CROSS LAMINATED TIMBERBridging the Designer-Manufacturer Gap
Presented By: Allison Standiford October 4, 2017
Southern California Wood Solutions Fair
Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board.
The Wood Products Council is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES), Provider #G516. Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
This course is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.
Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
COURSE DESCRIPTIONThis presentation is intended for building designers interested in the use of cross-laminated timber (CLT) who want to take full advantage of its prefabricated, precise nature and potential for construction savings. Unlike some traditional wood products, interaction with the product manufacturer, on elements such as 3D building models and whole building shop drawings, is important to the design of a successful CLT structure. Topics will include CLT design considerations, including those related to cost efficiency, as well as appropriate spans, thicknesses, applications, and specifications. The design team/manufacturer relationship will also be examined, with an emphasis on what project teams can expect from design through construction, information required by each party, and appropriate outputs (e.g., drawings, calculations, specs).
LEARNING OBJECTIVES
1. Explain best practices for designing a cross-
laminated timber (CLT) building for cost
efficiency, addressing items such as spans,
thicknesses and specifications.
2. Demonstrate the typical interface between
design team and CLT manufacturer on
commercial and multi-family projects.
3. Highlight keys to successful CLT project
delivery, from drawing coordination to material
lead time.
4. Review methods of streamlining the design
team’s input on CLT projects, focusing on cost
efficiency and schedule savings.
THE PROCESS• TYPICALLY2XDIMENSIONLUMBER
•MOISTURECONTENT12%,+/- 3%•VISUALLYORMACHINEGRADED
•PLANEDFOURSIDES• FINGER-JOINTEDENDTOEND
THE PROCESS•BOARDSLOADED•PERPENDICULARLAYERS•PRESSTIME=2.5XGLUEOPENTIME
•PRESSCYCLES•PANELSREMOVEDANDSITTOCUREPRIORTOCNCMILLING
THE PROCESS• LARGEFORMATCNC
• LOADEDBYFORKLIFTOROVERHEADCRANE
•MILLINGTIMEISBASEDON- COMPLEXITY- PANELTHICKNESS- WOODSPECIES
• REACHOUTTOAMANUFACTUREREARLYANDOFTEN
• COMEPREPAREDWITHYOURPROJECTSPECIFICS
• HELPTHEMANUFACTURERUNDERSTANDYOURNEEDS
• UNDERSTANDTHEMANUFACTURER’SCAPABILITIES
BESTPRACTICES
THE ORIGINAL INTENT OF CLT• LIGHTERWEIGHT,NOTWEATHER-DEPENDENTREPLACEMENTFORCONCRETEANDSTEEL
• FULLYENCAPSULATED,UNEXPOSED
• THEINHERENTBEAUTYOFCLTLENDSITSELFTOOTHERUNIQUEAPPLICATIONS
WE ARE ALL UNIQUE• PRESSSIZES• PRODUCTCERTIFICATIONS
- WOODSPECIES- LAYUPS- STRENGTHVALUES
• PLYANDPANELTHICKNESSES• SOFTWARE• SERVICES
YOUR PROJECT• WHATAREYOUCONSIDERINGCLTFOR?
• FLOOR• ROOF• WALLS• ELEVATORSHAFTS
• WHATWILLCLTHELPYOUACHIEVE?• TIMEANDLABORSAVINGS• CLEANERJOBSITE/LESSWASTE• SUSTAINABILITY/ENVIRONMENTAL• AESTHETICS• MATERIALCOSTSAVINGS
• SPECIFICATIONSECTION• APAPRG-320PRODUCTREPORT• LOADANDSPANTABLES• TYPICALENGINEERINGSCOPE
- CONNECTIONDETAILS- PANELDESIGN/CALCS- SHOPSREVIEW
• DESIGNASSISTANCE• PRODUCTSAMPLES• FINISHOPTIONSOFFERED• LEADTIME
WHAT SHOULD YOU ASK FOR?
• PROVIDEASMUCHINFORMATIONASPOSSIBLE:- FULLSETOFDESIGNDOCUMENTS- 3DCADORREVITMODEL
• PROVIDEADIMENSIONEDCLTPLAN/LAYOUT• INCLUDEDESIGNCRITERIASUCHAS:
- SUPERIMPOSEDDEADLOAD- LIVELOAD- SNOWLOAD- MECHANICALEQUIPMENTLOAD
• CLEARLYIDENTIFYDEFFEREDSUBMITTALREQUIREMENTS
• PROVIDEAPROJECTMANUAL,SCOPEOFWORK,ORSPECIFICATIONSECTION
SeeReference3
WHAT CAN YOU DO?
