RESUME

PROFILE

NAME: ISMAILFAMILY NAME: MOHD TAHIRMARITAL STATUS: :MARRIEDNATIONALITY MALAYSIAD.O.B:08 APRIL 1941TELEPHONE (H.P):+60111-6333910

RELIGION ISLAM HEALTH:EXCELENT

EDUCATION:ASSOCIATE in APPLIED SCIENCE (MARINE TECHNOLOGY).COLLAGE /:SEATTLE, USAUNIVERSITYYEARS:1978 1982EMPLOYERS:PETRONAS (MALAYSIAN NATIONAL & GAS COMPANY) PETRONAS STAFF NO -185381982 1992. JOIND AY ENGINEERING 1992 1996

NOTIFICATION OF EMPLOYMENT ONE (20) DAYSPreferable area Middle-EastPROFESSIONAL COURSE / CERTIFICATE OBTAIN

MEMBER of AWS5 NOVEMBER 1985 - WELDING INSPECTION & QUALITY CONTROL 4 / 10 / 1985( American Society Of Metal )

NDT:NON DESTRUCTIVE TESTING ASNT LEVEL 11. - 8 FABUARY 1985

SSPC.SWIDISH STANDARD for PAINTING COATING & COATING INSPECTION JANUARY 1983( STEEL PROTECTION BUREAU - AMERICA) AREA OF CONCERNFABRICATION / CONSTRUCTION of OIL & GAS INDUSTRIES QUALITY CONTROL / INSPECTIONSeptember 2014 PRESENTINSPECTION OF VESSELS AND ITS RELETED FESILITIES. INSTALLATION OF RISER GUARDS, CONDUCTOR AND PILES.

September 2010- :BKT FRASER THERMAL TECHNOLOGY SDN BHD. POSITION:CONSTRUCTION MANAGERFABRICATION PRESSURE VESSELS, HEAT EXCHANGERS, AIR COOLED HEAT EXCHANGERS, BOILERS, FIRED HEAT EXCHANGERS AND DOUBLE PIPE & HAIRPIN HEAT EXCHANGERS.

RESPONSIBILITIES :TO APPROVE FABRICATION PROCEDURES AS PER CLIENTS SCOPE OF WORKS.INVOLVED IN KICK-OF-MEETING WITH PETRONAS REFINERY, MELACCA, PETROBRAS BRAZIL, ONGC, MOPUSTOR YME FIELD REDEVOLOPMENT PROJECT.May 2007 :RAMUNIA FABRICATORS SDN. BHD.POSITION:CONSTRUCTION MANAGERPROJECT :BELUMUT A NEW FIELD

NOV 1992 1997: AY FABRICATOR SDN. BHDPOSITION:GENERAL MANAGER (FABRICATION)PROJECT INVOLVED : TEBENGO JACKET, PILES & CONDUCTOSELIGI JACKETS, PILES & CONDUCTORGUNTONG D JACKET & JACKET CAP, PILES & CONDUCTOR RESPONSIBILITIES MAKE MONITORING PROGRESS AND PERFORMANCE OF DONE TO IMPLEMENT SAFETY RULES AND REGULATION AT WORK SITE INCLUDING HOUSE-KEEPING MONITORING MATERIAL RECEIVING AND STORAGE AREASCHEDULES OF WORKEQUIPMENT AND MANPOWER LOADING AND PLANNING.REVIEW FABRICATION AND ERRECTIION SEQUENCE'

.MONITOR LIFTING AND WEIGHING OF JACKET AND TOPSIDE

TO REVIEW PROJECT PROGRESS AND WORKSCOOPING OF SUB C ONTRACTOR.. .ANALYSE PROJECT PROBLEM.. IDENTIFY RECEIVING AND STORAGE AREA SCHEDULES OF WORK EQUIPMENT AND MANPOWER LOADING. SUPERVISE PROJECT TEAM ON FABRICATION, ERECTION AND INSTALLATION WORKS.TO REVIEW ANY CATCH UP PLAN IN VIEW OF DELAYS TO SCHEDULE

JAN 1992 - APRIL 1992: TENDER COMITEE FOR BAP-AA ROJECT DURING THE BIDDING PHASE. PROJECT INVOLVED: BAP-AA PROJECT. TO LEAD A GROUP OF ENGINEERS DURING THE TENDER EVALUATION OF THE PROJECT. MAKE RECOMMENDATION TO TENDER COMMITTEE FOR AWARD.JAN 1991 - DEC 1992:PETRONAS CARIGALI SDN BHDPOSITION:SENIOR FABRICATION ENGINEERPROJECT INVOLVEDFABRICATION OF BARAM B & Q PROJECT AT AYE YARD PASIR GUDANGOCT 1990 - DEC 1990: PETRONAS CARIGALI SDN BH POSITION:CONSTRUCTION LIAISON ENGINEERPROJECT INVOLVED:ATTACHED TO CARIGALI / SHELL FOR BDO(BARAM DELTA OPERATION) FOR THE REINSTATEMENT OF MCOT (MIRI CRUDE OIL TERMINAL (STORAGE TANKS )FEB 1990 - SEPT 1990: PETRONAS CARIGALI SDN BHD POSITION:DNV COORDINATOR FOR DEPARTMENTJOBS INVOLVED:TO LIASE WITH SAFETY AND TECHNICAL GROUP (CARIGALI) AND DULANG PROJECT TEAM. TO CONDUCT INSPECTION TECHNICAL AUDIT ON ALL THE FABRICATION YARD.

