ctf3 & clic parameters instrumentation already developed what will be done in the clex
DESCRIPTION
Instrumentation Working Group. CLIC 07. T. Lefevre. CTF3 versus CLIC. CTF3 & CLIC Parameters Instrumentation already developed What will be done in the CLEX. CLIC 07. 800 Klystrons low frequency high efficiency. Power stored in electron beam. 144000 Accelerating Structures - PowerPoint PPT PresentationTRANSCRIPT
• CTF3 & CLIC Parameters
• Instrumentation already developed
• What will be done in the CLEX
CTF3 versus CLICCTF3 versus CLIC
T. LefevreInstrumentation Working Instrumentation Working GroupGroupCLIC 07CLIC 07
Electron beam manipulation
Long RF PulsesP0 , n0 , 0
800 Klystrons
low frequencyhigh efficiency
Power stored inelectron beam
Short RF PulsesPA = P0 N1
A = t0 / N2 A = 0 N3
144000 Accelerating Structures
high frequency high gradient
Power extracted from beamin resonant structures
The CLIC RF power source can be described as a “black box”, combining very long RF pulses, and transforming them in many short pulses, with higher power and with higher frequency
What does the RF Power Source do ?
CLIC Drive BeamCLIC Drive Beam T. Lefevre
CLIC 07CLIC 07
CLIC Drive BeamCLIC Drive Beam
Drive Beam Acceleratorefficient acceleration in fully loaded linac
140 s total length - 24 24 sub-pulses - 4.2 A2.4 GeV - 60 cm between bunches
240 ns
Drive beam time structure - initial
24 pulses – 100 A – 2.5 cm between bunches
240 ns5.8 s
Drive beam time structure - final
Power Extraction
Drive Beam Decelerator Sector (24 in total)
Combiner ring 3
Combiner ring 4pulse compression & frequency multiplication
pulse compression & frequency multiplication
Delay loop 2gap creation, pulse compression & frequency multiplication
Transverse RF Deflectors
RF Power Source Layout
T. Lefevre
CLIC 07CLIC 07
Covered by EUROTeV
Covered by CTF3
• R2.1: Developments of structures with hard-breaking materials (W, Mo…)
• R2.2: Validation of stability and losses of DB decelerator; Design of machine protection system
• R2.3: Test of relevant linac sub-unit with beam
• R2.4: Validation of drive beam 40 MW, 937 MHz Multi-Beam Klystron with long RF pulse
• R2.5: Effects of coherent synchrotron radiation in bunch compressors
• R2.6: Design of an extraction line for 3 TeV c.m.
• R1.1: Test of damped accelerating structure at design gradient and pulse length
• R1.2: Validation of drive beam generation scheme with fully loaded linac operation
• R1.3: Design and test of damped ON/OFF power extraction structure
R1: Feasibility
R2: Design finalization
* Feasibility study done – need development by industry. N.B.: Drive beam acc. structure parameters can be adapted to other klystron power levels
*
The CLIC Technology-related key issues as pointed out by ILC-TRC 2003
T. Lefevre
CLIC 07CLIC 07MotivationMotivation
Motivation and goals of CTF3 collaboration
Build a small-scale version of the CLIC RF power source, in order to demonstrate:
full beam-loading accelerator operation electron beam pulse compression and frequency multiplication using RF deflectors
Provide the RF power to test the CLIC accelerating structures and components
CTF3 is being built at CERN by a collaboration modeled on the large physics experiments
23 institutes from 12 countries
Chairman of collaboration Board: M. Calvetti (INFN-LNF)Spokesperson: G. Geschonke (CERN)
Will be largest LC test facility constructed M. Huening, A. Mosnier, V. Shiltsev & T. RaubenheimerCLIC Advisory Committee Report
T. Lefevre
CLIC 07CLIC 07MotivationMotivation
CTF3 Evolution
Drive Beam Injector (2003)
Drive Beam Accelerator
(2004)
Delay Loop (2005)
Combiner Ring(2006-07)
TL2(end 2007)
CLEX(2007-08)
CTF3 ComplexCTF3 Complex
CLIC Test Facility 3 to show the feasibility of the CLIC RF Source & Two Beam Acceleration for a multi-TeV e+-e- collider
16 Institutes
T. Lefevre
CLIC 07CLIC 07
CTF3 PrincipleCTF3 Principle
42m Delay loop x2 (8-10ps bunch length)
84m Combiner ring (x4)
(8-10ps bunch length)
Linac2-4ps bunch length
CLEX
(1ps bunch length)
RF deflectors for injections in the rings
