Economies of Climate Change in Northeast Asia project CDM National Bureau (DNA) Ministry of Nature, Environment and Toursim B.Tsendsuren Head of CDM DNA, Ministry of Nature, Environment and Tourism

Upload: ta7465

Post on 21-Jun-2015

174 views

Category:

Documents


1 download

DESCRIPTION

Presentation by Batsuuri Tsendsuren, MNET, at Mongolia's 1st National Workshop on the Economics of Climate Change and Low Carbon Growth Strategies in Northeast Asia.

TRANSCRIPT

Page 1: Current Activities of CDM DNA

Economies of Climate Change in Northeast Asia project

CDM National Bureau (DNA) Ministry of Nature, Environment and Toursim

B.Tsendsuren Head of CDM DNA, Ministry of Nature, Environment and Tourism

Page 2: Current Activities of CDM DNA

CDM National Bureau (DNA) Ministry of Nature, Environment and Toursim

Brief information on CDM in Mongolia

Current state of CDM in Mongolia

CDM projects in Mongolia Number

Registered projects in UNFCCC 3

Number of projects approved by CDM DNA 4

Number of project idea notes (PIN) endorsed by CDM DNA

14

The structure of Approval Committee, approvalprocedure and sustainable development criteria ofCDM project were adopted on August 7, 2009 by thedecision of Minister for Nature, Environment andToursim.

Legal framework Dates

Ratification of UNFCCC (non-annex I party) 1993 .09.30

Ratification of Kyoto protocol 1999.12.15

National committee on Climate Change was established 2000

Establishment of CDM DNA under Ministry of Nature, Environment and Tourism 2004.11.14

Page 3: Current Activities of CDM DNA

Project Idea

Project Idea Note/ PIN

Project design

document/ PDD

Registration Implementation

Verification/ DOE

Voluntary basis

Endorsement/ objection

10 working days

Obligatory

Approval/ Objection

30 working days

CDM project approval procedure/ CDM project cycle

CER issuance

№ Submitting PDDs and PINs to CDM DNA, MNET

15.1-When a PIN is submitted to the CDM DNA together with letter of request for Endorsement , CDM DNA will send the PIN to it’s each approval committee members within 3 working days .

2 5.3-CDM DNA will gather the evaluation of PINs from Appraisal committee members within 5 working days after sending it to their review.

35.4 –CDM DNA will respond to project developers within 10 working days by issuing endorsement letter or objecting the PINs if it doesn’t meet the sustainable development criteria.

4 6.3 –CDM DNA will designate a technical committee to review and comment on PDD after 3 working days since it is submitted.

5 6.5 –CDM DNA will put PDDs for public consultation on it’s website for 2 weeks after it’s submitted .

66.8 -ÒÁÁ-òýé õîëáîîòîé ñàíàëàà èëýðõèéëýõýýð õºíäëºíãèéí ýòãýýä 3-ààñ äîîøã¿é õîíîãèéí ºìíº óðüä÷èëàí òîâ÷îîíä ìýäýãäñýí áîë хурлын хэлэлц¿¿лэгт тºсºлд оролцогчдыг áàéëöóóëàí оролцуулж болно.

76.10 -Õîðîîíû ãèø¿¿í á¿ðèéí òóõàéí òºñºëä ºãñºí ¿íýëãýýíèé íèéëáýð ä¿í ñºðºã áóþó òàòãàëçñàí ýñâýë 0-ýýñ äýýø ýåðýã áóþó äýìæñýí áàéæ áîëîõ áºãººä òóñ á¿ð íýã ñàíàëä òîîöîãäîíî. Õорооны гиш¿¿äèéí ýíãèéí îëîíõûí ñàíàëààð òóõàéí òºñºëä òàòãàëçñàí ýñâýë áàòëàìæ áè÷èã îëãîõûã äýìæñýí øèéäâýðèéã ãàðãàíà. Ñàíàë òýíöñýí òîõèîëäîëä òîâ÷îîíû ñàíàëûã õàðãàëçàí ¿çíý.

8 6.11 -Хорооны даргûí гарын ¿сэг зурж áàòàëãààæóóëñàí ¿íýëãýýíèé øèéäâýðò ¿íäýñëýí òовчооны дарга òóõàéí тºсºлд оролцогчдод татгалзсан эсвэл áàòëàìæèëñàí àëáàí áè÷èã олгоно.

9 6.12- ЦХМ-ын тºслийн баримт бичгийн багцыг х¿лээж авснаас хойш àæëûí 30 õîíîãò áàãòààí áàòëàìæ áè÷èã îëãîõ ýñýõ òàëààðõ àëáàí ¸ñíû øèéäâýð ãàðãàíà.

