cv wrmaxwell
TRANSCRIPT
-
8/14/2019 CV WRMaxwell
1/3
Mobile 0044 (0) 7865998053Communications Engineering /Electrical assistant
PERSONAL INFORMATION (Telecommunications Engineer)
Name: William Raymond MaxwellAge: 48
Nationality: British,Address: 48 Borestone Avenue , Kilbirnie , Scotland, KA25 7EX.
23+ Years Communications Engineering.Full clean current driving licence.Alternate Language: German.
PROFILE
I have 23 + Years Experience in telecom technologies. I also have excellent e
PROJECT EXPERIENCE
July 2005 - Present
Electrical/ Communications installer/Tester assistant at various new builds within the UK
10th October 05- June 2005
Supervisor / Manager/ MW & Antenna Rigger for the MFO South Camp in Sharm el Shekh EgyptThis included all Voice and Data networks ,VSAT,Mitel SwitchEquip,VOIP, Wireless Bridge installation ,Mini Links and dishes from 2-38GHZ
7th July 2003 10th October 2005
Maintenance Electrical Telecommunications TechnicianWithin the confines of the British Army training Areas including RHQ,s .This position entailed Data network design and implementation also included all rigging
16/Feb/01 14/Jan/2003
Interoute Senior Supervisor toInstall Fibre Cable around Germany .Area of concern was from Hanover -Hamburg Helmstedt - This included allSplicing and testing activities
to specific standards. (ISO 9001 & 9002 )
June 00 Feb 01
I-21 - Area Supervisor ( Germany ).To oversee the day to day constructionActivities. Interface and coordinate with prime contractor countrysupervisors. Resolve minor Conflicts locally according to overall projectapproach. Report in real time, Enforce installation specifications, ISO9001-9002.
Execute acceptance testing. Forecast any critical path issues and other possible
delays. This position also included installation of cables & commissioning atvarious POP, ILA locations this included rigging activitirs.
-
8/14/2019 CV WRMaxwell
2/3
June 99 - Jan 00
Colt FOC Network Testing - InnerLondon .July 1998 June 99
ITEA, Saudi ArabiaOSP/MW Links Engineer my duties includedThe day-to-day construction of a newTelecom infrastructure within SaudiArabia .
June 1997 July 98
Lucent Technologies, Saudi Arabia Senior OSP/MW Supervisor for LucentTechnologies on the Saudi Arabian TEP 6 project. Assigned to LucentTechnologies formally known as (AT&T) as a technician on the TEP 6/ GSM
Project. The TEP 6 project was to install Fibre Rings around the Kingdom ofSaudi Arabia also to install GSM & MW Links and upgrade the telephone infrastructurewithin Saudi Arabia .May 1996 - June 1997
GSM/MW Inspector with Vodafone Site Inspection Dept
Responsibilities were mainly within the UK and duties included - Verify new GSMinstallations were correctly installed with proper materials and within thecorrect construction parameters. The buffer between Vodafone and sub-contractorsand ensuring a general standard is achieved throughout all installations and anyfaults are recorded and rectified. Speaking to departments within Vodafone to
ensure no problems found are detrimental to all installation and new methodsI.e. Testing, aligning etc are disclosed with relevant department and gettingnew procedures working in practice.
April 1994 May 1996
Snr Spec. Tel. Equipment Technician with Saudi AramcoOSP/MW switch installation unit.Review drawings; supervise new and remedialmodification work on fibre copper networks.This position would also includeteaching Saudi Aramco Trainees .
Jan 1994 April 1994
Orange Communications - Hutchison - Microwave Rigger for all sites including BBC Towers.Aug 1993 Jan 1994
British Telecom FOC / Copper Splicer Tester
June 1993 Aug 1993
BICC Scottish Nuclear
Communications /Switch /Installer/ Tester/Rigger
-
8/14/2019 CV WRMaxwell
3/3
Aug 1992 June 1993
UA Communications
Telecom Cable Engineer/ Antenna Rigger.
Feb 1992 Aug 1992 BICC:
Scottish NuclearTelecom Cable /Switch/Installer/ Tester
Oct 1980 Feb 1992
Royal Corps of Signals (Army) TelecommunicationsEng.Duties: Worked in liaison with Army, Navy, RAF, British Telecom, Plesseyalso with other companies i.e. Deutch Bundespost, Cyprus Telecom, C&W, andTelecom N. Ireland also qualified as Antenna Rigger in 1986.
Aug 1976Oct 1980
Local light engineering firm as an apprentice Mechanical Fitter.Professional Courses Attended
Exchange wiring MDF- IDF, ODF, DDF and Servers; Fibre Optics Course forSplicing, Installation and Testing MM/SM/DWDM; Internal telephone panasonic,3com and computer systems U.G Jointing up to 2700 Pr Internal Wiring-UTP cables(CAT5/6)RF Surveys Microwave, Cross Polar Directional/ Sector AntennaVHF,UHF & HF radio systems. Aerial Riggers Course North American Comms Standardtrained. CSCS - Registration No 02075590 (Comms Installer Team Leader IndustryAccreditation "B").Computer trained and certificated inWord; Excel and Win fax First Aid Trained: Cert no EFA 008/04 .In accordance
with first aid at work Regs. (SI 1981/917) approval 679/87AWARDS
GSM NI, GSM-GULF, NI Honours List 1990.(Mention in Dispatches).GOC, s Commendation.