current status and evolution prospects of the doris network

24
H. Fagard, A. Orsoni (IGN) 1 Journées DORIS - Toulouse, 2 et 3 mai 2000 CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK History Current status Prospects The network deployment Past evolution Station description and equipment distribution Maintenance: setup and statistics The host agencies DORIS in the IERS network DORIS and the tide gauges Antennas stability assessment Improvement of the antennas stability Planned new stations Third generation beacons Hervé FAGARD, Alain ORSONI (Institut Géographique National)

Upload: elizabeth-garner

Post on 01-Jan-2016

63 views

Category:

Documents


0 download

DESCRIPTION

History Current status Prospects. The network deployment Past evolution Station description and equipment distribution Maintenance: setup and statistics The host agencies DORIS in the IERS network DORIS and the tide gauges Antennas stability assessment - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)1 Journées DORIS - Toulouse, 2 et 3 mai 2000

CURRENT STATUS AND EVOLUTION PROSPECTSOF THE DORIS NETWORK

• History

• Current status

• Prospects

• The network deployment

• Past evolution

• Station description and equipment distribution

• Maintenance: setup and statistics

• The host agencies

• DORIS in the IERS network

• DORIS and the tide gauges

• Antennas stability assessment

• Improvement of the antennas stability

• Planned new stations

• Third generation beacons

Hervé FAGARD, Alain ORSONI (Institut Géographique National)

Page 2: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)2 Journées DORIS - Toulouse, 2 et 3 mai 2000

• 54 stations, 30 countries

• TOPEX coverage : 96 %• SPOT coverage : 86 %

The current network

Title: Données:DORIS:Présentations:carte2.epsi Creator: Ghostscript ps2epsi from MacGS Preview: This EPS picture was not saved with a preview (TIFF or PICT) included in itComment: This EPS picture will print to a postscript printer but not to other types of printers

Page 3: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)3 Journées DORIS - Toulouse, 2 et 3 mai 2000

• General requirements:– About 50 ground stations

– To ensure an almost constant visibility of at least one station by the on-board receiver (--> very homogeneous distribution)

• Site selection criteria:– Possible colocations with other space geodesy techniques

– Available support for the maintenance of the equipment

– No RF interferences to existing receiving devices (VLBI, radiosondes)

• Constraints for the installation of the equipment:– Beacon inside a building with electricity

– Stable support and clear view for the antenna

– Limited cable length between the beacon and the antenna(only 10 m until 1993, then 15 m)

Network deployment: requirements and constraints

Page 4: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)4 Journées DORIS - Toulouse, 2 et 3 mai 2000

• Deployment by IGN spread over 8 years (1986 to 1993) ---> 49 stations

• Since 1994 : 5 more stations (---> 54 stations)

• 32 stations installed when the first on-board DORIS instrument was turned on 10 years ago (SPOT-2 launch)

• 27 stations renovated and/or moved since the beginning of the network deployment

Network deployment: main steps

Page 5: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)5 Journées DORIS - Toulouse, 2 et 3 mai 2000

0

10

20

30

40

50

1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999

Number of stations at the end of the year Renovations

SPOT-2

TOPEXSPOT-3

Past evolutions of the network

SPOT-4

Page 6: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)6 Journées DORIS - Toulouse, 2 et 3 mai 2000

Stations renovations

Most stations renovations were motivated by :

• The closure or moving of a host agency• Damage to the antenna (e.g. knocked down by a storm)• The need to measure or improve a geodetic connection

A station renovation can include some of the following operations :

• Antenna change (Alcatel ---> Starec) and/or moving• Monumentation improvement• New geodetic survey• Beacon upgrade (version 1 ---> version 2)

Page 7: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)7 Journées DORIS - Toulouse, 2 et 3 mai 2000

• Beacon: or

• Antenna : Alcatel: or Starec:

• Backup power supply unit (UPS)

• Weather station measuring temperature, pressure and humidity

The components of a DORIS station

Page 8: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)8 Journées DORIS - Toulouse, 2 et 3 mai 2000

+ + +

24 stations 19 stations 11 stations

Distribution of the DORIS equipment

Page 9: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)9 Journées DORIS - Toulouse, 2 et 3 mai 2000

Beacons emissionsIGN (SIMB)IGN (SIMB)• Daily synthesis of the measurements• Interventions requestsDORIS stations (c/o host agencies)DORIS stations (c/o host agencies)DORIS Control CentreDORIS Control Centre• Problems analysis• Interventions requestsInterventions reports

The network maintenance

Page 10: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)10

Journées DORIS - Toulouse, 2 et 3 mai 2000

Maintenance statistics

• IGN’s maintenance service handles around 130 intervention requests per year (among which 12 beacon exchanges)

• Failure causes (model 1.0) :– Power supply : 70 % (should be solved with the 1.1 upgrade)

– Oscillator : 15 %

– Amplifier : 15 %

• Second generation beacons : – 4 failures out of 14 (incl. spares) installed beacons

– All failures : amplifier problems

– Replacement of 1st generation beacons, until the 3rd generation beacons are available

• Average operation rate : 85 % (--> TOPEX coverage > 80 %)

Page 11: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)11

Journées DORIS - Toulouse, 2 et 3 mai 2000

The host agencies

National survey agencies (13)

Space agencies (11)

Other scientific institutes (universities, polar institutes, etc.) (11)

Institutes of oceanography, astronomy or geophysics (12)

Telecommunication stations (3)

Meteorological stations (3)

Other (1)

Page 12: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)12

Journées DORIS - Toulouse, 2 et 3 mai 2000

• DORIS is one of the space geodesy techniques contributing to the realization of the IERS (International Earth Rotation Service) terrestrial reference system

