CONSOLIDATED CONSTRCUTION CONSORTIUM LTD FORMAT NO.: CSF - 002 REV. NO. 1 DATE : 19-01-2010 HAZARD IDENTIFICATION AND RISK ASSESSMENT PAGE 1 OF 2 Project Name: Date: Project Code: HAZARD IDENTIFICATION & EVALUATION SECTION / DEPARTMENT: ACTIVITY : SUB ACTIVITY HAZARD HI No LEGAL SEVER ITY OCCUR RENCE I =S*O MAJOR RISK (Y/N) MP/ OCP (HI No.- Hazard Identification Number; I = S*O - Score for Hazard Impact; MP/OCP- whether could be addressed through Management Programme or Operational Control Procedures) (Note : 1. Severity and Occurrence Ratings could be: 1, 3, and 5. 2. If I = S*O is greater than or equal to 9, then the Hazard is a Major Risk)

Upload: ermelvindias

Post on 14-Sep-2015

214 views

Category:

Documents


0 download

DESCRIPTION

99

TRANSCRIPT

  • CONSOLIDATED CONSTRCUTION CONSORTIUM LTD FORMAT NO.: CSF - 002

    REV. NO. 1 DATE : 19-01-2010

    HAZARD IDENTIFICATION AND RISK ASSESSMENT PAGE 1 OF 2

    Project Name: Date: Project Code:

    HAZARD IDENTIFICATION & EVALUATION SECTION / DEPARTMENT: ACTIVITY :

    SUB ACTIVITY HAZARD

    HI No LEGAL

    SEVERITY

    OCCURRENCE I =S*O

    MAJOR RISK (Y/N)

    MP/ OCP

    (HI No.- Hazard Identification Number; I = S*O - Score for Hazard Impact; MP/OCP- whether could be addressed through Management Programme or Operational Control Procedures) (Note: 1. Severity and Occurrence Ratings could be: 1, 3, and 5. 2. If I = S*O is greater than or equal to 9, then the Hazard is a Major Risk)

  • CONSOLIDATED CONSTRCUTION CONSORTIUM LTD FORMAT NO.: CSF - 002

    REV. NO. 1 DATE : 19-01-2010

    HAZARD IDENTIFICATION AND RISK ASSESSMENT PAGE 2 OF 2

    RESIDUAL RISK ANALYSIS

    Major Risk Activity

    Hazard Consequence

    Current Risk Control

    Measures HORCM*

    Proposed Risk Control

    Measures Residual Risk

    I =S*O

    I- Impact Score, S- Severity, O- Occurrence * HORCM : Hierarchy of Risk Control Measures

    This can be any of the following Elimination (ELI) Substitution (SUB) Isolation (ISO) Engineering Control (ENC) Administrative Control including Signage (AC) Personal Protective Equipment (PPE)