ct bike walk summit 2013 irena lazic

21
ConneCting the Capital City 27 April 2013 Presentaon @ Bike/Walk CT Summit Downtown Hartford’s Intermodal Triangle Hartford’s City-Wide Parks & Open Space System Plan

Upload: bike-walk-connecticut

Post on 07-Dec-2014

180 views

Category:

Education


0 download

DESCRIPTION

Bike Walk CT held its summit at Yale on April 27, 2013. Topics covered included: - Bike Friendly America - Attacking the Application Process for Bike Friendly Communities, Businesses and Universities - Complete Streets Engineering - How to Get Your Project Funded - The Third Mode: Towards a Green Society - What’s Going on in Connecticut

TRANSCRIPT

Page 1: Ct bike walk summit 2013   irena lazic

ConneCting the Capital City27 April 2013 Presentation @ Bike/Walk CT Summit

Downtown Hartford’s Intermodal Triangle

Hartford’s City-Wide Parks & Open Space System Plan

Page 2: Ct bike walk summit 2013   irena lazic

AGENDA TIGER Program iQuilt Background Related Transport Projects Intermodal Triangle Description Parks & Open Space Plan

ConneCting the Capital City27 April 2013 Presentation @ Bike/Walk CT Summit

Page 3: Ct bike walk summit 2013   irena lazic

Transportation Investment Generating Economic Recovery

TIGER IV - Hartford’s Intermodal Triangle - Successful ApplicationDeveloped Collaboratively by City of Hartford, ConnDOT, CTTransit, GHTD, Hartford BID, and CRCOG

January 2012 - Notice of Available Funds March 2012 - Submission by Hartford Team June 2012 - Notice of Award ($10M) October 2012 - Hartford City Council Authorizes Mayor to Accept Funds December 2012 - Contract Signed with US DOT Spring 2014 - Required Start of Construction

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 4: Ct bike walk summit 2013   irena lazic

Initiated by The Bushnell Theater in 2008 Embraced by the Mayor

Sustained by Public/Private Partnership

Informed by the Public in Dozens of MeetingsPlan Presented in January 2012

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 5: Ct bike walk summit 2013   irena lazic

Redesigning Streets for More than Cars. Activating Public Spaces.

Restoring Bushnell Park (including water!). Bringing the Park to Main Street.

Walking. Culture. Innovation.Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT Summit

Background Intermodal Triangle Parks System Plan

Page 6: Ct bike walk summit 2013   irena lazic

Walking. Culture. Innovation.

Nicer Places. More People. Greater Economic Opportunity.

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 7: Ct bike walk summit 2013   irena lazic

The iQuilt Plan is Already Being Implemented

WinterFest & EnvisionFestConnecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT Summit

