  • 8/18/2019 cronogramas adquisicion de materiales.pdf

    1/3

    PROYECTO:

    FECHA: JUNIO 2012

    UBICACIÓN: ALTO DE LA AL IANZA - TACNA - TACNA

    semestre 04

    1.00 CLAVOS PARA MADERA CON CABEZA DE 2 1/2" 30.24 

    2.00 CLAVOS PARA MADERA CON CABEZA DE 3" 173.11 

    3.00 ALAMBRE NEGRO#16 440.42 

    4.00 ALAMBRE NEGRO# 8 372.68 

    5.00 SOPORTE METALICOPARA 5 BICICLETAS 2,000.00 

    6. 00 SOPORTE METALICO PORTATIL PARA 5 BICICLETAS (ESTACIONAMI ENTO) 4,200. 00 

    7.00 PERNOS 1/4" X 2 1/2" INCLUYE TUERCA Y ARANDELA 985.13 

    8.00 ACEROCORRUGADOFY=4200 kg/cm2 GRADO60 7,854.17 

    9.00 TIERRA DE CHACRA 1,500.00 

    10.00 PIEDRA CHANCADA DE 1/2" 1,080.97 

    11.00 ARENA GRUESA 1,084.29  216.86 

    12.00 PIEDRA GRANDE 2.82 

    13.00 CONECTOR TIPOANDERSON DE COBRE 368.00 

    14.00 CONDUCTOR DESNUDO25 MM2 3,150.00 

    15.00 ADQUISION DE SEMAFORO LED VEHICULAR (1 CALLE, 3 LUCES) 9,900.00 

    16.00 ADQUISION DE EQUIPOS DE CONTROL DE TRAFICO 9,000.00 

    17.00 ADQUISION DE SEMAFORO LED VEHICULAR (1 CALLE, 4 LUCES) 61,500.00 

    18.00 ADQUISION DE SEMAFOROLED VEHICULAR (PEATONAL) 67,200.00 

    19.00 ADQUISION DE EQUIPOS DE CONTROL DE TRAFICO PEATONAL 57,600.00 

    20.00 INSTALACIONES ELECTRICAS 700.00 

    21.00 ASFALTORC-250 2,250.82 

    22.00 CABLEADOP/SEMAFORO( CABLE CCTB 7x14) 6,000.00 

    23.00 CABLEADOP/SEMAFORO 22,400.00 

    24.00 CEMENTOPORTLAND PUZOLANICOIP (42.5 kg) 5,135.52 

    25.00 CONCRETOP/CIMENTACION 1:8 + 25 %PM 312.00 

    26.00 CINTA SEÑALADORA B-T 375.00 

    27.00 MALLA PLASTICA FAENERA ALTA DENSIDAD (NARANJA) 3,795.25 

    28.00 CINTA DE SEGURIDAD C/AMARILLOX100M 6,000.00 

    29.00 GIGANTOGRAFIA 3.6 x 2.40 M 800.00 

    30.00 MASILLA 9.60 

    31.00 MONUMENTODE FIBRA DE VIDRIO, INCLUYE BASE DE CONCRETOSEGUN DISE 15,000.00 

    32.00 SILBATO 50.00 

    33.00 CASCODE SEGURIDAD 300.00 

    34.00 MALETIN 455.00 

    35.00 THOR-GEL 2,928.00 

    36.00 CORDEL DE ALGODON 200.00 

    37.00 VESTUARIO DE IDENTIFICACION DE VOLUNTARIOS (POLOS Y GORROS) 5,600. 00 

    38.00 MOVILIZACIÓN DE MAQUINARIA Y EQUIPOS 2,000.00 

    39.00 PEGAMENTOPARA TACHAS 4,360.41 

    40.00 INSTALACIONES SANITARIAS 700.00 

    41.00 BANNER 4,000.00 

    42.00 LAMINA REFLECTIVA DE ALTA DENSIDAD 816.00 

    43.00 CONODE CONTROL TRANSITOH= 100CMCON BASE NEGRA 8,160.00 

    44.00 BARRERAS PLASTICAS DE CONTENCION 2,400.00 

    45.00 MODULOPREFABRICADODE MADERA DE 4 x 8 m 6,000.00 

    46.00 UNIFORME DE IDENTIFICACION DEL PERSONAL 1,040.00  1,040.00

    8,160.00

    2,400.00

    6,000.00

    700.00

    4,000.00

    816.00

    5,600.00

    2,000.00

    4,360.41

    455.00

    2,928.00

    200.00

    15,000.00

    50.00

    300.00

    6,000.00

    800.00

    9.60

    312.00

    375.00

    3,795.25

    6,000.00

    22,400.00

    5,135.52

    1,080.97

    867.43

    2.82

    368.00

    3,150.00

    9,900.00

    9,000.00

    RENOVACION DE LAS REDES DE AGUA POTABLE Y ALCANTARILLA DO EN LA JUNTA VECINAL JORGE BASADRE GROHMANN, DEL DISTRITO DE ALTO DE LA ALIANZA

