we embrace the uncertainty and still preserve power quality and reliability• What methods can we use to de-risk this future state

We will not find the answer to these questions in the way we have done business over the last century

3

Page 4: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

Rooftop Solar is cheap but creates a new set of load management, technical and intermittency challenges

We need visibility and control of DER to manage the potential for very high penetration DER and reduced costs

Feed-in Management will release more hosting capacity

4

Page 5: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We have signed up 82 customers in data gathering phase of the trials - Wattwatchers (IoT)

Customers have been gifted a Wattwatchers device and a three years subscription to the solar analytics service, plus free installation

Customers can use the smart device app to monitor their PV system performance

This is a new experience for many who have quite old systems and have never had visibility of its performance through the day.

We hope that the insights they receive through the Solar Analytics app will help them to think about the most efficient use of their solar energy

Separately metering solar PV from load on 82 premises is revealing true load which has been masked by PV for the last decade.

High quality data that is showing the effect of cloud events on individual system and en-mass across the network

How do cloud events effect the operation of the network and power station?

5

Page 6: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

You can see from this slide the location of the Wattwatchers installations

The green dots show where most of the residential population of the town is concentrated

We have achieved a good geographic spread from East to West

We have achieved the best possible geographic spread from South to North , which is the path of the prevailing winds on most days

110 properties have an existing PV system, 106 letters sent out to customers59 applications received2 expressed interest but did not apply23 no interest at all (followed-up)16 not eligible6 contacted up to 5 times but didn’t convert to an applicationEventually managed to sign up 82 participants

6

Page 7: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

The weather station is capturing Temperature and humidity, wind speed and direction, barometric pressure and sky camera images of cloud movement

High quality data that starts to build a very detailed picture of how weather affects renewable energy generation, customer load and power system operation

The slide shows how the data is collected into our database in Bentley, Perth where it is blended with advanced (smart) meter data and SCADA data from the power station

we have payed particular attention to the accuracy of time stamping to create a coincident data set that can be used for detailed analysis

7

Page 8: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We are supporting Solcast through their ARENA funded research project

Solcast are a start-up forecasting service from the Australian National University

They use the Himiwari-8 weather satellite to create a forecasting service for solar PV

We have provided Solcast with a network asset plan for Carnarvon in Geographic Information System (GIS) format and details of the longitude and latitude of each LV transformer and how much solar PV is aggregated to each transformer.

Solcast provide us with a forecasting service that estimated the impact on PV generation of cloud movements across the town

We are learning how to integrate such a forecasting service into a DER control system

We are also trying to understand the value of a forecasting service in managing high penetration PV on a microgrid network

8

Page 9: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We are investigating the use of the public internet to manage the visibility and control of DER

It is a new idea to place control of network connected generation assets into the hands of a third party cloud based service that uses the public internet as a communications channel.

We are using the Reposit Power product to provide a feed-in Management product, and have worked with them to develop new features for their existing product.

Feed-in Management is used to curtail the amount of renewable energy flowing into the network as key times of the day and mitigate the risk of pushing power station generation into reverse power and tripping.

The aim is to limit the amount of energy exported from managed systems onto the network but not limit the ability of customers to meet their own energy requirements.

It is possible to turn selected loads on and off with the Reposit product. We will investigate the usefulness of this function as a Feed-in management tool

We will also be using the Reposit product to assist in the development of our own Market Mechanism

The hypothesis is that we will be able to achieve a great level of network/system optimisation using DER if it is combined with a market mechanism where a dynamic price for buying and selling energy incentivises customers to, and duly rewarded for investing PV and energy storage.

The market mechanism will also price and reward for provision of ancillary services i.e. contributions to

9

Page 10: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

power factor correction, frequency and voltage from those DER systems equipped to do so (mostly newer inverters)

9

Page 11: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We have installed 10 new solar PV/Battery systems and upgraded 6 existing PV systems with a battery and battery inverter.

We are collecting performance data from two commercial customers and a commercial solar farm.

We will also be using the Reposit product to assist in the testing of a Market Mechanism by using a price signal as a proxy for battery discharge control

The hypothesis is that we will be able to achieve a great level of network/system optimisation using DER if it is combined with a market mechanism where a dynamic price for buying and selling energy incentivises customers to, and duly rewarded for investing PV and energy storage.

The future hope is that a market mechanism will be able to price and reward for provision of ancillary services i.e. contributions to power factor correction, frequency and voltage from those DER systems equipped to do so (mostly newer inverters)

10

Page 12: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We have built a DER Monitor and Control software stack especially for the trials, which we call DMCS

11

Page 13: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We have built a Distributed Energy Resource (DER) control solution to provide real-time visibility and management of DER to respond to changing grid conditions and network requirements.

