current updates offshore lng infrastructure plans pertamina gas niaga... · current updates...
TRANSCRIPT
Current Updates
Offshore LNG Infrastructure Plans
September 2016
Kusdi WidodoGeneral Manager LNG
DISCLAIMER
The presentation is made solely for the purpose of this event and is not intended to be and should
not be used by any other person or entity. The contents may contain copyright and/or legally
privileged information and the reader must therefore not use, copy, disclose or take any action
based on this presentation material or any information herein.
PT Pertamina (Persero) and its respective subsidiaries, affiliates and associated companies (or by
any of their respective officers, employees or agents) will not in any manner whatsoever be deemed
or construed to implicitly or explicitly represent or warrant the accuracy or completeness of the
information or the contents of this presentation material. All consequences and/or liabilities
(including without limitation, those arising from negligence) to other parties for the utilization of the
documents are specifically disclaimed.
2
Background
Company Overview
Market Overview
Pertamina Infrastructure
LNG Infrastructure Current Update & Plans
Challenges
Pertamina initiative at LNG distribution
Outline
LNG FOR DOMESTIC
BACKGROUND
INDONESIA LAW RELATED GAS BUSINESS
UU No. 30/2007 : Energy diversification program
Perpres No. 5/2006 : The energy mix with target
up to 30% by using gas 2025.
UU No. 22, 2001 unbundling Shipper &
Transporter, Pertamina formed Pertagas Niaga
ENERGY MIX INDONESIA
20%
30%33%
17%
Gas857 Mboe
47%
24%
24%
5%
Energy Mix Indonesia 2011
Coal
283 Mboe
NRE
59 Mboe
Oil
553 Mboe
Gas
283 Mboe
Energy Mix Indonesia 2025
Coal
943 Mboe
NRE
486 Mboe
Oil
571 Mboe
100% = 1,176 Mboe 100% = 2,857 Mboe
Legend :NRE : New Renewable EnergyMboe : Million Barrel Oil Equivalent
COMPANY OVERVIEW
INTEGRATED
UPSTREAM -
DOWNSTREAM
27,429EMPLOYEES
REVENUE
$70.6BILLION
PROFIT
$2.8BILLION
RANKED in FORTUNE 500 AND FIRST INDONESIA COMPANY IN FORTUNE 500
=
130th
2014 Key figures
Established - PT Perusahaan Minyak Nasional
(PERMINA)
Merger PERMINA & PERTAMIN to be PERTAMINA
Formed Gas Utilization Division
Established PT Pertamina Gas
Established PT Pertagas Niaga (PTGN)
(Shipper)
1957
1968
1989
2007
2010
COMPANY HISTORY – PERTAMINA – PERTAGAS NIAGA
Per Men ESDM 19/2009 - Unbundling scheme
(Transporter & shipper)2009
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
11,000
12,000
13,000
9,1218,9108,672
8,4538,260
7,881
6,769
5,994
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
5,1994,868
7,028
Indonesia Gas Balance in the High Supply Scenario
mmscfd Existing Others
Existing Pertamina
New others
New Pertamina
New discovery
LNG - allocated
LNG - potential
LNG imports - contracted
Source: Pertamina Gas Balance 2025_V 2014
HIGH SUPPLY CASE
• LNG allocations made to
NR, Lampung, Arun and
Banten, Jateng, Cilacap
• Potential LNG from Mozambique
Area 1 (HOA Signed), BG, Brunei
LNG, Total
Domestic gas
demand – High case
- Data Demand : Existing data + RUPTL
- Industrial Data : Existing, update for North Sumatera
- Data Update for CNG, City Gas, IPP & NRE based on Pertamina data
