cv doc pc

4
AHMED IQBAL +92 332 228 4921 [email protected] Objective To continue a career-oriented job in a reputable organization where the professional experience and skills can be utilized and developed. Technical Education Bachelor of Technology B. Tech in Electrical Engineering from Preston University, Karachi passed in the Year March 2015. Diploma of Associate Engineer 3 Years DAE in Electrical Engineering from Jinnah Polytechnic Institute, Karachi passed in the Year 2012. Academic Education Matriculation from Asmara Secondary School Karachi Passed in the year 2006 Work Experience MIMA & Bros as Electrical Projects Coordination Engineer March 2011-Continue Controls & Monitors the actual execution of all electrical related works of site project, correspondence projects billing, compile the documents after completion of projects with other Site & official matters. Generally responsible for implementation and monitoring of all electrical related works. Estimates, prepares and assign the resources such as manpower, material, consumables, equipment, tool, etc. required for all electrical and related works prior to execution.

Upload: ahmed-iqbal

Post on 13-Feb-2017

26 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CV DOC PC

AHMED IQBAL+92 332 228 [email protected]

ObjectiveTo continue a career-oriented job in a reputable organization where the professional experience and skills can be utilized and developed.

Technical Education

Bachelor of Technology

B. Tech in Electrical Engineering from Preston University, Karachi passed in the Year March 2015.

Diploma of Associate Engineer

3 Years DAE in Electrical Engineering from Jinnah Polytechnic Institute, Karachi passed in the Year 2012.

Academic Education

Matriculation from Asmara Secondary School Karachi Passed in the year 2006

Work Experience

MIMA & Bros as Electrical Projects Coordination Engineer March 2011-Continue

Controls & Monitors the actual execution of all electrical related works of site project, correspondence projects billing, compile the documents after completion of projects with other Site & official matters.

Generally responsible for implementation and monitoring of all electrical related works.

Estimates, prepares and assign the resources such as manpower, material, consumables, equipment, tool, etc. required for all electrical and related works prior to execution.

Interprets construction drawings and studies the contract document and applicable standard or specification prior to execution of any jobs.

Plan the execution of all electrical related works and coordination the works to mechanical and civil groups.

Coordinates with Client / Consultant’s representatives for any site instructions and inspection of works.

Page 2: CV DOC PC

Assign targets for accomplishments and ensure targets are met on daily basis for all electrical groups at site.

Submits site daily reports, inspection requests, estimates and all applicable monitoring reports on regular basis or as required.

Ensure that all site works are done according to all applicable quantity standards.

Directly responsible for the safety of all electrical group’s personal of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.

Prepared Billing as per measurement sheet at site complete in all respect, Sign all extra item, quantity variation, should acknowledge all approved and sign document should be part of bill.

Whole the verification of submitted Running/ Final bill checked at site on my good self, and resolved the matters regarding billing processing and finalized payment certificate by consultant/client on my duty.

Prepared Rate Analysis of Additional Works.

Technical Supports with drafting staff to prepare as-built & shop drawing.

Verify Sub Contractor’s Bill as per the work done at site.

Attending meeting with Consultant & Client from all others matter.

MIMA & Bros (April 2008 – February 2011 as Head of MEP Drafting Section )

Designing and preparation of As-Built and Shop Drawings for Mechanical, Electrical & Plumbing Works.

Major Projects:1. Citi Bank Head Office Site Area

Karachi2. Barclays Bank Head Office

Karachi3. Brookes Pharma Korangi

Karachi4. Indus Hospital Korangi

Karachi5. I.B.M Office Shahrah-e-Faisal

Karachi6. Khaadi Factory Site Area Karachi7. JPMC Hospital

Karachi8. KESC Office Civic Centre Karachi9. IBA Academic Block Main Campus Karachi10. IBA Auditorium Main Campus

Karachi11. Deutsche Bank AG, Avari Towers Karachi12. Jinnah Medicare Heart Hospital

Karachi13. Oasis Club House Lahore14. S. Abdullah Builders Mall Islamabad

Page 3: CV DOC PC

15. State Bank of PakistanHyderabad

16. TATA Pakistan Kotri17. K-Electrical Azm Learning Institute

Karachi18. TCS-Ecom DHA Karachi19. IBL Building Center Karachi20. South Asia Pakistan Terminal

Karachi

Other Courses:

AutoCAD MS Office

Personal InformationFather’s name: Javaid IqbalCNIC No: 42101-7861705-3Date of Birth: 08-08-1989Marital Status: MarriedLanguages: Punjabi, Urdu & EnglishAddress: House # 19 Block 31, Sector 5/G, North Karachi,

PakistanDomicile: Sindh, KarachiPassport No: GD1337052