The area shown within the red box has been built and tested and it being used in the trials

The modules outside of the red box are described in the architecture but have not been developed yet

The concept is a suite of applications (including voltage & frequency control, islanding management, phase synchronization and black start) to enable diesel off and resilient network operation in remote microgrids.

An IoT metering solution that collects and transmits electrical generation and load data in real time that is fit for purpose, reliable, secure and minimises data cleaning to maximise potential data insights.

To enable the application of advanced analytics, machine learning techniques and predictive forecasting to support Tech-Co

The ability to create and send different trading signals to the power grid to influence the supply or demand of energy.

To provide the data and systems required by customer facing interfaces for tasks such as billing, records and account management.

12

Page 14: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

The core services is a fendemental component used to run the DER trials

It consists of a relational database that combines the diverse data sets into a coincident set with relationships mapped to GIS

This is a fundamental basis for modelling the impact of weather on DER and the power system as a whole, and foundational to a dynamic hosting capacity engine.

13

Page 15: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

Machine learning – making intelligent decisions to manage DER

The machine learning is detecting patterns in the way PV systems respond to cloud events

It is learning patterns of production over the day and identifies recurring events on individual systems such as shading by a tree.

As a homogeneous set it is learning how much PV production is available from the PV systems and how much they can be relied upon to contribute both with cloud and without cloud.

14

Page 16: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

The Dynamic Hosting Capacity Engine calculates the available hosting capacity as it fluctuates during the day with changing weather conditions and fluctuating load.

It will calculate the maximum level of renewable energy that can be accommodated on the network at any given time.

This information could be used to support a Market Mechanism

Adjustable variables can be inputs derived from machine learning and an adjustable risk appetite i.e. clear blue sky equals low risk to PV generation etc.

15

Page 17: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

The Reposit Power third party DER aggregation platform groups DER systems into Virtual Power Plants

16

Page 18: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

The DMCS achieves ‘grid awareness’ through data from the Reposit Boxes

Latency is managed by calculating the DER action that is required 15 minutes into the future

In this way a latency of 5 minutes can be managed quite adequately

17

Page 19: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

This slide shows the signal path for the DER Feed-in Management tests carried out in the DER trials

The paths are colour coded to show who has responsibility for carriage and latency as described in the Service Level Agreement between Horizon Power and Reposit Power.

The Comms pathways a combination of: Fibre, Cable, WiFi, 3G & Satellite

18

Page 20: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

The plan for the future is that DMCS Backend will interface with the DER and power system ecosystems via a collection of APIs : Monitor, Control, Market Mechanism, Billing, Reconciliation and Customer data

Reposit has a fully functional Market mechanism and load control, and offers compatibility with a variety of Inverter and battery brands

Home automation systems that can respond to a price signal open up a realm of possibilities for load management and a bridge to DER via the emerging home automation market

Or we can open up to specific brands for single features such as Feed-in Management or discharge at a specific price

The DER market is evolving quite rapidly and by positioning ourselves behind an API we are shifting the competitive tension down to the product level which is better for consumers and giving ourselves the maximum opportunity to respond to shifts in technology

19

Page 21: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

We have already learned enough from the first eighteen months of the trials to inform a DERMS package procurement process.

Horizon Power is planning for a high penetration DER future as a means to increase value delivered to customers and reduce fossil fuel consumption

The DERMS package will be used to manage the Onslow microgrid project https://www.youtube.com/watch?v=m3gIvLZt_Kc

Horizon Power is offering Onslow customers exclusive DER packageshttps://horizonpower.com.au/solar/onslow-renewable-energy-pilot/?gclid=Cj0KCQjw_r3nBRDxARIsAJljleGOHRqpkFvN0lohvOFHd8jWTKFquBXDlHwCEcXLHO9P-lYKBho7asYaAuJFEALw_wcB

20

Page 22: CRN DER Trials Update ESCI-KSP submission...Title Microsoft PowerPoint - CRN DER Trials Update ESCI-KSP submission.pptx Author H086189 Created Date 5/31/2019 8:52:26 AM

When considering the rapid changes underway in the electricity industry it is always helpful to adopt a growth mindset when seeking to understand the views and opinions of engineers and those responsible for the safe delivery of electricity to our customers, and how our customer perceive our plans to keep up with technological change and their shifting expectations.

“You never change things by fighting the existing reality. To change something, build a new model that makes the existing model obsolete.” — Buckminster Fuller

21