• 33 DORIS stations out of 54 are collocated with other techniques:–VLBI (12 sites)

–Satellite Laser Ranging (11 sites)

–GPS (32 sites)

• Half of the collocated stations are in the Southern hemisphere

DORIS in the IERS network

Page 13: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)13

Journées DORIS - Toulouse, 2 et 3 mai 2000

Collocations with other IERS techniques

Title: Données:DORIS:Présentations:carte_col2.epsi Creator: Ghostscript ps2epsi from MacGS Preview: This EPS picture was not saved with a preview (TIFF or PICT) included in itComment: This EPS picture will print to a postscript printer but not to other types of printers

Page 14: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)14

Journées DORIS - Toulouse, 2 et 3 mai 2000

• 16 DORIS stations are located less than 10 km away from a GLOSS tide gauge

• Geodetic connection available at 9 sites (bold names) out of 16

Collocations with GLOSS tide gauges

Title: Données:DORIS:Présentations:carte_col_gloss.epsi Creator: Ghostscript ps2epsi from MacGS Preview: This EPS picture was not saved with a preview (TIFF or PICT) included in itComment: This EPS picture will print to a postscript printer but not to other types of printers

Page 15: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)15

Journées DORIS - Toulouse, 2 et 3 mai 2000

Are the DORIS antennas stable ?

The overall antenna stability depends on the stability of:

• The mounting structure:– Metal tower (guyed or not)

– Steel pole

– Metal interface

• The monument on which this structure is installed:– Concrete pillar or block (founded or not on the underlying bedrock)

– Building

• The geological structure on which the monument is located

Page 16: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)16

Journées DORIS - Toulouse, 2 et 3 mai 2000

Antenna location selection: constraints

• Beacon inside a building

• Clear horizon around the antenna

• Antenna cables length: 10 m until 1992, then 15 m

tgα=H−hd

Page 17: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)17

Journées DORIS - Toulouse, 2 et 3 mai 2000

Antenna support: 1st generation (-->1992)

• Stability requirement: a few cm (expected DORIS positioning accuracy = 10 cm)

• Guyed metal tower: guy-wires not always placed so as to guarantee a long term antenna stability

• Alcatel antennas:– Phase center position known to within ± 5 mm

– Difficult to survey and center

– No accurate verticality adjustment

– Catches the wind

• Maximum cable length: 10 m

• Measured eccentricities after several years:1 to 3 cm

Page 18: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)18

Journées DORIS - Toulouse, 2 et 3 mai 2000

Antenna support: 2nd generation (1993-->)

• Stability requirement: 1 cm over 10 years(Achieved DORIS positioning accuracy = 2 to 3 cm)

• Starec antennas available:– Phase center position known to within ± 1 mm

– Easy to accurately survey and center

– Resist high winds

• Improved guying and verticality adjustment: – 3 guy-wires @ 120°, whose tension is adjusted to reach

a mm level centering

– The supporting plate can be leveled so as to adjust the antenna verticality within ± 1 mm

• Excellent short term rigidity and stability, but long term stability still dependent on the guy-wires

Page 19: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)19

Journées DORIS - Toulouse, 2 et 3 mai 2000

Antenna support: 3rd generation (recent and future installations)

• Stability requirement: better than 1 cm over 10 years (DORIS positioning accuracy approaching 1 cm)

• Antenna supports:– Forced centering plate on a concrete monument

– Metal mounting structures not needing guying

• Monuments: – Prefer ground installation rather than buildings

– Concrete pillar founded on bedrock when possible

– Buildings: antenna on a load-bearing wall

Page 20: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)20

Journées DORIS - Toulouse, 2 et 3 mai 2000

The network’s future evolutions will aim at improving :

• The long term stability of the antennas(stations renovation action)

• The global coverage(a few more stations to fill in the remaining “holes”)

• The equipment’s reliability(deployment of a new generation of beacons)

Evolution prospects: objectives

Page 21: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)21

Journées DORIS - Toulouse, 2 et 3 mai 2000

Improvement of the antennas stability

• Stations renovations action under way:– Antenna stability estimation ---> priority list

– Several renovations planned in 2000-2001

• Monument stability:– Monument founded on bedrock when possible

– Buildings: only low elevation, stable structure

• Antenna support:– Interface on concrete monument

– Otherwise very rigid tower without guying

• Site geodetic survey including footprints

• Selection of future sites taking into account their geological stability ?

Page 22: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)22

Journées DORIS - Toulouse, 2 et 3 mai 2000

Planned new stations and renovations in 2000

Title: Données:DORIS:Présentations:carte_dens2000.epsi Creator: Ghostscript ps2epsi from MacGS Preview: This EPS picture was not saved with a preview (TIFF or PICT) included in itComment: This EPS picture will print to a postscript printer but not to other types of printers

Page 23: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)23

Journées DORIS - Toulouse, 2 et 3 mai 2000

Third generation beacons

• Main new features:– Possible frequency shift, avoiding jamming by nearby stations

– Modulated 2 GHz channel

– Unambiguous internal International Atomic Time

– Can be received even if the time has not been set

– Possible remote control through a telephone line or Argos terminal

• Planned delivery schedule :– Prototype in July 2000

– 10 units per year from 2001 to 2004

Page 24: CURRENT STATUS AND EVOLUTION PROSPECTS OF THE DORIS NETWORK

H. Fagard, A. Orsoni (IGN)24

Journées DORIS - Toulouse, 2 et 3 mai 2000

To all the host agencies :

Thank you for your contribution

to the success of DORIS

Acknowledgements