cv - javed-asad may, 2013.doc
DESCRIPTION
cvTRANSCRIPT
JAVED ASAD
CURRICULUM VITAE
NAME JAVED ASAD
FATHER’S NAME MUHAMMAD ALI
DATE OF BIRTH APRIL 7, 1965
P.E.C. REGD NO. CIVIL /15784
N.I.C NO. 31303-7701766-7
DOMICILE RAHIM YAR KHAN
NATIONALITY PAKISTANI
PERMANENT & 30-FAZEELAT TOWN
POSTAL ADDRESS RAHIM YAR KHAN
CONTACTS Cell: 0300-6747097,
E-MAIL ADDRESS [email protected] & [email protected]
KEY QUALIFICATION: -
Practicing as professional CIVIL ENGINEER since 1994, in the field of Construction,
Irrigation Projects, Hydraulic Structures relating to Roads and Irrigation projects, Small
Dam Projects. Planning, Supervision and Execution of construction activities.
Successfully completed the Diploma of Quality Control (QC/QA) from Building and
Road Research Laboratories LAHORE.
QUALIFICATIONS: -
B.Sc. Civil Engineering in first division from University of Engineering & Technology
Lahore, Pakistan.
B. Sc. (Science) in first division from Islamia University Bahawalpur.
Higher Secondary School Certificate (Faculty of Science) in first division from Board of
Intermediate & Secondary Education, Bahawalpur.
Secondary School Certificate in Science Group in first division from Board of
Intermediate & Secondary Education Bahawalpur.
COMPUTER PROFICIENCY: -
1. MS OFFICE
2. Auto CAD R14 & 2000
3. MS PROJECT
Page 1 of 10
JAVED ASAD
EXPERIENCE
Employer: - Management Consultants (MC) Darawat Dam Project Hyderabad.
( Joint Venture of NDC & CAMEOS.)
Period: - April 2011 to date
Position Held: - Principal Quality Control Engineer.
Project - ENGINEERIING PROCUREMENT AND CONSTRUCTION OF DARAWAT
DAM PROJECT.
Project Introduction: -This project includes Construction of Concrete gravity dam and
irrigation system consist of 45 km long Concrete Lined irrigation
channel, Aqueducts, Head Regulators, Cross Regulators, Pipe & RCC
Culverts, Road Bridges, Three Km long RCC Pile mounted Irrigation
pipe line. Twenty km long approach road, Construction of Employer
Colony. The total quantity of Concrete for the Project is more than
150,000 Cubic meter. This is an EPC contract which is being
constructed by M/S Sinohydro Corporation Ltd.(A Chine’s
construction company)
The Total Cost of the Project is 7,554,688,700 Rupees.
Responsibilities: -
Supervision of all the Construction Activities according to Project Specifications as
Principal Quality Control Engineer.
Quality assurance of material testing in the Laboratory at all levels.
Daily monitoring & Control of Site Progress to the best levels.
Coordination with the Client & Contractor for timely completion of the Project.
Correspondence with the Clint & Contractor regarding technical issues.
Checking the quality of work at all levels.
Employer: - National Development Consultants
Period: - August 2010 to March 2011
Position Held: - Resident Engineer (Structures)
Project: - Small Dams Projects
Project Introduction: -This assignment includes feasibility study and preparation of PC1 for
Hingole, Drawat and Pappin dams.
Responsibilities: -
Involve in preparation of PC1 of these Dams and preparation of feasibility report etc.
Page 2 of 10
JAVED ASAD
Involve in Preparation of Contract Documents and Technical specification for the
Hingole Dam.
Employer: - Jinnah Hydropower Project Consultants ( Joint Venture of ACE,
NDC,MWH & NESPAK in association with DMC LHR, EASE PAK).
Period: - February 2008 to July 2010
Position Held: - Assistant Resident Engineer (Work as Resident Engineer at Site)
Project - Jinnah Hydropower Project, District Mianwali.
Project Introduction: -This project includes Construction of Headrace Channel, Powerhouse
and Tailrace Channel. The Powerhouse consist of 8- Units with
production capacity of 12-MW each , Erection and Unloading Bays ,
Office Buildings, 132-KV Switchyard , 7- Km long Transmission Line
from Powerhouse to Mari Grid Station. The total quantity of
Reinforced Concrete for the Project was 288,000 cubic meter. This was
an EPC contract which is being constructed by Dongfong Electric
Corporation (A Chine’s construction company)
The Total Cost of the Project was 128 Million US Dollars.
