csv issues b. vila-vilaro (naoj) asac f2f, florence, sept 2006
TRANSCRIPT
CSV Issues
B. Vila-Vilaro(NAOJ)
ASAC F2F, Florence, Sept 2006
CSV Teams
Since ACA System PDR (Nov 2005) “joint” activity
Staffing: “Core” members + Additional -Requirements (“boxes” approach) -Negotiations with ASIAA (Taiwan) -EA ARC Contribution On-site vs. Remote Support Issues ATF and AIV involvement (How many and
when)
•“Similar” tests/Knowledge base
•Sharing Resources
Additional (pre)CSV Sites
MELCO Antenna Construction Facility (Kurashiki,Okayama Pref.) Oct-Dec 2006: CIPT + Metrology + Pointing
ACA Correlator Test Facility (NAOJ, Mitaka) Sept-Oct 2006, Dec 2006-Jan 2007,May 2007-
Sept-2008
SMA @ Mauna Kea Observatory (Hawaii, USA)
ASTE Tests
ACA CorrBand4
Band8
Band10
ACA CSV Timeline
Both 12m handed over at same time
MELCO Refurbished 12m Antenna
First 7m Antenna
Strawman CSV Model OSF AOS
12M 2(?)
7M 2(?)
First
7M
ACA BALMA ACA BALMA
Ant Ant Site Site
Similar Antennas
Similar Tests
Sharing Resources and Experience
Joint Array
TP+Interf
Combined Modes
Additional Bands
Other Obs. Modes
12m and 7m ant: Main Diff.
12m Ant 7m AntSize 12m 7m
Surf Acc 25m 20 m
Optics f/D~0.4 f/D~0.367Central Hole
Subref Nutator+Cone Subref+Cone
WVR ON None (intially?)
Obs Modes TP(all)+Interf TP(some)+Intf
HolographyBeam Patt
ACA Specific Issues
TP Observations + Nutator WVR Phase Correction (4-point method) ACA Correlator Issues Configuration Evolution until Full Operation Calibration (Cross-calibration, high accuracy
modes, etc)
CSV STAGES for ACA
•1 TP 12m antenna (Milestone, not at ACA Site)
•1TP + ACA Correlator
•2TP + ACA Correlator
•4 TP + 1st 7m
•Growth of 7m Array