WHATISREQUIREDFORTHEMANUFACTURERTOCOMPLY?• BUYAMERICANACT?• LEEDCERTIFIED,SILVER,GOLD,PLATINUM?• LIVINGBUILDINGCHALLENGEDECLAREDORCERTIFIED?• ISFSCCERTIFICATIONREQUIRED?
• WILLSFICHAINOFCUSTODYCERTIFICATIONBEACCEPTEDASASUBSTITUTION?
PROJECT REQUIREMENTS
U.S.GREENBUILDINGCOUNCIL• ALTERNATECOMPLIANCEPATHPILOTPROGRAMLEED2009LEEDv4
• ENABLESSFICERTIFIEDWOODANDPAPERPRODUCTSTOBEELIGIBLEFORLEEDCREDIT
LEED CREDIT WITH SFI CoC
INORDERTOCOUNTTOWARDALEEDPOINT,THEUSERMUSTFIRSTKNOWTHAT:1. 100%OFTHEFORESTPRODUCTS
AREFROMLEGALSOURCES(NON-CONTROVERSIAL)
2. 70%FROMRESPONSIBLESOURCES
3. THEREMAINEDERMUSTBEFROMCERTIFIEDSOURCESASEVIDENCEDBYCHAINOFCUSTODYCERTIFICATION(CoC)
LEED CREDIT WITH SFI CoC
LEEDv4“SOURCINGOFRAWMATERIALS”CREDITRESPONSIBLEEXTRACTION“SOURCING”CRITERIA• USEATLEAST25%(BASEDONCOST)OF
PERMANENTLYINSTALLEDBUILDINGMATERIALSTHATMEETONEOFTHEFOLLOWINGREQUIREMENTS:- EXTENDEDPRODUCERRESPONSIBILITY(EPR)- BIO-BASEDMATERIALS- REUSEDMATERIALS- WOODPRODUCTS- SOURCEDFROMCERTIFIEDSOURCES(SFICoC!)
LEED CREDIT WITH SFI CoC
PROJECT LOCATION• ISYOURPROJECTLOCATEDINAHIGHSEISMICAREA?
• ARETHEREHIGHWINDSTOCONSIDER?
• HEAVYSNOWLOADS?
WOOD SPECIES• REGIONALLYAVAILABLELUMBERSOURCE
• SOFTWOODVS.HARDWOOD
• SPECIFYINGACERTIFIEDLUMBERSPECIESMAYLEAVEYOUWITHONLYONEMANUFACTURER
• WHATISPRG-320ANDWHYISTHISIMPORTANT?
• ISAPRODUCTCERTIFICATIONREQUIREDFORYOURPROJECT?
• WHATARETHEMANUFACTURER’SCERTIFIEDLAYUPSANDWHATARETHEIRAPPLICATIONS?
SeeReference3
APA PRG - 320 CERTIFICATION
ANSI/APA PRG - 320 CERTIFIED LAYUPS
3PlyALTConcentratedstrengthinthelongaxisLIGHTBEARINGANDNON-BEARINGWALLS
4PlyMAXXEqualstrengthinthebothaxes’WALLS/SHORTFLOORSPANS/TYPICALROOFSPANS
5PlyALTConcentratedstrengthinthelongaxisHEAVYBEARINGWALLS/SHORTFLOORSPANS/NORMALROOFSPANS
5PlyMAXXConcentratedstrengthinthelongaxisSHORTFLOORSPANS/NORMALROOFSPANS
7PlyALTConcentratedstrengthinthelongaxisLONGERFLOORSPANS/LONGERROOFSPANS
7PlyMAXXConcentratedstrengthinthelongaxisLONGERFLOORSPANS/LONGERROOFSPANS
9PlyALTConcentratedstrengthinthelongaxisLONGESTFLOORSPANS/LONGESTROOFSPANS
9PlyMAXXConcentratedstrengthinthelongaxisLONGESTFLOORSPANS/LONGESTROOFSPANS
CODE• MANUFACTURER’SPRELIMINARYENGINEERINGEVALUATION
• WHEREHASCLTBEENSUCCESSFULLYUSEDINYOURJURISDICTION?
• 2015IBC,LOCALCALIFORNIACODE2016CBC
• WHATISTHECLTENTRYPOINTPERCURRENTCODE?