Background Intermodal Triangle Parks System Plan

Page 8: Ct bike walk summit 2013   irena lazic

The iQuilt Plan is Already Being Implemented

Downtown Wayfinding Signage

1

3 4 52

8

11 12 1314

15

1617

18 19 2021 22 23

26

35 3637

27

28

29

38

30

39

40

41 42 4443 45 46 47 48 49 50

52

53 5455

5759

60

61 6364

6566

62

5856

51

31 3233 34

24 25

9

107

6

PH L

PH K

PH J

PH J

PH J

PH J PH J

PH I

PH H

PH H PH H

PH H PH H

PH G

PH G

PH G

PH G

PH G PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH G

PH F

PH D

PH F

PH F

PH F

PH D

PH F

PH F

PH F

PH FPH F

PH F

PH F

PH F

PH F

PH FPH F

PH F

PH F

PH D

PH F

PH F

PH F

PH F

PH B

PH D

PH D

PH B

PH B

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D

PH D PH D

PH D

PH D PH DPH D

PH D

PH D

PH D

PH DPH D

PH D

PH D PH D

PH D

PH D

PH D PH D

PH D

PH C

PH C

PH C

PH C

PH G

PH B

PH B PH B

PH B PH B

PH B PH B

PH B

PH B

PH B

PH B PH B

PH B

PH B

PH B

PH B

PH B

PH B

PH B

PH B

PH B

PH BPH B

PH B

PH B

PH B

PH B

PH B

PH G

PH F

PH A

PH D

PH A

PH D PH D

PH D

PH D*

PH A

PH A

PH B

PH G

PH F

PH F

PH D*

PH D

PH B

PH B

PH B

PH B

PH B

PH F

PH BPH F

PH F

PH D

PH D

PH D

PH B

PH B

PH B

PH B

PH DPH F

PH B

PH DPH D

PH B

PH D

PH B

PH G

PH F

PH F

PH B

PH D

PH F

PH D

PH D

PH B

PH D

PHB

PH B

PH D

PH G

PH B

PH L

PH F

PH G

PH G

AS

YL

UM

ST

RE

ET

FORD

STREET

JE

WE

L S

TR

EE

T

WELLS

STREET

AR

CH

ST

RE

ET

WE

LL

S S

TR

EE

T

LIN

DE

N P

LA

CE

PE

AR

L S

TR

EE

T

PR

AT

T S

TR

EE

T

TA

LC

OT

T S

TR

EE

T

MO

RG

AN

ST

RE

ET

ST

AT

E S

TR

EE

T

GR

OV

E S

TR

EE

T

EL

M S

TR

EE

T

CA

PIT

OL

AV

EN

UEB

UC

KIN

GH

AM

ST

RE

ET

EL

M S

TR

EE

T

SH

EL

DO

N S

TR

EE

T

AL

LY

N S

TR

EE

T

CH

UR

CH

ST

RE

ET

HIGH

STREET

ANN

STREET

TRINITY STREET

LAFAYETTE STREET

WASHINGTON STREET

CEDAR STREET

JOHN STREET

CLINTON STREET

UNION

PLACE

WEST STREET

WHITEMAN COURT

HUDSON STREET

TRUMBULL STREET

MAIN STREET

PROSPECT STREET

MARKET

STREET

COLUMBUS

BOULEVARD

FR

ON

T S

TR

EE

T

PO

TT

ER

ST

RE

ET

LEWIS STREET

GO

LD

S

TR

EE

T

TE

MP

LE

ST

RE

ET

KIN

SL

EY

ST

RE

ET

A1.1OWNER:

City of Hartford

Dept. of Public Works

525 Main St.

Hartford, CT 06103

860.757.9900

ARCHITECT:

Suisman Urban Design

201 Mabery Road

Santa Monica, CA 90402

310.230.9997

www.suisman.com

PROJECT AREA AND LOCATION PLAN

Scale: NTS

Date: 5/04/12

Rev. Date:

For: BIDS

DOWNTOWN INTERSECTION

WAYFINDING

PROJ. # 1202.3

Old State House1

Riverfront6

CT Convention Ctr.7

Atheneum

4

3

City Hall

48.1

COLUMBUS BLVD

CorningFountain

Performance Pavilion

PumpHouse

CharterOak Scion

Stego-saurus

Pulaski

Lafayette

PetersburgExpress

Hubbard

AndersonvilleBoy Edwards

Spanish-AmericanWar Memorial

Knowlton

PutnamWorkers

Memorial

Wells

Harmony

Umbrella

FoxGate

UnionStation

Gate

HoadleyGate

StoneField

Sculpt.

Hale

Clocktower

CharterOak Scion

MEMORIALARCH

SOLDIERS& SAILORS

Carousel

Columbus

Butler-McCook

House & Garden

CentralBaptistChurch

SouthChurch

HolyTrinityChurch

SODONEIGHBORHOOD

FROG HOLLOWNEIGHBORHOOD

SHELDON /CHARTER OAK

NEIGHBORHOOD

ENTERTAINMENTDISTRICT

LindenBuilding

PolishNationalHome

Ribico�Federal

Building

CotterFederal

Building

Isham-TerrryHouse

Artspace

CapitalComm.College

UConnSchool ofBusiness

CharterOakCulturalCenter

“Stilts Bldg.”

