  • SOY OIL PROCESSING INDUSTRYPRESENTED BY: MALAYSIA BOLEH RESEARCH & CONSULTANCY

  • MALAYSIA BOLEH RESEARCH & CONSULTANCY

  • MR. MOHD HILMI MOHD IDRIS MS. ADLINA SNAWI MR. MUHAMMAD SUFFIAN AHMAD MR. ABDUL MAJID IBRAHIM MR. SHAHRUDDIN KASSIM MR. ZAKARIA ABU HASAN MR. FAZIL MAT ZAIN MS. ZURAIDAH KORNAIN MS. ZAUYAH TARMIZZI MR. MARZUKI ZAINAL ABIDIN

    MALAYSIA BOLEH RESEARCH & CONSULTANCY

  • PROCESS FLOW DIAGRAM

  • Process Flow DiagramTestingYardBig SilosDay SiloscreenerDe-StonerCrackerCookerFlakersDryerExtractorEconomiserEvaporatorStripper Cum DryerStorage TanksCRUDE OILDT-DCScreenerLump-crusherOversized lumpMixing & PackingStorage TanksDOCcycloneWET DOCPREPARATORY SECTIONSEED UNLOADING & CLEANING SECTIONSOLVENT EXTRACTION PLANT

  • TestingYardBig SilosSEED UNLOADING & CLEANING SECTION

  • Day SiloscreenerDe-StonerCrackerCookerFlakersDryerPREPARATORY SECTION

  • ExtractorEconomiserEvaporatorStripper Cum DryerStorage TanksCRUDE OILDT-DCScreenerLump-crusherOversized lumpMixing & PackingStorage TanksDOCcycloneWET DOCSOLVENT EXTRACTION PLANT

  • MATERIAL FLOW DIAGRAM (Hexane)

  • ExtractorEconomiserEvaporatorCondenserDT-DCCyclone(Miscella+Hexane)Stripper Cum Dryer(Jet + Chiller)Water-Solvent Separator

    Loss Material Flow DiagramDOCMISCELLASOLVENT EXTRACTION PLANT

  • MAJOR WASTE STREAMS/AREAS OF LOSSES

  • MAJOR WASTE STREAMS/AREAS OF LOSSES

    PROCESSPLACES/AREASWASTE/LOSS1TransportationConveyor & Bucket Elevator Seed Husk Stone 2Big Silo to Day Silo3Preparatory SectionDay Silo to Screener Cracked Seed Dust Husk 4De-Stoner Mud Balls Stone5Mechanical CrackerNIL6Condensed the soy seedCooker Steam Water 7FlakingFlakers Soy Seed8DryingDryerNIL

  • MAJOR WASTE STREAMS/AREAS OF LOSSES

    PROCESSPLACES/AREASWASTE/LOSS9Solvent Extraction (Crude Oil Production)Rotary Type Extractor (RTE) Hexane10Distillation Hexane11Stripper Hexane12Condenser Hexane13Water/Solvent Separator Waste Water Hexane14DesolventDT-DC(De-Oiled Cake Production) Hexane Moisture Heat15Cooling Moisture Heat16SeavingNIL17PackagingNIL

  • FISHBONE DIAGRAM

  • MANMETHODMACHINEENVIRONMENTFISHBONE DIAGRAM

    Hexane LossMATERIALHigh humidityPoor air qualityProcess control not effectivePoor equipment calibrationNo standard operating procedurePoor soy seed qualityPoor hexane qualityPoor steam qualityHuman errorLack of trainingLack of motivationInefficient machineDT-DCRTEJetconRTEChiller condenserEconomiserStripper(Dryer)Hexane/water seperatorEvaporatorHexane supply systemHexane recovery systemLeakage

  • PROPOSED GP OPTIONS

  • GP OPTIONS

    GP OPTIONDESCRIPTION1NEW EQUIPMENT Up to date & efficient machine Upgrade Total Preventive Maintenance2NEW MATERIAL/ CHEMICAL Replace Hexane (hexane is hazardous to health, substitute with more environmental friendly chemical) Better quality of soy seed3ALTERNATIVE SUPPLIER To supply better quality of soy seed4METHODOLOGY Develop Standard Operating Procedures (SOP) Implement EMS (ISO 14001) Equipment calibration

  • GP OBJECTIVES & TARGETS

  • GP CONSULTANCY REPORT BY MALAYSIA BOLEH TEAMSOY BEAN OIL REFINING PROCESS

    GP CONSULTANCY REPORT BY MALAYSIA BOLEH TEAM

    SOY BEAN OIL REFINING PROCESS

    1

    2

    3

    4

    5

    6

    OBJECTIVE

    TARGET

    PROGRAM

    ACTION

    RESPONSIBLE PERSONS

    TIME

    FRAME

    1.1 Minimise Hexane Usage

    2.1

    Reduce consumption by 10% within one (1) year

    3.1.1

    Maintenance (Total Productivity Maintenance TPM)

    Condition-based Maintenance - CBM

    4.1.1

    Implement TPM & CBM

    5.1

    5.1.1

    Head of Dept

    5.1.2

    Maintenance Mgr

    5.1.3

    Maintenance Technicians

    5.1.4

    Contractors

    6.1.1

    Start Immediately & monitor within one (1) year.