PERTAGAS NIAGA LINE OF BUSINESS
Piped Gas Distribution
LNG Business
Mini LNG Plant
(Future)
CNG Product
LNG for
Domestic Market
City Gas
LNG Bunkering LNG VGL LNG Cooling Down
521
225
183
32820
85
Indonesia Gas Market
49
824
106
Total 2,341 MMSCFD
* Industry & Power Market, Moderate number
SCFD
PERTAMINA INFRASTRUCTURE
PERTAMINA GAS ASSET
GAS PIPE INFRASTRUCTURE – EXISTING & ON PROGRESS
• Dimension : (JABAR)24” X 45 KM (Citarik - Nagrak )24” x 27 KM (TG – Nagrak)
• Consumer : Commercial
• Dimension :various size X 366 KM (Rambutan Pusri)
• Consumer : Commercial & Plant
Key LNG Project PERTAMINA GROUP
PT Badak NGLLocation :Bontang, Kalimantan
Design Capacity :22.5 MTPA
Total LNG Train :8 trains
(4 trains still operate)
PT Pertagas Niaga LNG for Mining’s Heavy
Eq. Vehicle ProjectLocation :East Kalimantan
Operator :Pertagas Niaga (100%)
Customer :Coal Companies, commercial
PT Arun NGLLocation :Lhokseumawe, Aceh
Design Capacity :12.5 MTPA
Total LNG Train :6 trains
Arun LNG Receiving & Regasification
Terminal Location : Lhokseumawe, Aceh
Capacity : 3 MTPA (400 MMSCFD)
Main Customer: PLN & Local Industries
* Will be integrated with Trans Sumatera Gas
Pipeline
Donggi Senoro LNG PlantLocation : Central Sulawesi
Capacity : 2 MTPA
COD : 2015
FSRU West JavaLocation : Jakarta Bay
Capacity : 3 MTPA (400 MMSCFD)
Project Owner : Pertamina (60%)
PGN (40%)
COD : May 2012
FSRU Central JavaLocation : Cilacap
Capacity : 3 MTPA (400 MMSCFD)
Project Owner : Pertamina Gas (min. 60%)
* Will be integrated with Trans Java Gas Pipeline
PT Pertagas NiagaSumbagut LNG
Retail by Using LNG ISO Tank TruckLocation : Sumbagut
Capacity : 14 MMSCFD
COD : 2016
EXISTING
PLANNED
FSRU BalikpapanLocation : Balikpapan
FSRU SorongLocation : Sorong
FSRU Ujung PandangLocation : Ujung Pandang
CHALLENGES IN LNG OFFSHORE INFRASTRUCTURE
1. Demand Certainty2. Cost allocation3. Permit-Licenses
LNG PlantPT Badak NGL
Filling Station
Trucking + ISOTank
LCT + ISOTank
LNG Storage Regas
Satellite terminal
Converter kit
Mining Customers
Power plant
Industry
SPA LNG PTGN - CUSTOMERS
CUSTOMERS
SCOPE PTGN
SPA LNG PTGN – LNG SELLER
LNG Domestic Business Model
Direct Business
Via Offtaker
Channel Option :
NEW FILLING STATION
PLANT-24
PT BADAK NGL
PLANT-26
LNG Filling Station:Plant-24 : capacity 1 ISO tank/ 9 daysPlant-26 : capacity 1 ISO tank/ day New Plant : More than 70 ISO tank/day
NEW PLANT CARGO DOCK
LCTGantry Crane
SEMI TRAILER
CARGO DOCK
Expertise at LNG Retail
BERAU COAL
INDOMINCO
BALCONY MALL1. Deliver by Truck 330 HP and ISO tank 20 ft.2. LNG Pilot Project:
a. Berau Coal = 500 Km or 3 Days (Aug’14, Mining Dump Truck Komatsu HD – 645 )
b. Indominco = 25 Km or 1 Hours (Dec ‘13, Mining Dump Truck Volvo)c. Balcony Mall (Balikpapan) = 240 Km or 12 Hours (Dec’14,Genset &
Chiller)d. Ciptra Kridatama = Kit has already installed (waiting for Trading
License from Ditjen Migas)
Truck Delivery
Loading Process
LNG Retail for Commercial Customer
LNG Retail for Mining
LNG Retail for Exploration
Trial Process LNG VGL
Cooling Down and Filling LNG ke VGL Cylinder
SAFETY ASPECTS:
Gloves Cryogenic
Overall Cryogenic
Safety Shoes
Helm
Goggles
Applications
Thank You