Responsibilities: -
Supervision of all the Construction Activities according to Project Specifications as
Resident Engineer. The Project is a run of the river hydropower project with 96-MW
generating capacity, using low head bulb turbines working with a discharge of 84,200
cusecs.
Quality assurance of material testing in the Laboratory at all levels.
Daily monitoring & Control of Site Progress to the best levels.
Coordination with the Client & Contractor for timely completion of the Project.
Correspondence with Contractor regarding technical issues.
Checking the quality of work at all levels.
Employer: - Punjab Barrages Consultants (NDC & NESPAK JV in association
with ATKINS Global UK).
Period: - April 2007 to February 2008
Position Held: - Principal Engineer (QA/QC)
Project: - Taunsa Barrage Emergency Rehabilitation and Modernization Project.
Kot Addu.
Page 3 of 10
JAVED ASAD
Project Introduction: -This project included Construction of new Sub Weir 4346 ft long,
Right & Left Abutment, Right & Left Fish Ladder, Navigation Lock,
Right & Left Flared Out Wall (U/ S & D/S), Extension of D/S Right &
Left Guide Bank, Rehabilitation of the Existing Barrage which include
Repairs and improvements to the existing Barrage downstream Glacis
and downstream floor, Remodeling of fish ladders and repair of
downstream flared out walls. Construction of silt Excluder in the Right
Under sluice Pocket and raising of the crest of D.G.Khan Canal Head
Regulator.
The Total Cost of Civil Works Project is 4,527 Million.
Responsibilities: -
Supervision and Quality Assurance and Control of all the Construction Activities
according to Project Specifications like construction of New Subsidiary Weir D/S of
Main Barrage having a reinforced Concrete quantity of 250,000 m³ in a record time
of 11 months, dismantling of old Concrete from D/S Glacis and Floor of the Main
Barrage, placement of new concrete at Main Barrage, Drilling and Grouting to fill the
cavities under the floor & within the Concrete, Installation of permanent and
temporarily sheet piles, construction of cofferdams, construction of Block & Stone
Apron both at Main Barrage & Sub-Weir, Guide Bank, Flared out wall, Fish Ladder
and Silt Excluder.
Quality assurance of material testing in the Laboratory at all levels.
Daily monitoring & Control of Site Progress to the best levels.
Coordination with the Client & Contractor for timely completion of the Project.
Correspondence with Contractor regarding technical issues.
Checking the quality of work at all levels.
Checking & Verification of Monthly Payment Certificate submitted by contractor.
Employer: - Punjab Barrages Consultants (NDC & NESPAK JV in association
with ATKINS Global UK).
Period: - November 2005 to April 2007
Position Held: - Assistant Resident Engineer (Construction)
Project: - Taunsa Barrage Emergency Rehabilitation and Modernization Project.
Kot Addu.
Page 4 of 10
JAVED ASAD
Project Introduction: -This project includes Construction of new Sub Weir 4346 ft long ,
Rehabilitation of the Existing Barrage which include Repairs and
improvements to the existing Barrage downstream Glacis and
downstream floor, Remodeling of fish ladders and repair of
downstream flared out walls. Construction of silt Excluder in the Right
Under sluice Pocket and raising of the crest of D.G.Khan Canal Head
Regulator. Contractor’s colony, Offices for Contractors &
Consultants.
Responsibilities: -
Supervision and Checking of all the Construction Activities according to Project
Specifications related to the construction of New Subsidiary Weir & Rehabilitation of
Main Barrage which are as follows:-
Construction Supervision of 4346 ft long reinforced Concrete Sub-Weir where the
Concrete was more than 250,000 m³ and of Steel was 14,000 Ton.
Construction Supervision of Silt Excluder in the Right Pocket for D. G. Khan Canal.
Supervision of dismantling of old Concrete from the D/S Glacis and Floor of the Main
Barrage. Then laying of new reinforced Concrete on the Glacis & Floor. The quantity
of Concrete was 49,000 m³ and more than 1,800 Ton Steel was involved.
Checking the levels, Alignment and verticality of the Permanent Sheet Piles which
were installed in 4- line with depth of 18 ~ 25 ft in the bed having a length of 4346 ft
each line.
Construction Supervision of new of Right & Left Fish Ladder with 7 ft thick
reinforced Concrete wall.