“Gold Bldg.”

WelcomeCenter Christ

ChurchCathedral

USJSchool ofPharmacy

YMCA

ResidenceInn

HTFD.STAGE

OldStateHouse

XL CENTER

Charter OakMemorial

St. Patrick-St. Anthony

Church

FranciscanCenter

Hilton

HomewoodSuites

Amos Bull House

ANCIENTBURYINGGROUND

Marriott

BURRMALL

PULASKICIRCLE

Presbyt.Church

StateO�ceBldg. THE

BUSHNELL

B U S H N E L L

CAPITOL

CenterChurch

CITYHALL

THEATERWORKS

CONNECTICUTCONVENTION

CENTER

SCIENCECENTER

CONSTITUTIONPLAZA

HolidayInn

to Stowe &Twain Houses,Asylum Hill

to Coltsville

ArtSpace

UNIONSTATION

PUBLICLIBRARY

RIVERFRONT / Sculpture Walk

RIVERFRONT

MUSEUMof CT. HIST.

State Library

Supreme Crt.

“Boat Bldg.”

RIVER-FRONTPLAZA

TRAVELERS

Htfd.ClubElks

WADSWORTHATHENEUM STATE

HOUSESQUARE

TOWERSQUARE

PLAZAStairs

Stairs

Stairs Stairs

to Riverfront

Boat House

C O N N E C T I C U T R I V E R

to Superior Court, Park Street, Hartord Hospital, Trinity College

to Park Street, Hartord Hospital

to Armory, Billings Forge,

Real ArtWays

LegislativeO�ce Bldg.

to Armory

to Comcast Theater

to Keney Tower,

Old North

Cemetery

to Artists

Collective, Univ. of

Hartford

P A R K

AS

YLU

MA

SY

LUM

AS

YLU

M

PR

AT

T

FORD

JEW

ELL

WELLS

WEL

LS

PEA

RL

HIC

KS

PEA

RL

ST

AT

E

CE

NT

RA

L RO

W

ELM

CA

PIT

OL

AV

CA

PIT

OL

AV

WHITMAN CTJOHN

BU

CK

ING

HA

M

BU

CK

ING

HA

M

ELM

ALLY

N

CH

UR

CH

CH

UR

CH

CH

AP

ELM

OR

GA

N

H IGH

SPRUCE

HOADLEY

FOO

T G

UA

RD

ANN

HAYNES

UNION PL

TRINITY

CLINTON

LAFAYETTE

WASHINGTON

WEST

CEDAR

WADSWORTH

HUDSON

TRUMBULL

MAINMAIN

PROSPECT

MARKET

COLUMBUS BLVD

AR

CH

KIN

SLE

Y

TE

MP

LE

TA

LCO

TT

FRO

NT

GR

OV

E

SH

ELD

ON

CH

AR

TE

R O

AK

A

V

LEWIS

LIN

DE

N P

L

G

OLD

ATH

. SQ

.

PU

LAS

KI

M

ALL

I -91

WH

ITEH

EAD

HW

Y.

I -84

Fou

nd

ers Br id

ge / Prom

enade

Mayor Peters Bridge

BU

SH

NE

LL

P

AR

K

NO

R T H

N

0‘500’ 500’1000’ 1000’1500’ 1500’

4 2 0 2 4 66minutes on foot

MINUTES ON FOOT FROM

HERE

Hartford’s city plan is one of the oldest in America – first laid out around 1635 (just 20 years after the death of Shakespeare!). Like other colonial-era American cities, Hartford’s streets follow the natural topography.

The resulting irregular network of streets creates a charming, quilt-like plan with interesting urban spaces and vistas. This pattern reflects Hartford’s colonial roots, but can be challenging to navigate.

for more information please visit hartford.com/downtown

W A L K I N G M A P + P L A C E S O F I N T E R E S T

FINDING YOUR WAY ON FOOT IN CONNECTICUT’S CAPITAL CITY

Map of Hartford c. 1640

4

6

8

2

0

2

4

6

8

10

The color-coded walking map above, available at most downtown street corners, can help you find your way on foot.