    Annual review.

    3.1.2

    Improve Calibration of equipment

    4.1.2

    Scheduled calibration

    5.1.2

    Approved Calibration Agency or Company

    6.1.2

    Continuous-based on equipment validity

    3.1.3

    Replace old and unreliable equipment

    4.1.3

    Reliablity Trending and Analysis

    5.1.3

    Maintenance Manager

    6.1.3

    Continuous-based on equipment condition and techno-economics

    3.1.4

    Improve Hexane Quality from Supplier

    4.1.4

    Testing of raw material

    5.1.4

    Testing engineer/technician

    6.1.4

    One (1) year.

    Annual review.

    1

    2

    3

    4

    5

    6

    OBJECTIVE

    TARGET

    PROGRAM

    ACTION

    RESPONSIBLE PERSONS

    TIME

    FRAME

    1.2

    Reduce moisture content in seed

    2.2

    Reduce moisture to minimum acceptable limits

    3.2

    Incoming seed testing

    4.2.1

    Enforce Contract Specifications

    4.2.2

    Test for moisture at Incoming Goods

    5.2

    5.2.1

    Head of Dept

    5.2.2

    Testing Mgr

    5.2.3

    Testing engineer/technician

    5.2.4

    Contractors

    6.2

    Start Immediately & monitor within one (1) year.

    Annual review.

    1.3

    Reduce husk content in seed

    2.3

    Reduce husk to minimum acceptable limits

    3.3

    Incoming seed testing

    4.3.1

    Enforce Contract Specifications

    4.3.2

    Test for husk at Incoming Goods

    5.3

    5.3.1

    Head of Dept Contract & Operations Sect

    5.3.2

    Testing Mgr

    5.3.3

    Testing engineer/technician

    5.3.4

    Contractors

    6.3

    Start Immediately & monitor within one (1) year.

    Annual review.

    1.4

    Optimise flake thickness in Flaker

    2.4

    Optimise flake to acceptable limits

    3.4

    3.4.1

    Implement TPM & CBM

    3.4.2

    Measure flake thickness

    3.4.3

    Ensure reliability of equipment

    4.4.1

    Use TPM

    4.4.2

    Testing for flake thickness using specialised tools.

    4.4.3

    Use good quality equipment

    5.4

    5.4.1

    Head of Dept Contract & Operations Sect

    5.4.2

    Testing Mgr

    5.4.3

    Testing engineer/technician

    5.4.4

    Contractors

    6.4

    Start Immediately & monitor within one (1) year.

    Annual review.

  • GP CONSULTANCY REPORT BY MALAYSIA BOLEH TEAMSOY BEAN OIL REFINING PROCESS

    123456OBJECTIVETARGET PROGRAM ACTION RESPONSIBLE PERSONSTIMEFRAME1.2 Reduce moisture content in seed 2.2Reduce moisture to minimum acceptable limits3.2Incoming seed testing 4.2.1Enforce Contract Specifications4.2.2Test for moisture at Incoming Goods 5.25.2.1Head of Dept5.2.2Testing Mgr5.2.3Testing engineer/technician5.2.4Contractors6.2Start Immediately & monitor within one (1) year.Annual review.1.3 Reduce husk content in seed 2.3Reduce husk to minimum acceptable limits3.3Incoming seed testing 4.3.1Enforce Contract Specifications4.3.2Test for husk at Incoming Goods 5.35.3.1Head of Dept Contract & Operations Sect5.3.2Testing Mgr5.3.3Testing engineer/technician5.3.4Contractors6.3Start Immediately & monitor within one (1) year.Annual review.

  • GP CONSULTANCY REPORT BY MALAYSIA BOLEH TEAMSOY BEAN OIL REFINING PROCESS

    123456OBJECTIVETARGET PROGRAM ACTION RESPONSIBLE PERSONSTIMEFRAME1.4Optimise flake thickness in Flaker2.4Optimise flake to acceptable limits3.43.4.1Implement TPM & CBM 3.4.2Measure flake thickness3.4.3Ensure reliability of equipment 4.4.1Use TPM 4.4.2Testing for flake thickness using specialised tools.4.4.3Use good quality equipment5.45.4.1Head of Dept Contract & Operations Sect5.4.2Testing Mgr5.4.3Testing engineer/technician5.4.4Contractors6.4Start Immediately & monitor within one (1) year.Annual review.

  • GP POLICY

  • GP : POLICYWe are committed to :

    Answer the societal demands for higher productivity in a sustainable manner with preserving the environment.Ensure the natural environment on which society depends is not degraded and polluted. Make a better and cost-effective approach in implementing efficient and innovative GP solution. Assist other companies in gaining their competitive advantages and cost-effective reduction of waste and emissions.