    1,020.60 479.40

    7,854.17

    61,500.00

    67,200.00

    57,600.00

    700.00

    2,250.82

    4,200.00

    6,265.75 -5,280.62

    372.68

    2,000.00

    440.42

    30.24

    173.11

    CRONOGRAMA DE ADQUISICION DE MATERIALES

    Nº DESCRIPCION MONTOP E R I O D O

    semestre 01 semestre 02 semestre 03

  • 8/18/2019 cronogramas adquisicion de materiales.pdf

    2/3

    PROYECTO:

    FECHA: JUNIO 2012

    UBICACIÓN: ALTO DE LA AL IANZA - TACNA - TACNA

    semestre 04

    RENOVACION DE LAS REDES DE AGUA POTABLE Y ALCANTARILLA DO EN LA JUNTA VECINAL JORGE BASADRE GROHMANN, DEL DISTRITO DE ALTO DE LA ALIANZA

    CRONOGRAMA DE ADQUISICION DE MATERIALES

    Nº DESCRIPCION MONTOP E R I O D O

    semestre 01 semestre 02 semestre 03

    47.00 DUCTODE CONCRETODE 02 VIAS 14,496.00 

    48.00 ESCOBA 29.70 

    49.00 BROCHA DE 4" 67.77 

    50.00 HORMIGON 83.98 

    51.00 COLA SINTETICA 360.00  360.00 

    52.00 LIJA PARA MADERA 9.00 

    53.00 TIZA EN POLVO 111.35 

    54.00 AGUA 214.08 

    55.00 TIZA DE OFICINA 41.50 

    56.00 BASURERODE FIBRA DE VIDRIO+ SISTEMA DE FIJACIÓN INCLUIDOCOLOCACIÓ 3,600.00 

    57.00 CONTENEDOR TIPOBASUREROPORTATIL DE FIBRA DE VIDRIOCON SEPARACIO 3,600.00 

    58.00 BAÑOS PUBLICOS PORTATIL 6,000.00 

    59.00 TOLDOS COMPLETOS (LONA Y ESTRUCTURA METALICA) DE 4 x 8 m 6,500.00 

    60.00 BANCA DE MADERA INCLUYE ACCESORIOS Y COLOCACIÓN 3,200.00 

    61.00 MADERA TORNILLO 38,664.99 

    62.00 MADERA TORNILLO 238.80 

    63.00 POSTES FºGº PARA SEMAFOROPEATONAL 14,400.00 

    64.00 TRIPLAY DE 4' X 8' X 4 mm 1,352.00 

    65.00 TRIPLAY DE 6 mm 4,746.51 

    66.00 CARTEL DE CIERRE DE TRANSITO 3,250.00 

    67.00 CAJA DE CONCRETO(POZOA TIERRA) 904.00 

    68.00 VALLAS DE CERRAMIENTO 600.00 

    69.00 VALLAS INFORMATIVAS 600.00 

    70.00 VALLAS DE CONTRAFLUJO 600.00 

    71.00 VALLAS DE CONTENCION 600.00 

    72.00 ESTRUCTURA METALICA PARA SEMAFORO 700.00 

    73.00 PETROLEO 1,411.88 

    74.00 THINER ESTANDAR 150.69 

    75.00 PINTURA ESMALTE 80.00 

    76.00 PINTURA BASE (5 Kg) 11.00 

    77.00 PINTURA ESMALTE ANTICORROSIVO 367.58 

    78.00 XILOL 2,091.55 

    79.00 PINTURA DE TRAFICO BLANCA 6,081.30 

    80.00 CALAMINAS GALV.DE 1.83 x0.83 448.00 

    81.00 LAMINA METALICA DE 1"X1/2" 1,920.00 

    82.00 PLANCHA GALVANIZADA DE 1/16" 1,020.60 

    83.00 POSTE DE CONCRETO 0.10 * 3.10 (SEÑALIZACION) 975.00 

    84.00 VARILLA DE COBRE d=5/8" DE 2.5m 2,914.00 

    85.00 TUBOPVC SAP (LUZ) D=35 MMx 3M 416.00 

    86.00 ADQUISICION E INSTALACION DE PANTALLA GIGANTE DIGITAL 200,605.00 

    87.00 SERVICIODE FOLLETERIA EN GENERAL 11,200.00  2,240.00 

    88.00 SERVICIODE ALQUILER DE MOVILIDAD 8,400.00 

    89.00 SERVICIODE DIFUSION (PRENSA ESCRITA) 4,600.00 