Construction Supervision of Reinforced Flared out Walls both on U/S & D/S of Sub-
Weir.
Construction Supervision of Extension of Right & Left Fish Ladder with 7 ft thick
reinforced Concrete wall.
Construction Supervision of Feeding Channel having a capacity of 2,500 Cusec
Discharge to feed the D. G. Khan Canal during Closure period.
Check the accurate setting of Works in relation to original points, lines and levels.
Checking the Installation of Sill Beams on the Main Barrage.
Checking of Stone Apron, Block Apron over Filter Material, Wire Crates and Stone
Pitching on U/S & D/S of Sub-Weir and Guide Bank.
Page 5 of 10
JAVED ASAD
Occasional checking and supervision of Concrete Batching Plants having a capacity
of 100 m³/hr and 30 m³/hr.
Review and approval of Lift & Shop Drawings for structures submitted by the
Contractor.
Checking the quality of work at all levels.
Checking of Monthly Payment Certificate submitted by contractor.
Supervision and checking of construction activities for Contractor’s Colony, Hospital
Building, Rest House Building for I&P Department, School Building and Infra
structure.
Employer: - AREAA Construction (Turkish Construction Company)
Period: - July 2005 to November 2005
Position Held: - Deputy Technical Chief / Technical Manager
Project: - Construction of 2000 Houses in Bharia Town Rawalpindi.
Housing Scheme Project.
Project Introduction: -This project includes Construction of 2000 houses in one years,
Construction of Treatment Plants, Infra structures, Shopping center,
Club Building etc.
Responsibilities: -
Worked as an In charge of Technical Office. Review and preparation of Lift & Shop Drawings for Houses and Infra structures.
Joint site inspection with Consultants regarding Structure steel arrangement,
Shuttering arrangement etc before Concreting.
Correspondence with Consultant regarding technical issues.
Submission of proposals to Consultant regarding variations due to site situations.
Quantity calculation for all type of Structures on this Project.
Preparation of Monthly Payment Certificate.
Cost Analysis and Variation Order Preparation.
Employer: - TEKSER Construction Industry & Trading Inc.
Period: - December 1998 to July 2005.
Position Held: - Senior Structural Engineer/ Asst. Technical Manager.
Project: - Chashma Right Bank Irrigation Project Stage III, D.I.Khan.
Project Introduction: -This project includes 135 Km concrete lined canal along with service
Road, Road Bridges (21-Nos) having Piles Foundations and Pre Cast
Page 6 of 10
JAVED ASAD
Post Tensioned Girders along with approach roads, Canal Aqueducts
(2-Nos), Canal Culverts (5-Nos), Super passages to carry flood water
over the Canal along with Bridge Barrels(18-Nos) Cross & Escape
Regulators along with Bridges (20-Nos).
The project has been financed by Asian Development Bank
(ADB), KFW, and Government of Pakistan. The Engineering Services
are rendered by world leading Consultants HARZA Engineering
Company (USA), SOGREAH (France) and NDC (Pakistan).
Responsibilities: -
Worked as Senior Structural Engineer, Responsible for the construction of reinforced
concrete Hydraulic Structures like Canal Aqueducts (2-Nos), Canal Culverts (5-Nos),
Super passages to carry flood water over the Canal along with Bridge Barrels(18-Nos)
Cross & Escape Regulators along with Bridges (20-Nos).Where pouring of 252,000
m³ Reinforced Concrete and fabrication of 6,000 Ton Steel was involved.
Execution of Work according to Drawings, Specifications and approved Planning
Schedule.
Analysis of Project requirement and arrangement of Equipment, Manpower and
material accordingly.
Joint site inspection with Consultants regarding Structure steel arrangement,
shuttering arrangement etc before Concreting.
Construction and supervision of Contractor’s Colony, Infra structure and other
facilities at every 30 Km along the Canal length.
Correspondence with Consultant regarding technical issues.
Assure the Quality of work according to Technical Specification.
Submission of proposals to Consultant regarding Road & Nullah diversions.
Quantity calculation for all type of Structures on this Project.
Preparation of Monthly Payment Certificate and Final billing of the Project.
Cost Analysis and Variation Order Preparation.
Employer: - Ghazi Brotha Contractors (IMPREGILOSPA (Leader), ED
ZUBLINAG, CAMPENON BERNARD SGE, NAZIR & CO.