10 7.1 -Сонирхлын зºрчилòýé ãýæ тухайн õîðîîíû гиш¿¿н ¿çâýë àëèâàà тºслийг¿нэлэхээс татгалзаíà. Ýíý òóõàéãàà хорооíä болон товчоонд мэдэгдэх ¿¿рэгтэй.

11 7.2 -ЦХМ-ын ¿ндэсний товчооны гаргасан шийдвэр òºсºлд оролцогчäûí àøèã сонирхлûã зºрчñºн ãýæ ¿çâýë õîëáîãäîõ õóóëü, òîãòîîìæèéí äàãóó ãîìäîë ãàðãàí øèéä¿¿ëýõ ýðõòýé.

12 Хэрэв дээрх øàëãóóð ¿ç¿¿ëýëò тус б¿рä ºãñºí îíîîíóóäûí íèéëáýð 0 болон ò¿¿íýýñ дээш байвал òóõàéí тºслèéã óëñ îðíû òогтвортой хºгжлийн шалгуурт нийцэж байна гэж ¿знэ.

Approval procedures of CDM DNA

CDM DNAProject Appraisal

Committee

-Ministry of Nature, Environment and Tourism-Ministry of mineral resources and energy-Ministry of Finance- Ministry of Food, Agriculture and Soft Industries- Íèéñëýëèéí çàñàãäàðãûí òàìãûí ãàçàð-Mongolian National chamber of Commerce and Industry-Mongolian association of Energy- National University of Mongolia- University of Science and Technology

Validation by DOE

Page 4: Current Activities of CDM DNA

Point

+2

+1

0

-1

-2

High (positive)

Moderate (positive)

Neutral (no impact)

Moderate (negative)

High(negative)

Projects will be evaluated on the basis of this sustainable development criteria. And all the projects must

comply Mongolian law. Projects that receive positive points will be issued

Endorsement/ Approval letter.

Sustainable development criteria for CDM projects evaluation in Mongolia

№ Criterias

1Impact on Environment

Impact on Climate Change of the world

Contribution to sustainable management of local natural resources

Contribution to reduction of other pollutants in the air

2Impact on Society

Impact on health and displacement of local people

Contribution to poverty reduction by creating jobs

3Impact on Economy and Technology

Efficiency and productivity of resource use

Know how and technology transfer to Mongolia

Creation of Infrastructure

4

Feasibility and Profitability of the project

International needs and demand

Attractiveness for the investors

Central and local government support

Sufficient infrastructure and human resources

Impact

Page 5: Current Activities of CDM DNA

CDM projects reported to the CDM DNA, Mongolia

№ Project Name Project Participants Annual СО2 reduction TotalInvestment

Current status

1 Energy conservation and emission reductions from poor households

Ch. BatTel/Fax:315347E-mail: [email protected]

75.0 – 90.0 thousand ton CO2-eq

10.3 million US$ PDD drafted

2 Improvement of heating systems in urban centers of Mongolia

T.Ganbold, [email protected], [email protected]

30,0 thousand ton CO2- eq 47.7 million US$ PIN

3 Energy efficiency rehabilitation for pre-cast panel buildings in Ulaanbaatar city

[email protected]

100.0 –110.0 thousand tonCO2eq

80.0 million US$ PDD stage

4Reconstruction boilers in Power Plants of Darkhan and Erdenet

T.Ganboldtel:99163103, 341371 Ext: 225, fax:[email protected]

32,0 – 33,0 thousand ton CO2-eq

15.0 million US$ PIN

5 Salkhit wind park (50 MW) [email protected]

180.0 – 190.0 thousand ton CO2- eq

85.0 million US$ Validation stage

6 Replacement of coal and wood fired heating by renewableheating system

[email protected]:317177/331356

15.445 thousand ton CO2-eq PIN

7Community based heating supply in rural remote areas of Mongolia

T.GanboldG.PurevdorjTel:99163103, 341371 Ext: 225, Fax:[email protected], [email protected]

17,0-23,0 thousand tonCO2- eq 2,0 million US$ PDD stage (financed by ADB carbon fund)

8Program of Energy Efficiency, Power Plant Darkhan

T.Ganboldtel:99163103, 341371 Ext: 225, fax:[email protected]

30,0 thousand tonCO2- eq 9.0 million US$ PIN

9 Energy conservation with utilisation of active mineral additives (pozzolans) in Cement production

Tsoodol- general managerTel: [email protected]

30,0 thousand ton CO2- eq 0.6 - 0.8 million US$ PIN

10Energy conservation with introduction of variable speed drive pumps for heating distribution in Ulaanbaatar

Sh.Munhjargal-general managerTel: [email protected]

30,0 thousand ton CO2- eq 6.5 million US$ PIN

Page 6: Current Activities of CDM DNA

CDM projects reported to the CDM DNA (continued)