Bunch frequency multiplication by a factor 8 : from 1.5 to 12GHz
1.56 s train length – 4A, 150MeV20 cm between bunches
140 ns
140ns pulse - 30A, 150MeV 2.5cm between bunches
140 ns
Initial time structure Final time structure
T. Lefevre
CLIC 07CLIC 07
CLIC Drive Beam / CTF3CLIC Drive Beam / CTF3
Beamparameters
DB GenerationComplex
DB Decelerator(24 units)
CTF3Linac
CTF3CLEX
Electrons energy 2.38 GeV 2.38 0.238 GeV
150MeV 150MeV
Beam current /charge
4.2A / 587C 101A / 24.4C 4A / 1.6C 30A
Total Beam Energy 1.397MJ 58 5.8kJ 240J 240J
Bunch length 6-13ps 3.3ps 2-10ps 1ps
Minimum beam size 50m 50m 50m
Charge density 3.7 109 nC/cm2 1.5 108 nC/cm2 1.1 107 nC/cm2
The thermal limit for ‘best’ material (C, Be, SiC) is ~ 1 106 nC/cm2
• Control of beam loss to prevent beam induced damage (10-4)
• Use of non-intercepting / non degradable beam diagnostic
• Strong scaling factor from CTF3 to CLIC
T. Lefevre
CLIC 07CLIC 07
Beam Parameters
CTF3 detectorType
CTF3 detectorPerformances
Intensity Wall Current Monitor Dedicated talk
Position x,y Inductive Pick-up Dedicated talk
Energy spread E/E
Bunch length z RF pick-up, RF deflector, Streak camera Talk on RF pick-up
Beam size & emittance
Beam loss Ionization chamber, ACEM, Cherenkov monitor
Dedicated talk
Bunch frequency multiplication
RF techniques Dedicated talk
Phase stability RF techniques Dedicated talk
Measurement @ CTF3Measurement @ CTF3 T. Lefevre
CLIC 07CLIC 07
What is presented in this talk
High efficiency acceleration schemeHigh efficiency acceleration scheme
Full beam-loading acceleration in TW sections
RF in
“short” structure - low Ohmic losses
RF to load
most of RF power (≥ 95%) to the beam
High currentbeam
No
No beam
T. Lefevre
CLIC 07CLIC 07
Lstruct
loaded
Gacc
s
unloaded
E0
t
tfill
steady state E0 /2
Ebeam
400300-5
0
5
time (nsec)
P/P (%
)
P1050Central
=107.5MeV/c
-50
5
600
700
800
900-10-5
05
10-1
-0.5 0
0.5 1
P/P (%
)
Ppeak
=108.5 MeV/c,
P
FWHH
=11.68%
600700
800900
0 1 2 3 4 5
IBeam
(A)
time (nsec)
600700
800900
108
110
112
Ppeak
(MeV/c)
time (nsec)
600700
800900
1 2 3
PFWHH
(%)
200100
Transient
Steady stateP/P
(%
)
Time (ns)
Time resolved beam energy spectrum measurement in CTF3
RF Power Source “building blocks”
Full beam-loading acceleration in TW sections
Time resolved spectrometry @ CTF3Time resolved spectrometry @ CTF3 T. Lefevre
CLIC 07CLIC 07
BendingMagnet
e-
• 24 Tungsten plates (2mm thick) spaced by ~ 1mm• Connected to 50 Ω to the ground
• Slit dump ( 2mm slit and a dump in steel)
Segmented DumpOr Slit Dump
OTR Screen&
Segmented PMT
- 32 channels PMT (Hamamatsu)- 2mm spatial resolution - 36dB, 100MHz amplifier in the klystron gallery
Time resolved spectrometry @ CTF3Time resolved spectrometry @ CTF3 T. Lefevre
CLIC 07CLIC 07
• Problem with synchrotron light in the bending magnet
@ 100MeV: ph/e- 4.10-3(SR) versus 9.10-3 (OTR)
• Parabolic OTR screen in order to optimize the collection of the light
OTR & Segmented PhotomultiplierOTR & Segmented Photomultiplier T. Lefevre
CLIC 07CLIC 07
Implement a carbon foilas SR light shielding
•Collimator in Steel• Mounted on the beam tube• 32 vertical slits 400microns thick• Water cooled
electrons
Segmented DUMP • 32 Tungsten plates (2mm thick) spaced by ~ 1mm• Insulator in Alumina (rad-hard)• New Ceramic electronic card connected to the dump segments• Alignment balls has been added• Connected to 50Ω to ground (increasing signal to noise ratio)
Results
Fluka simulationsof energy deposition
• 20MeV Electrons• Beam size in x : 3mm sigma
Segmented DumpSegmented Dump T. Lefevre
CLIC 07CLIC 07
Camera
OTR Light
ElectronsOTR screen
Camera
lenses
OTR ScreensOTR Screens T. Lefevre
CLIC 07CLIC 07
Created when charged particles pass through the interface between two materials with different permittivity
Angular distribution of OTRQuad Scan in X Quad Scan in Y
• Thin Al foil is fragile • Using 200m Si wafer with a very good surface quality• Adding an Aluminum coating to provide an excellent reflectivity coefficient (90%)
High reflectivity screens for low charge beam
