3D Laser ScanningCTS provides full-service high definition 3D laser scanning that is ultra fast, reflectorless surveying used to create topographic surveys, preconstruction surveys of existing conditions, conformance surveys, as-built surveys, heritage preservation surveys, quantity/volume surveys, and to document construction accident sites. Collecting 500,000 points per second, 3D laser scanning enables CTS to capture an exact moment in time, with a precision of millimeters. Our modeling softwares fully integrate with REVIT and other BIM software. We have found 3D scanning to be effective in providing measurements for custom fit features and the development of as-built documents.

Use of 3D design tools allows engineers and architects to vividly demonstrate how a design works and allows a level of understanding previously unknown in site work construction. Collaboration and coordination with our MEP and architectural design partners is one of the most important aspects of our work. CTS’ experience in the 3D/BIM environment makes that effort much easier and yields a higher quality design.

ABout our teamFirm BackgroundCTS was founded in 2012 to provide solutions to Architects, Engineers, Contractors, Owners, and Facility Managers (AECO+FM). We are laser focused on providing reality capture technologies such as 3D Laser Scanning, Building Information Modeling, and As-Built Solutions to deliver better building and construction projects.

We support pre-development, pre-construction, commercial, residential, and industrial environments to rapidly as-built facilities and produce high-confidence, survey-grade as-built documents and models. We verify millions of points a second, to millimeter accuracy, in hours not days.

3D Laser Scanning ServicesAs-Built Surveys for BIM VerificationMEP System SurveysBuilding Structural SurveysFloor Flatness ExhibitsAs-Built SurveysBeam Deformation SurveysFloor Thickness SurveysFloor Flatness SurveysConstruction DocumentationArchitectural SurveysTopographic SurveysVolume Analysis / CalculationsDrainage SurveysSolar Panel Surveys

Deliverables2D CAD Plans3D CAD Plans / 3D Models3D Revit ModelsBuilding Information ModelsPoint Clouds

INDUSTRIES• Architecture• Engineering• Construction• Owner/Development• Facility Management

P 408.703.1465C [email protected]

KEY CONTACT

Leo CastilloPRESIDENT

CTS provided 3D Laser Scanning services for the development of a 1,850,000 sf, 68,500 seat sports arena.

We performed as-builts of pre and post pour concrete walls and decks for flatness and plumb, and also by analyzing post pour scan data we were also able to provide a deliverable verifying flatness and level of concrete floors as well as the deflection in structural beams and pan decking.

This became a “digital concrete core” to show the thickness of the poured concrete deck and provide verification for the Owner, Sub and General Contractor.

LocationSanta Clara, CA

General ContractorTurner-Devcon

Size68,500 seats

Completion Date2014

Construction Cost $1.4 Billion

Project Services• As-Built Scanning• 3D Laser Scanning

levi’s stadium

After years of searching for a new downtown location for the Sacramento King’s Arena, the team worked with the City of Sacramento to develop a new arena in the heart of the city. The new arena is located on the site of a former major shopping mall in downtown Sacramento.

CTS is providing 3D Laser Scanning Services for the project. Our scanning crews worked with the general contractor, architect, and structural engineer on scanning the exterior of the structure as pieces were installed to maintain and compress schedule, as well as quality assurance of pre-fabricated custom exterior panels manufactured from the BIM.

LocationSacrameno, CA

General ContractorTurner Construction

Size17,000 seats

Completion Date2016 (expected)

Construction Cost $477 Million

Project Services• 3D Laser Scanning• As-Built Documentation

King’s Downtown Arena

CTS provided 3D Laser Scanning and Building Information Modeling services for significant improvements to the center.

Improvements included: new contiguous exhibition space; add 140,000 sf of exhibition space; 28,000 additional sf of meeting space, 87,000 sf of multipurpose space, and 178,000 sf of Moscone support space.

Our crews were able to to provide highly accurate interior scans to support the facility management group, project architect, mechanical engineer, electrical engineer, and plumbing engineer.