11 Waste gas to green energy B.JigjidsurenTel: [email protected] [email protected] [email protected]

28,5 thousandton CO2

5,43 millionUS$

PDD stage

12 Geothermal heating supply in gerdistrict

Г.Мягмар, Deputy Director,Утас: 327252 Факс:322904E-mail: [email protected]

3 æèë= 99,6 ìÿíòí CO2-дүйцүүлэн

175,0 million US$

PIN

13 Maikhan Hydro Power Plant (12 MW )

Б. ДавгадоржÓòàñ:354257, [email protected], [email protected]

47.3 ìÿí òí CO2-дүйцүүлэн

9.8 million US$. PDD stage

14 Geothermal Project in Khangairegion of Mongolia

Т. Ганболд, ЦХМ-ын зөвлөх,Г. ПүрэвдоржУтас:99163103, 341371 Ext: 225, Факс:[email protected], [email protected]

50.0 ìÿí òí CO2 14.0 million US$ PIN

15 Reduction of CO2 while introducing the Ladle Refining furnace in Darkhan metallurgical plant of Mongolia

Äýä захирал Б. Цэрэннадмидутас: 1372-24203факс: [email protected] HTTP:/www.dmplant.mn/

30,0 thousand tonCO2-дүйцүүлэн

3.2 - 3.5 million US$

PIN

16 250 MW Khanbogd High power wind farm

ÿéöýòãýõ захирал С. Мөнхжаргалóòàñ:[email protected] , www.qleantech.net

1.412 ìÿí òí CO2-дүйцүүлэн

438 сая US$ PDD stage

17 Biogas plant in Mongolia Äэд захирал Н. Ганбаатарóòàñ: 976-329192 факс:311612гар утас: [email protected], [email protected] www.ntic.mn

2.312 ìÿí òíCO2- дүйцүүлэн

980.0 million US$

PIN

18 Shainshand wind farm Р. ДаваанямÓòàñ:[email protected] , www.monwea.mn

174.0 ìÿí òí CO2-дүйцүүлэн

75.0 million US$ PIN

19 Thaishir hydro power plant ЦХМ-ын зөвлөх Т. Ганболдутас:99163103, 341371 Ext: 225, факс:[email protected]

29.640 ton CO2-eq

НҮБ-ын уур амьсгалын өөрчлөлтийн суурь конвенцийн газарт бүртгэгдсэн.48 ßÁÁ –ã 2010 îíû 1-ð ñàðä àâñàí.

20 Durgun Hydro power plant ЦХМ-ын зөвлөх Т. Ганболд,утас:99163103, 341371 Ext: 225, факс:[email protected]

30.4 thousand tonCO2-дүйцүүлэн

НҮБ-ын уур амьсгалын өөрчлөлтийн суурь конвенцийн газарт бүртгэгдсэн.Õÿíàëò øèíæèëãýý õèéñýí òàéëàíáýëòãýãäýæ áàéãàà.

21 Retrofit program for decentralisedheating stations in Ulaanbaatar

Dipl. Ing. Walter Paulsen: Andreas Glas M.A.Tel.: +49 97 99 01-25 Tel.: +49 97 99 01-28Fax: +49 97 99 01-50

12 ìÿí òí CO2-дүйцүүлэн

НҮБ-ын уур амьсгалын өөрчлөлтийн суурь конвенцийн газарт бүртгэгдсэн. Îðîëöîã÷ òàëóóäûí çºð÷èëäººíººñ ¿¿äýíõýðýãæèõã¿é áàéãàà.

Page 7: Current Activities of CDM DNA

Address: Ministry of Nature, Environment and Toursim, CDM National Bureau (DNA)UN street 5/2, Government building 3, Tel: 976-51-266314Fax: 976-11-321401 Email: [email protected] Website: www.cdm-mongolia.com

CDM National bureau (DNA) Ministry of Nature, Environmentand Tourism

Potential sector for CDM projects in Mongolia

№ Projects Ангилал 1 Renewable Energy - Solar, wind, hydro and geothermal power stations

- Biomass, biogas

2Energy efficiency

- Energy efficiency in electricity and heat stations- energy efficiency in supply and demand side- Retrofit for small HOBs- Improving coal quality

3Electricity and heat supply efficiency in construction

- Energy efficiency rehabilitation for Pre-cast Panel buildings- Energy efficiency in lightning (PV lamp )- Energy conservation and emisision reductions from poor households

4 Industry

- Introducing of new technology in brick factory- Introducing new technology in cement production- Technology change in metallurgical plant

5 Waste management

-Composting-Utilization of landfill gas

6 Fuel switch - Gas

7 Other- Afforestation and Reforestation- Land use management- Coal mine methane utilization- Improving the stoves of ger district and quality of coal