• 200m thick Polished CVD SiC•Non homogeneous surface of C
Thermal resistant material for high charge beam
30% Reflectivity coefficient
OTR Screens limitations OTR Screens limitations T. Lefevre
CLIC 07CLIC 07
Use Synchrotron light produced in the rings or OTR/Cherenkov screens in a linac
‘Streak cameras uses a time dependent deflecting electric field to convert time information in spatial information on an intensified CCD’
• 200fs time resolution at best using state of the art Cameras : FESCA 200• Limitations :(i) Initial velocity distribution of photoelectrons : narrow bandwidth optical filter(ii) Spatial spread due to the size of the slit(iii) Dispersion in the optics
- Streak Camera -
TUPB29, TUPC11, WEPB05, WEPB12, WEPB20
Focusing element
Bunch length monitoring Bunch length monitoring T. Lefevre
CLIC 07CLIC 07
‘ CTF3 Complex’
SR@ Delay Loop
= 8.9ps (2.7 mm)“Nominal” chicane - R56 = 0.45
OTR@ linac
= 4.5ps (1.4 mm)
Sweep speed of 10ps/mm
Bunch length can be manipulated at the end of the linac using a magnetic chicane 2 Optical lines to the streak camera
•Synchrotron Radiation in the Delay Loop•OTR in the linac at the exit of the Delay Loop
Bunch length monitoring Bunch length monitoring T. Lefevre
CLIC 07CLIC 07
Old (1960-70’s) idea to use RF deflector as a bunch length monitor
• The RF Deflector can be seen as a relativistic streak tube.• The time varying deflecting field of the cavity transforms the time information into a spatial information• The bunch length is then deduced measuring the beam size at a downstream position using a screen (or Laser Wire Sanner)
y0
y
Deflecting mode TM11
Betatron phase advance(cavity-profile monitor)
Beta function at cavity and profile monitor
Beam energy
RF deflector phase
RF deflectorwavelength
Deflecting Voltage
Bunch length
Resolution will depend on : (sub-100fs)• Screen spatial resolution• Deflecting power• Beam optic between the deflector and screen
MOO2A02, TUPB13, TUPB3 & WEO2A03 by A. Cianchi,
Bunch length monitoring Bunch length monitoring T. Lefevre
CLIC 07CLIC 07
3GHz RFDeflector
Camera
OTR Light
Bunch length 0.5 mm (1.2ps)
Bunch length 2.5 mm (6ps)
30o offcrest on last klystron
Bunch length monitoring Bunch length monitoring T. Lefevre
CLIC 07CLIC 07
How can we make profile monitor for the Drive Beam Linac
• No non-intercepting transverse profile monitor available for low energy electron beams in a linac
• Degradable profile monitor• ‘Kalachnikov’ : bullet scanner
C. Dimopoulou, PS/BD note 99-12
• Neutral beam scanner : Gas jet
m size bullet
e
Beam lossdetector
• Any new idea highly welcome…
No conclusionNo conclusion T. Lefevre
CLIC 07CLIC 07
Back-up SlidesBack-up Slides T. Lefevre
CLIC 07CLIC 07
P0 , 0
P0 , 0
Beam combination/separation
by transverse RF deflectors
RF Deflector,
Deflecting
Field
Transverse
02 P
0 , 2
0
RF Power Source “building blocks”
RF DeflectorRF Deflector T. Lefevre
CLIC 07CLIC 07
Beam combination/separation
by transverse RF deflectors
RF Deflector,
Deflecting
Field
Transverse
0
RF Power Source “building blocks”
P0 , 0
P0 / 2 , 0 / 2
P0 / 2 , 0 / 2
CLIC Drive BeamCLIC Drive Beam T. Lefevre
CLIC 07CLIC 07
Delay LoopDelay Loop
odd buckets
even buckets Delay
Loop
RF deflector
Combination scheme
Gap creation & first multiplication 2
Ldelay = n 0 = c Tsub-pulsePhase coding
180 phase switch
Acceleration 0
Deflection 0 / 2
Sub-Harmonic Bunching 0 / 2
How to “code” the sub-pulses
T. Lefevre
CLIC 07CLIC 07
Sub-harmonic bunching systemSub-harmonic bunching system
666 ps
1 8
Fast phase switch from SHB system (CTF3)
8.5 · 666 ps = 5.7 ns
satellite
3 TW Sub-harmonic bunchers,each fed by a wide-band TWT
Streak camera – 500 ps/mm
main
T. Lefevre
CLIC 07CLIC 07
0 500 1000 1500 2000 2500
6
4
2
0
t [ns]
I [A
]
1
1
2
2
3
3
Beam recombination in the Delay Loop (factor 2)
Delay Loop @ CTF3Delay Loop @ CTF3 T. Lefevre
CLIC 07CLIC 07
CTF3 bunch train combinationCTF3 bunch train combination
Phase coding in thesub-harmonic bunching system
Bunch frequency multiplication in delay loop
0 500 1000 1500 2000 25000
1000
2000
3000
4000
Lig
ht I
nten
sity
(a.