LocationSan Francisco, CA

General ContractorNA

Size433,000 Square Feet

Completion Date2013

Construction CostNA

Project Services• 3D Laser Scanning• Building Information Modeling

Moscone Center

CTS provided high definition survey and 3D laser scanning to correct seismic deficiencies in buildings 1, 6 and 8, replace building 12 with a new research building (67,500 to 82,500 sf), addition of a new 250 space parking structure, addition of 25,000 sf modular building and the renovation of 12,000 sf of space at various sites on the campus.

The laser scanning consisted of a 3D building document (as-built drawings) for Buildings 1, 6 and 8 and included a 3D model in Revit 2012.

Engineering services by our parent company SANDIS also included: design narrative for civil related site utilities (sanitary sewer, storm drain and water); fire hydrant testing for static and residual pressure; storm water management control plan; demolition plan; grading and drainage plans; utility plan; erosion control plan; and technical specifications. Services for the 25,000 modular building included: demolition plan; grading and drainage plan; utility plan; erosion control plan; storm water management plan; and technical specifications.

LocationSan Francisco, CA

General ContractorNA

Size200,000+ Square Feet

Completion Date2015

Construction Cost$1 Million+

Project Services• 3D Laser Scanning• Building Information Modeling

VA San Francisco Medical Center

LocationCupertino, CA

General ContractorRudolph & Sletten/Holder Construction

Size176 Acres + 1.5 Miles of Freeway

Completion Date2018 (expected)

Construction Cost $4 Billion

Project Services• 3D Laser Scanning• Building Information Modeling• Clash Detection

APPLE CAMPUS 2

CTS is working with Apple, Rudolph & Sletten, Holder Construction, Foster + Partners, and a variety of engineering consultants in order to provide daily and on-going 3D laser scanning and as-built BIM services for the new Apple Campus 2 during construction.

CTS has also been selected as the Siteworks BIM management consultant to manage contractors, trades and partners weekly submittal of as-built BIM data.

As part of the safety contract, CTS designed the system of as-built data submittal through an online portal, monitors and releases weekly progress models, links model objects to as-built data submittal forms for document control purposes, and trains construction staff to use the model for safe surface and subsurface digging procedure.

The complexity of new utilities needed to service the 176 acre site CTS has also provided modeling and clash detection services of utility systems. Our team takes the data from each civil drawing and imports it into a 3D model where utility conflicts can be seen and resolved before construction begins.

3D Scanning ExperienceBing Concert HallStanford UniversityCTS provided High definition survey/3D laser scan for the development of a 112,000 sf, 844 seat performing arts facility. Scanning was conducted to ensure a precise measurement for the installation of the ceiling “clips and sails.” Deliverables included: raw scan and image data, scan metadata, project metadata, control information, registration information for all raw scans (tied to the site coordinate system), digital images of scanning scenes, registered scan data, and point clouds.

Centennial Recreation Center Photovoltaic Solar Power Generation SystemsMorgan HillCTS provided a rooftop topographic survey and 3D laser scan for the installation of a solar photovoltaic system. The intent of the system is to provided needed energy to operate the 54,000 sf that does not exceed the facilities energy requirements.

UC Berkeley Boalt Hall Seat WallBerkeleyHigh definition survey/3D laser scan to aid in custom seat wall bench manufacturing.

DeAnza High School Replacement CampusRichmondCTS provided 3D laser scanning of the building canopy and panels. Services included scan of the curved canopies for Buildings 1, 2, 3 and 9; scan of the straight canopies for Buildings 1, 4, 5, 6, and 7; and a scan of the crown canopies on Building 8. We provided 2D (Buildings 1-7, 9) and 3D (Building 8) CAD plans and pdf’s documents showing plan views of the existing conditions for use in determining proper panel manufacture.

High Rise OaklandHigh definition survey/3D laser scan for structural performance and concrete desk analysis for confidential client/project.

Pier 41San FranciscoHigh definition survey/3D laser scan to develop as-built drawings for existing building.