Additionally, the signs above you (on the back of the “walk” signals) tell you the direction and distance – in minutes on foot – of key civic and cultural destinations.

Place of cultural, historic, or architectural interest

Walkable street or pathway

You are here The GreenWalk, parks,green spaces

The iQuilt Plan with The GreenWalk

© The iQuilt Partnership / Suisman Urban Design All rights reserved

Downtown Hartford is filled with cultural, civic, and commercial destinations, all in a compact district that can be easily traversed on foot in less than 20 minutes.

48

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 9: Ct bike walk summit 2013   irena lazic

The iQuilt Plan is Already Being Implemented

Travelers Tower & Phoenix PlazaConnecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT Summit

Background Intermodal Triangle Parks System Plan

Page 10: Ct bike walk summit 2013   irena lazic

2015: Opening of

3-Minute Headways to Downtown & visa-versa

Downtown Connections to Regional Employment, Arts, & Retail

Need Downtown Alignment to maximize appeal and usefulness

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 11: Ct bike walk summit 2013   irena lazic

2016: Increased Railroad Service to Union Station

Today: 6 Trains Per Day

2016: 12-17 Trains/Day Every 45 minutes at peak Seamless Connections to MetroNorth & Amtrak

This is a Game-Changer

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 12: Ct bike walk summit 2013   irena lazic

2015: Hartford’s Intermodal Triangle

Connecting Union Station to Main StreetDowntown Connections to Bushnell ParkImproving Transit Connections

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 13: Ct bike walk summit 2013   irena lazic

Bushnell Park North

Shorter Crosswalks to Park Entrances

New Promenade from Union Station to Gold Street

Traffic Calming at Park Edge

Extension of Bushnell Park to Main Street

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 14: Ct bike walk summit 2013   irena lazic

Bushnell Park North

DRAFT

Rendering of Park Entrance @ Main Street

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 15: Ct bike walk summit 2013   irena lazic

Downtown Transit Pattern - Today vs. Tomorrow

Less Bus Congestion on Main Street

Better Downtown Access from East and West

Better Transit Connections

Introduction of CTfastrak to State House Square

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 16: Ct bike walk summit 2013   irena lazic

Main Street & State House Square

DRAFT

New On-Street Parking Options - Expanded Sidewalk @ Old State House - Convenient Transit

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 17: Ct bike walk summit 2013   irena lazic

January 2013 - Public Meeting at Hartford Public Library

January 2013 - Engineers Selected; Surveys/Design Underway

February 2013 - CRCOG Completed Downtown Transit Study

February 2013 - Suisman Urban Design Completed Draft Concept

May 22 2013 - Public Forum @ Hartford Public Library

October 2013 - 90% Design

December 2013 - Bid Construction Project

Spring 2014 - Start Construction

Fall 2015 - Complete Construction

Next Steps for Implementation

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 18: Ct bike walk summit 2013   irena lazic

Capital City Parks & Open Space System Plan

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 19: Ct bike walk summit 2013   irena lazic

Vision

Create a fully functional parks/open space/bike system

Connect traditional as well as non-traditional open spaces

Establish cycling as an important mode of transportation

Create vibrant places and active lifestyles

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 20: Ct bike walk summit 2013   irena lazic

Goals & Objectives

Develop clear guidance for maintenance and operations

Ensure attractive and functional year-round public spaces

Develop a bicycle network strategy

Improve public safety in our parks

Develop an innovative funding mechanism

Develop action plan and strategies for implemenation

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan

Page 21: Ct bike walk summit 2013   irena lazic

Timeline

Connecting the Capital City 27 April 2013 Presentation @ Bike/Walk CT SummitBackground Intermodal Triangle Parks System Plan