STARMILL- AMERICANFORK,UTAH• 2012IBCJURISDICTIONOROLDER
• CLTNOTOUTLINEDINCODE• SMARTLAMPROVIDED:
• ENGINEERINGREVIEW• PANELDESIGNANDCALCS• SHOPDRAWINGS• CONNECTIONDETAILS
• NODEFERREDSTAMPEDSUBMITTAL
ALTERNATE MEANS AND METHODS
• WHATISTHETYPEOFCONSTRUCTION?
• WHATISTHEFIRERATING?• WHATTESTING/CERTIFICATIONISREQUIRED?
• DOYOUPLANTOLEAVETHECLTEXPOSED?
FIRE RATINGS
NationalDesignSpecification forWoodConstruction2015EditionChapter16
CLTDesignHandbook Chapter8Figure7
FIRE – CHAR CALCULATIONS
• HOWCANYOUREACHTHEREQUIREDSTCANDIICRATINGSFORYOURPROJECT?
• WHATTESTINGHASTHEMANUFACTURERDONETHATISSPECIFICTOTHEIRPRODUCT?
• WHATASSEMBLYISRIGHTFORYOURPROJECT?
SOUND
• CODEMINIMUM=“NOTLESSTHAN50,45IFFIELDTESTED”• ACCEPTABLEVERSESPREFERRED• LABTESTINGISTYPICALLY3-5POINTSHIGHERTHANFIELDTESTING
SeeReference17
SOUND
HOWDOIGETTHEBESTBANGFORMYBUCKWITHCLT?
q PRG-320CERTIFICATIONq FSC/SFICHAINOFCUSTODYCERTIFIEDq FIRETESTINGq SOUNDSTESTINGq WOODSPECIESq SERVICESq PROXIMITYTOPROJECTLOCATIONq LEADTIME/AVAILABILITYTODELIVERONYOUR
TIMELINE
UNDERSTANDING CLT COSTS
UNDERSTANDING CLT COSTS• LARGESTPANELISA10’X40’
• MOSTEFFICIENTPANELISA10’X40’
• LEASTEFFICIENTPANELISA6’X21’
• BUILDINGLIFECYCLECOSTSVERSESACOSTPERSQUAREFOOT• DEVELOPERBUILDANDHOLDMODELRATHERTHANBUILDANDFLIP• EACHPROJECTISUNIQUEANDWILLHAVEITSOWNCOSTPARAMETERSTOEVALUTE
UNDERSTANDING CLT COSTS
• GLULAMMANUFACTURER• STEELFABRICATOR• MECHANICAL/ELECTRICAL/PLUMBING• CONCRETE:EXTREMELYIMPORTANT!
- CONCRETEFOUNDATIONSMUSTBESQUAREANDLEVEL
- CONTRACTORPERFORMSAFOUNDATIONSURVEY
- SUPPLIESASBUILTDIMENSIONSTOMANUFACTURER
COORDINATION WITH OTHER TRADES
• LEGALLOAD• OVER-DIMENSIONAL• SUPERWIDELOADS• STATEESCORT+$$• POLICEESCORT+$$$$
SHIPPING & LOGISTICS
• LOADSEQUENCINGANDINSTALLATION
• PICKINGDIRECTLYFROMTRUCKORSTAGINGONSITE
• TRUCKHOLDTIME• CRANETIME
SHIPPING & LOGISTICS
INSTALLATIONINFORMATIONTOSHARE:• SITEPLAN• CRANEPLACEMENT• WHEREAREYOUSTARTING?• HOWAREYOULIFTING?QUESTIONSTOASK:• LIFTINGHARDWAREOPTIONS• PICKPOINTLOCATION• INCREASINGSPEEDONSITE
• 3-4CREWMEMBERS• 1CRANEOPERATOR• 30MINUTESPERPANEL• 3PANELSINPROCESSATALLTIMES
- ONEBEINGFASTENED- ONEFLYINGINTOPLACE- ONEBEINGPREPPEDFORLIFTING
INSTALLATION METRICS
MAINSTRUCTURE:• WALLS• FLOORS• ROOF• SHAFTS• FEATURESTAIR• 260CLTPANELSBUSBAYCANOPY:• 44CLTPANELS
TRANSPORTATION CENTER
CHALLENGES:• #1COMMUNICATION• BUYAMERICANACTPROJECT• BASISOFDESIGNNOTU.S.• CERTIFIED9PLYPANEL• FOUNDATIONISSUES• WOODSPECIES
TRANSPORTATION CENTER
RESULT:• COMMUNICATION• MULTIPLERFIs• EXTENDEDSHOPSDEVELOPMENTSTAGE• PANELTHICKNESSESCHANGES• APACERTIFICATION• FOUNDATIONALTERATIONS• SCHEDULEDELAYS• FRUSTRATION
TRANSPORTATION CENTER
• APPROXIMATELY54,000SF• 8STORIES• CLTFLOORS,WALLS,ROOF• DESIGNTEAMREACHEDOUTTOA
SPECIFICMANUFACTURERINEARLYCONCEPTUALDESIGN
• CONDUCTEDANEFFICIENCYSTUDYBASEDONTHEMANUFACTURER’SRECOMMENDATIONSANDCAPABILITIES