SLACMenlo ParkHigh definition survey/3D laser scan for seismic improvements for the tunnel.

Additional 3D Scanning Projects• Mission College, Santa Clara• 451 University Avenue, Palo Alto• 375 Beale Street, San Francisco• 1995 N. 1st Street, San Jose• Bishop Ranch, Concord and San Ramon• Downtown Placemaking, Morgan Hill• Uvas Reservoir, Santa Clara County• 100 California Street• Google, Mountain View• Berkeley Planters• Stanford GSB• SLAC, Menlo Park• City College, San Francisco• Santa Clara University, Santa Clara• Benches at Cal• Kaiser Permanente, Oakland• VA, Sacramento• Berryessa Creek, Santa Clara County• Villa St, Mountain View• Terremark Regional Street Retail• Recreation Center, Morgan Hill• Anderson Dam Spillway, Santa Clara County• Pittsburg High School• Lucile Packard Children’s Hospital Walls, Palo Alto• Livermore Airport, Livermore• Steven’s Creek Development, San Jose• Bay Street, Emeryville• Kaiser Permanente, Redwood City• El Camino Hospital Data Rooms, Mountain View• Viveka Scooner Modeling• BART, Oakland• Bair Island Road, Redwood City• SF Int’l Airport Replace Air Traffic Control Tower• Motorola Building 1st Floor• On-Call Surveying, San Francisco• Crow Canyon Commons, San Ramon• San Jose Evergreen College Gullo Student Center, San Jose• Mermaid Inn• Power Substation• Albrae Street, Fremont• Forrest Avenue Development, Los Gatos• Jasper Ridge, Woodside• Stanford Stadium LED, Palo Alto• De Anza Homestead• 2901 Broadway, San Francisco• Kaiser Permanente, San Leandro• Sausalito City Hall, Sausalito

3D Scanning Experience

• AC2, Cupertino• Northrup Gruman Property, Sunnyvale• 451 University Avenue, Palo Alto• 81 Shore View Avenue, San Francisco• Stanford Stadium, Palo Alto• Tesla, Fremont• Martial Cottle County Park, San Jose• Santa Clara University, Santa Clara• VA Hospital, Menlo Park• Pete’s Harbor/Blu Harbor, Redwood City• Google Shorebird Campus Master Plan, Mountain View• Huff Gravel Parking Lot, Mountain View• Independence High School, San Jose• Shorebird Site 1, Mountain View• Shorebird Site 2, Mountain View

Building information modelingVA Medical CenterSan FranciscoHigh definition survey/3D laser scan to correct seismic deficiencies in buildings 1, 6 and 8, replace building 12 with a new research building, addition of a new 250 space parking structure, addition of modular building and the renovation of 12,000 sf of space at various sites on the campus. Scanning services were provided to create an accurate as-built condition record to assist in the complete renovation of these buildings, provide a record of utility locations for repair, maintenance and alterations. Deliverables included: raw scan and image data, scan metadata, project metadata, control information, registration information for all raw scans (tied to the site coordinate system), digital images of scanning scenes, registered scan data, and point clouds. Deliverable also included a 3D model at a level of detail of 300.

3159 El Camino RealPalo Alto, CACTS provided surveying and engineering services for a four-story, 74,122 sf office building (includes 48,860 sf of residential space for 48 rental apartment units and 31,262 sf of commercial office, retail and restaurant space); retention of an existing one-story, 6,616 sf of commercial space as well as the existing parking structure.

Surveying services included the preparation of a topographic survey. Engineering services included: pre-design dry utility coordination (site dry utility layout for planning and space allocation purposes); assistance in preparation of the Major Architectural Review Board Submittal package; grading plan; storm, sanitary sewer and water plans; LID/C3 storm water management plan; technical specifications; fire design plan (pipe sizing, flow analysis, fire system layout including fire hydrants, FDCs and PIVs for bidding purposes for site work only); and construction notes and details.

Additional Modeling Project