    90.00 SERVICIODE DIFUSION (PRENSA RADIAL) 6,800.00 

    91.00 SERVICIODE DIFUSION (PRENSA VISUAL) 8,400.00 

    92.00 ADQUISION DE EQUIPOS DE COMPUTO 5,000.00 

    93.00 ADQUISICION DE UTILES DE ESCRITORIO 8,400.00 

    94.00 SEÑALIZACION CON CARTELES INFORMATIVOS 7,000.00 

    416.00

    1,020.60

    975.00

    2,914.00

    6,081.30

    448.00

    1,920.00

    11.00

    367.58

    2,091.55

    1,411.88

    150.69

    80.00

    600.00

    600.00

    700.00

    904.00

    600.00

    600.00

    1,352.00

    4,746.51

    3,250.00

    38,664.99

    238.80

    14,400.00

    6,000.00

    6,500.00

    3,200.00

    41.50

    3,600.00

    3,600.00

    4.50 4.50

    111.35

    71.36 71.36 71.36

    67.77

    83.98

    14,496.00

    29.70

    5,000.00

    8,960.00

    8,400.00

    4,600.00

    8,400.00

    6,800.00

    200,605.00

    8,400.00

    7,000.00

  • 8/18/2019 cronogramas adquisicion de materiales.pdf

    3/3

    PROYECTO:

    FECHA: JUNIO 2012

    UBICACIÓN: ALTO DE LA AL IANZA - TACNA - TACNA

    semestre 04

    RENOVACION DE LAS REDES DE AGUA POTABLE Y ALCANTARILLA DO EN LA JUNTA VECINAL JORGE BASADRE GROHMANN, DEL DISTRITO DE ALTO DE LA ALIANZA

    CRONOGRAMA DE ADQUISICION DE MATERIALES

    Nº DESCRIPCION MONTOP E R I O D O

    semestre 01 semestre 02 semestre 03

    95.00 SEÑALIZACION INTERACTIVA 8,000.00 

    96.00 SEÑALIZACION CON TACHAS 121,122.50 

    97.00 OTROS 572.24 

    98.00 SEÑAL DE CENTRODE HIDRATACION 200.00 

    99.00 SEÑAL DE SS.HH. 200.00 

    100.00 SEÑAL DE CRUCES PELIGROSOS 400.00 

    101.00 SEÑAL DE DESCENSOS 200.00 

    102.00 SEÑAL DE COMIENZODE RUTA 200.00 

    103.00 SEÑAL DE FINAL DE RUTA 200.00 

    104.00 SEÑAL DE HORARIOS DE RUTA 600.00 

    105.00 SERVICIO DE CAPACITACION EN TEMAS DE MEDIO AMBIENTE Y SALUD 2,000. 00 

    106.00 SERVICIODE CAPACITACION EN TEMAS PRIMEROS AUXILIOS Y PROTECCION CI 2,000.00 

    107.00 SERVICIODE REFRIGERIODE GRUPOS DE APOYO 1,600.00 

    108.00 SERVICIODE CAPACITACION EN TEMAS DE CIUDADANIA Y CULTURA VIAL 1,000.00 

    109.00 EQUIPOS BASICOS DE REPARACION Y MANTENIMIENTOPARA BICICLETAS 1,200.00 

    110.00 MOBILIARIOBASICOPARA REPARACION Y MANTENIMIENTO 1,400.00 

    111.00 MOBILIARIOBASICOPARA INFORMACION EN GENERAL 1,200.00 

    112.00 MOBILIARIOBASICOPARA CONTROL Y MANDO 800.00 

    113.00 MOBILIARIOBASICOPARA OFICINA ADMINISTRATIVA 2,000.00 

    858,386.45 2,816.86

    2,000.00

    1,000.00

    2,000.00

    1,600.00

    1,200.00

    1,400.00

    800.00

    200.00

    200.00

    600.00

    121,122.50

    1,200.00

    2,000.00

    400.00

    200.00

    200.00

    8,000.00

    572.24

    TOTAL 321,082.48 268,769.83 265,717.28

    200.00