u.)
Time (ps)
0 500 1000 1500 2000 25000
500
1000
1500
2000
Lig
ht I
nten
sity
(a.
u.)
Time (ps)
Sweep speed 250ps/mm
SR light in the Delay Loop OTR light after recombination
T. Lefevre
CLIC 07CLIC 07
RF injection in combiner ring (factor 4 for simplicity)
3rd
o/4
4rd
2nd
Cring = (n + ¼) injection line
septum
localinner orbits
1st deflector 2nd deflector
1st turn
o RF deflector field
Frequency multiplication - Combiner RingFrequency multiplication - Combiner RingT. Lefevre
CLIC 07CLIC 07
2nd 3rd 4th1st turn
Final pulse train
N/4 pulses
Cring = c t = c 2 Tsub-pulse
pulse train from DL
N pulsest = 2 Tsub-pulse
Tsub-pulse
Frequency multiplication - Combiner RingFrequency multiplication - Combiner RingT. Lefevre
CLIC 07CLIC 07
333 ps
t
x
83 ps
Bunch combination (factor 4)2003 CTF3 Preliminary Phase results
Combiner ring bunch manipulationCombiner ring bunch manipulation T. Lefevre
CLIC 07CLIC 07
Bunch train combinationBunch train combination
Better RF combination• 7.5GHz
• 9GHz
t (ns)
0 500 10000
500
Lig
ht
Inte
nsity (
a.u
.)
Time (ps)
Wiggler on
0 500 10000
250
500
750
1000
Lig
ht
Inte
nsity (
a.u
.)
Time (ps)
Wiggler off
Bunch from the linac
Bunches fromthe DL
Bunches from the DL later by 12ps (3.6mm)
333 ps
OTR light and sweep speed 100ps/mm
‘ Adjust the delay loop length with a magnetic wiggler’
T. Lefevre
CLIC 07CLIC 07
Stretching in the Frascati Chicane Stretching in the Frascati Chicane T. Lefevre
CLIC 07CLIC 07
- Calibration of RF Deflector -
Make a power scan at zero crossing and (zero crossing – 180o) to check if there is no perturbation from linac wakefields
RF Phase (o)
Bea
m P
ositi
on (
mm
)
Use a Beam Position Monitor close to the Profile monitor to calibrate the deflection angleR34 = transfer Matrix element from cavity to the BPM
Bunch length monitoring Bunch length monitoring T. Lefevre
CLIC 07CLIC 07
- Bunch Length Measurement with the 1.5GHz RF Deflector of the Delay Loop -
OTR screen
• Maximum power of 20MW• 5degrees @1.5GHz = 9.25ps (4mm)
noRF = 0.35mm0Xing = 2.9mm (6.7ps)
Bunch length monitoring Bunch length monitoring
With this setting, the resolution is better than 1psMore tests must be done to check where the limits are
RF deflector offRF deflector on : 0 Xing
T. Lefevre
CLIC 07CLIC 07
• Measure the beam image current on the beam pipe using 8 electrodes• Electrodes are combined in pairs so that each transformer sees half of the load• Frequency low cut-offs are limited by connection parasitic resistances and primary electrode inductance
Design by Marek Gasior : CERN-AB-2003-063
Inductive Pick-up @ CTF3
Beam Position monitorBeam Position monitor
Inductive Pick-up @ CTF3
T. Lefevre
CLIC 07CLIC 07
Inductive Pick-up @ CTF3
• Resolution already I/I = 10-3
• For CLIC Drive Beam (100s pulse duration) need to lower the low frequency cut off
Beam Position monitorBeam Position monitor T. Lefevre
CLIC 07CLIC 07
>15 BPMs already installed in CTF3
Inductive Pick-up @ CTF3
Beam Position monitorBeam Position monitor T. Lefevre
CLIC 07CLIC 07