• RECOGNIZEDTHATMAXIMIZINGPANELSIZESMINIMIZESPRESSANDCNCMILLINGTIME
SeeReference26
SLIVER PROJECT-TULSA, OK
COMMUNICATION IS KEY
• COMMUNICATIONOFGOALS
• COMMUNICATIONOFCAPABILITIES
• COMMUNICATIONOFEXPECTATIONS
• COMMUNICATIONOFSUCCESS
CONVERSATION PLINTH-COLUMBUS, INDIANA
• REACHOUTTOAMANUFACTUREREARLYANDOFTEN
• COMEPREPAREDWITHYOURPROJECTSPECIFICS
• HELPTHEMANUFACTURERUNDERSTANDYOURNEEDS
• UNDERSTANDTHEMANUFACTURER’SCAPABILITIES
BESTPRACTICES
AllisonStandifordArchitecturalSales&ProjectManagement
SmartLam,LLC.(406)892-2241
QUESTIONS?
REFERENCES1. http://www.transplace.com/best-practices2. http://www.jpcarrara.com/products/hollowcore.aspx3. http://smartlam.com/4. https://www.google.com/imgres?imgrefurl=http://www.inspectmyhouse.ca/house-inspection-toronto-tips-
tricks/&tbnid=OTf_GH2bQjj4jM:&docid=icx5YIYCA3V02M&h=400&w=800#h=400&imgrc=OTf_GH2bQjj4jM:&w=8005. http://www.guardianscu.coop/rates/6. https://www.google.com/maps/@38.9945678,-101.1174644,3.13z?hl=en7. https://www.shutterstock.com/search/earthquake8. http://www.visualphotos.com/image/1x6050400/hurricane_damage_to_rendlesham_forest_england9. http://wallpaperswide.com/tornado-wallpapers.html10. http://picssr.com/photos/12329819@N06/page5?nsid=12329819@N0611. https://www.iccsafe.org/wp-content/uploads/stateadoptions.pdf12. http://codes.iccsafe.org/app/book/content/2015-I-Codes/2015%20IBC%20HTML/Chapter%206.html13. 2110 Commerce/Brewery Lofts- Developed by Horizon Partners, FLYNN Architecture 14. http://www.awc.org/pdf/codes-standards/publications/nds/AWC-NDS2015-ViewOnly-1603.pdf (pg.152)15. http://www.seattle.gov/dpd/cs/groups/pan/@pan/documents/web_informational/dpds021903.pdf (chp.8, fig.7)16. http://www.maxxon.com/acousti-mat_i/data17. http://pre02.deviantart.net/1845/th/pre/i/2012/094/f/9/buy_american_act_product_compliant_list_by_dahlbek1-d4uyq11.jpg18. http://www.usgbc.org/leed19. https://living-future.org/lbc/20. https://us.fsc.org/en-us21. http://www.sssystems.pl/en/about/what-we-do/22. http://www.different.com.mk23. Photo courtesy pf Garco Construction24. Photos/Design courtesy of David Stahl, Principal, Cunningham Group Architecture, Inc., special thanks.25. http://wonderfulengineering.com26. http://www.businessinsider.com/most-bizarre-buildings-around-the-world-2016-127. http://www.architectmagazine.com/technology/detail/kaeng-krachan-elephant-park-shell_o28. Photo courtesy of Goodfellow, Inc., Ontario, special thanks. 29. Photo/Design credit- Jacobs/TCC Enterprises-Greenville TAC, special thanks.30. YOUR PROJECT: http://construction.keysschools.schoolfusion.us/modules/groups/integrated_home.phtml?gid=1574194&sessionid=449923fa7278ffa13bd6e46ffbf682fa31. Photo/Design credit- IKD, Yugon Kim- Columbus Indiana Conversation Plinth, special thanks.