Period: - January 1997 to December 1998
Position Held: - High Grade Civil Engineer
Project: - Ghazi Brotha Hydropower Project
Page 7 of 10
JAVED ASAD
Project Introduction: -This project includes 50 Km R.C.C lined canal along with Carpeted
Roads on both sides of Canal, Road Bridges (18-Nos) having spread
Abutment &Pier Foundations and Pre Cast Post Tensioned Girders
along with approach roads, Main G.T Road Bridge, Canal Culvert (1-
Nos), Super passages to carry flood water over the Canal along with
Bridge Barrels (27-Nos) made of Per cast Post Tensioned channel
sectioned Flumes. Inlet & Fall Structures, One Rail Way Bridge on
main line.
The Engineering Services were rendered by HARZA Engineering
Company International LP (USA), National Engineering Services
Pakistan (Pvt) Ltd. Associated Consulting Engineering ACE (Pvt) Ltd.
Binnie & Partner (Overseas) Ltd.
Responsibilities: -
Review of Shop Drawings for structures like Road Bridges, Culvert, Super passages,
Inlet/Fall Structures and Escape Regulators
Correspondence with Consultant regarding technical issues.
Designing and Supervision of temporary structures, Contractor’s Colony, Hospital
Building and Infra structure.
Two site visits in a week to check Structure steel arrangement, shuttering arrangement
etc before submitting check request to Consultants.
Submission of proposals to Consultant regarding Road & Nullah diversions
Employer: - Punjab Irrigation Deptt,
Harza, Sogreah & National Development Consultants.
Period: - July 1995 To November 1996
Position Held: - Assistant Executive Engineer (Civil) /Junior Engineer.
Project: - Chashma Right Bank Irrigation and Road Project.
Responsibilities: -
Computer oriented Planning and Designing of concrete lined main canal, Distributaries,
Minors, Escape Channels, and Open Collector Drains of CRBC Project at D.I.Khan.
Site Supervision on the Construction of Hydraulic Structures like Super passage,
Causeways and Head Regulator of distributaries.
Supervision and Quality Control of Concrete lining of main canal (CRBC)
Page 8 of 10
JAVED ASAD
Employer: - Government of the Punjab High Way Department
Period: - January 1995 To June 1995
Position Held: - Assistant Engineer
Project: - Extension of Bye Pass Carriage Way from Raiwind to Changa
Manga Road Highway Project.
Responsibilities: -
Supervision of Bye Pass Carriage Way from Raiwind to Changa Manga Road.
Supervision of Highway Structures like Culverts and Road Bridges.
Quality Control of different materials used.
Performed one month Practical Training Course for Quality Control tests of road
construction from Punjab Highway Department.
Quantity estimation and Consumption Schedules for different materials.
Supervised and conducted all types of physical Tests for Concrete Mix Design and
Asphalt.
Employer: - SKB Engineers & Contractors, Lahore
Period: - August 1994 To January 1995
Position Held: - Site Engineer/Trainee Engineer
Project: - Dual Carriage Way from SADIQABAD - OBARO (60km Long
Highway Project of National High Ways Authority Pakistan)
Responsibilities: -
Supervision of Highway Construction Project including Field & Laboratory tests.
Supervision of Road Bridges and Culvert at Site.
Estimation of materials and supervision of all activities from Sub-grade to Carpeting of
Road.
ACHIEVEMENTS
Qualified Civil Engineer with a very high profile.
Performed various jobs as Senior Structure Engineer.
Maintained the Standard of Quality appreciable by the Clients and Consultants.
Co-ordination with Project team during Construction.
Well Experienced in the field of Hydraulic Structures Construction.
Proven planning and organizing skills.
Page 9 of 10
JAVED ASAD
Excellent record of working safely.
Always achieved the preset goals and targets.
QUALITIES
Ambitious, self-motivated seasoned and goal oriented person.
Capable of working within a very stressful and disciplined environment.
Fully committed to achieve success via considerable team effort.
Possess friendly, informative and professional attitude.
Have a clear speaking voice and well aware of communication skills.
Conversant with latest standards and techniques.
Familiar with work permits, management and job planning.
OBJECTIVES
Willing to take up an attractive job commensurating to my abilities.
Looking for such technical job which keeps me progressing further.
Seeking a responsible and better job to bring me more forward.
Anxious to meet any new challenge in the forthcoming jobs.
Wish to obtain any post offering a challenging career opportunity.
Page 10 of 10