DiagnosticsBeam position
Test in CTF3 latethis year
L Soby – I. Podadera
High precision position High precision position measurementmeasurement
T. Lefevre
CLIC 07CLIC 07
Machine protection system @ CTF3
• Compare signals from consecutive Wall Current Monitors• If losses is detected, the electron gun is switched off• Time response dominated by cable length (>311ns)
D. Belohrad, Dipac Conference, Lyon, p.255, (2005) P. Odier, CERN-AB-2003-069
WCM
For CLIC DB the system will have to rely on Beam Loss Monitors
Manipulating high beam chargeManipulating high beam charge T. Lefevre
CLIC 07CLIC 07
L Soby – A. D‘Elia
DiagnosticsWall Current Monitor
High Bandwidth Wall Current High Bandwidth Wall Current MonitorMonitor
T. Lefevre
CLIC 07CLIC 07
Controller
• Single shot device
• +/- 50MHz bandwidth (react fast)
• 10fs resolution for phase measurement (0.1o @ 30GHz)
• +/- 5degrees range
• 6dB amplitude range
Drive Beam Longitudinal stability
Possible candidates for Tuners- RF deflectors in a dispersive and anisochronous area- Accelerating structures and chicane
• Use RF pick-up (30GHz) to measure the Drive Beam phase at 2 locations (≠ longitudinal dispersion) • Use tuners to correct the phase error
Layout of Phase feedback
Beam Phase monitorBeam Phase monitor T. Lefevre
CLIC 07CLIC 07
F. Stulle -PSI
Main/Drive Beam Phase stability
4% luminosity reduction = 0.225o
z = 6 m
Beam Phase monitorBeam Phase monitor T. Lefevre
CLIC 07CLIC 07
Femtosecond Phase detection
By J. Sladen and A. Andersson
• Mixing the 30GHz signal from the beam down to 750MHz• Measure the 750MHz signal Phase and Amplitude
• Goal to find a phase detector@750MHz with noise below 0.03o
• Phase detector can be multipliers or mixers
Beam Phase monitorBeam Phase monitor T. Lefevre
CLIC 07CLIC 07
DiagnosticsPhase measurement
• Phase accuracy: 0.1º
• Amplitude range: ~6dB
• Bandwidth: 50MHz, system investigated up to 250MHz
J. Sladen, A. Andersson
Beam Phase monitorBeam Phase monitor T. Lefevre
CLIC 07CLIC 07
CLic Experimental Areas (CLEX)CLic Experimental Areas (CLEX)
existing building
D FFD
D F D
D F D D F D
D F D
DF DF DF DF DF DF DF DF DF
D F D
F DF D
D FFFDD
D F DD F D
D F DD F D D F DD F D
D F DD F D
DF DF DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF
D F DD F D
F DF DF DF D
42.5 m
8 m
2m
D FFD
DF
F
D F DDUMPD F D
F
FD
ITB
1.85m
CALIFES Probe beam injector
LIL-ACSLIL-ACSLIL-ACSD F D
D F D
DFDUMP
0.75
1.4m
1
DUMP
22.4 mTBL
2.5m
Transport path
DUMP
DUMP 22 m
2.0m
DF DF DF DF DF DF DF DF
3.0m3.0m6 m
D F D
F DF D
16.5 mTBTS
16 m
TL2’
42.5 m42.5 m
8 m8 m
2m2m
D FFFDD
DF
FDD
FF
FF
D F DD F DDUMPD F DD F D
F
FD
F
FD
F
FD
ITB
1.85m1.85m
CALIFES Probe beam injector
LIL-ACSLIL-ACSLIL-ACSLIL-ACSLIL-ACSLIL-ACSD F DD F D
D F DD F D
DF DFDUMP
0.75
1.4m1.4m
11
DUMP
22.4 m22.4 mTBL
2.5m2.5m
Transport path
DUMP
DUMP 22 m22 m
2.0m2.0m
DF DF DF DF DF DF DF DFDF DF DF DF DF DF DF DF DF DF DF DF DF DF DF DF
3.0m3.0m3.0m3.0m6 m6 m
D F DD F D
F DF DF DF D
16.5 m16.5 mTBTS
16 m16 m
TL2’
Test Beam Line TBL
T. Lefevre
CLIC 07CLIC 07