csc budget/staffing meeting february 8, 2010. present reduction in building (rib) 1.0 – ece 3 year...

17
CSC Budget/Staffing Meeting February 8, 2010

Upload: caren-armstrong

Post on 21-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

CSC Budget/Staffing Meeting

February 8, 2010

Page 2: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Present Reduction in Building (RIB)

1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Need for CSC to approve that fewer teacher assignments are needed.

Page 3: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Personnel Sub Committee There are no term limits

2 parents 3 teachers 1 principal

IBB must be completed between Feb. 19th -26th Any teacher can apply for in building

bidding as long as they are qualified.

Page 4: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

William Roberts K-8 Budget

2010-2011

Page 5: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Summary We are over by $107,673 with some changes

already done 1.0 Facilitator position RIB and changed to a

0.5 Intervention teacher and some para money

Reduced current Psychologist time from 4 days to 2.5 days.

Eliminate the 0.5 technology teacher

Increased Specials Mill Levy allocation from 2.5-3.5 determined by district, which increased our cost for specials by 0.5 out of the general fund.

Page 6: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

What can be changed Reduction of a classroom teacher Change Library position to a

Library/Tech para Change PE position to a Dance/PE Reduce 0.25 GT teacher position Eliminate 0.5 Spanish Teacher Reduction in the number/hours of

para help

Page 7: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Elimination of a classroom teacher

Increase the number of students in the grade level in which the teacher position is reduced.

Right now we are at approximately 1:26 teacher student ratio

RIB 1 teacher Saving cost $ 65,944

Page 8: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Change Library position to a Library/Tech para

Cost of a Licensed Librarian $65,944

Cost of a Library/Tech para $31,768

RIB full time Librarian and replace with full time Library/Tech para

Saving cost $34,176

Page 9: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Change PE position to a Dance/PE

Cost of a full time PE teacher $65,944

Cost of full time Dance/PE teacher will be covered by Mill Levy and building match

RIB full time PE teacher and replace with a full time Dance/PE teacher

$65,944

Page 10: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Reduce 0.25 GT teacher position

Cost of a 0.25 GT teacher, changing a 2 ½ days per week teacher to a 1 ¼ days per week

RIB 0.25 GT teacher Saving cost $16,486

Page 11: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Eliminate Spanish Teacher

Eliminate Spanish Teacher RIB Spanish Teacher $32,972 saving cost

Page 12: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Reduction in the number/hours of para help

Right now we have 15 paras ranging in 3- 7 hours per day – total cost $150,852- $42,562=$108,290. 1st and 2nd grade teachers each have a 4

hours para. 3rd/4th grade teachers share one para

between two teachers for 4 hours. There is one 5th grade para and a middle

school para. one lunch room para.

Page 13: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

What can be changed Elimination of a classroom teacher

$ 65,944 Change Library position to a Library/Tech para

$34,176 Change PE position to a Dance/PE

$ $65,944 Reduce 0.25 GT teacher position

$16,486 Eliminate Spanish Teacher

$32,972 Reduction in the number/hours of para help

Page 14: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

What can be changed Change Library position

to a Library/Tech para Change PE position to a

Dance/PE Reduce 0.25 GT teacher

position Elimination Spanish

teacher Reduction in the

number/hours of para help

$34,176

$65,944

$16,486

$32,972

$50,000

$199,578-$107,673

$91,905 under budget

Page 15: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Other Considerations Changing Mill Levy Specials allocations

1.0 Music

1.0 Art

1.0 Drama

0.5 Dance/Art/Music/Drama

1.0 Music

1.0 Drama

1.0 Dance

0.5 Art

1.0 Drama

1.0 Art

1.0 Dance

0.5 Music

1.0 Music

1.0 Art

1.0 Dance

0.5 Drama

1.0 Music

1.0 Art

1.0 Drama

0.5 Dance

Page 16: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

Comments or questions or Input Contact your CSC representative Principal Patricia Lea [email protected] Teachers Brenna Markson, 3rd/4th grade                             [email protected] Michael Sherer, middle school                              [email protected] Tracy Shoneman, 5th grade                                

 [email protected] Margaret Willett, 2nd/3rd grade                             [email protected] Parents Tara Byrnes                                                       [email protected] Catherine Chew

[email protected] Audrey Douthit [email protected] Katie Sorensen [email protected] Classified Staff Member VACANT Community Member Gabe Hurley

Page 17: CSC Budget/Staffing Meeting February 8, 2010. Present Reduction in Building (RIB) 1.0 – ECE 3 year old teacher 1.0 – Kindergarten teacher 1.0 – Facilitator

CSC next meeting 2/11 @ 3:30

At this meeting CSC will determine overall budget allocation for the 2010-2011 school year with non-mandated allocated funds.

Please check website for agenda details

http://billroberts.dpsk12.org/