MAR 1989 - JAN 1990:PETRONAS CARIGALI REP.PROJECT INVOLVED:MEMBER OF DULANG PROJECT TEAM AT MALAYSIA SHIPYARD & ENGINEERING, PASIR GUDANG, JOHOR. TO MONITOR FABRICATION ACTIVITIES. TO ADVISE THE RESIDENT ENGINEER WITH REGARD TO QUALITY CONTROL / ASSURANCE MATTERS / HSH

FEB 1986 - JUNE 1988: SIME SMBAWANG ENGINEERING PASIR GUDANG :HEAD OF QA/QC DEPARTMENT.PROJECT INVOLVED:ESSO PRODUCTION MALAYSIA INC.GUNTONG B & GUNTONG CSELIGI B & CPALAS A

JOB INCLUDE OF SETTING UP WELDING DEPARTMET AUG 1986 - DEC 1986: PETRONAS CARIGALI REP.PROJECT INVOLVED:ONBOARD MV DIPLOMA TFOR SUBSEA INSPECTION OF DUYUNG COMPLEX AND ITS RELATED FACILITIES INCLUDING PIPELINE SURVEY FROM

DUYUNG COMPLEX TO ONSHORE, KERTEH - 170 KM LONG WITNESS UNDER WATER TESTING USING ROV SYSTEMMAY 1985 - FEB 1986: PETRONAS CARIGALI SDN BHDPOSITION:SENIOR CONSTUCTION ENGINEERPROJECT INVOLVED:CONSTRUCTION OF ONSHORE SLUGCATCHER AND ITS RELATED FACILITIES IN KERTEH. TO MONITOR INSPECTORS AND ENGINEERING DAILY ACTIVITIES. MAR 1985 - MAY 1985 :PETRONAS CARIGALI SDN BHD POSITION :SENIOR INSTALLATION SUPERVISORPROJECT INVOLVED:LAYING OF 170 KM BARGE SUBMARINE PIPELINE FROM DUYUNG COMPLEX TO ONSHORE KERTEH. MONITORING INSTALLERS ACTIVITIES.

JAN 1984 - MAR 1984: TO HOUSTON (USA) TO QUALIFIED WPQT (WELDING PROCEDURE QUALIFYING TEST) FOR BROWN & ROOT ON RESOURCES AND GUTTER AUTOMATIC WELDING MACHINE AND HYPERBARIC WELDING PROCEDURE FOR TYLOR DIVING IN NEW ORLEAN

1983 - LATE 1983: PETRONAS CARIGALI SDN BHD POSITION:ASST RESIDENT ENGINEER AT BREDERO PRICE COATING YARD - KUANTAN. PROJECT INVOLVED:COATING OF 170 KM PIPELINE FROM DUYUNG OFFSHORE COMPLEX TO ONSHORE SLUGCATCHER AT KERTEH. MAY 1981 OCT 1982:PETRONAS CARIGALI SDN. BHD.POSITION:ASST. RESIDENT ENGINEERPROJECT INVOLVED:FABRICATION OF 2 UNITS OF 4 LEGGED JACKET OF DUYUNG FIELDRESPONSIBLE FOR ALL THE FABRICATION ACTIVITIES.CONDUCT PROGRESS MEETING WITH THE Fabricator LIAISE WITH CARIGALI OFFICE IN KUALA LUMPUR WITH REGARD TO THE PROGRESS / STATUS.

RESPONSIBILITIESMANAGE PROJECT CONSTRUCTION, COMMISSIONING & PERFORMANCE TESTING AND START-UP PROJECT.TO ENSURE THAT ALL CONSTRUCTION ACTIVITIES ARE CONDUCTED INLINE TO SAFETY STANDARD

HOLDING WEEKLY CONSTRUCTION AND SAFETY MEETING WITH CONTRACTOR. MONITOR EQUIPMENT DELIVERY STATUSREVIEW CONTRACTOR CONSTRUCTION PROGRESS REPORTREVIEW CONSTRUCTION OF SCHEDULE CONTRACTOR CPM (CRITICAL PATH NETWORK)REVIEW WEEKLY & MONTHLY REPORT CONSTRUCTION STATUS.REVIEW VENDOR DRAWING.TO ENSURING VARIOUS PROJECT AS PER ENGINEERING STANDARD, DEFINE SCOPE OF WORK AND PERFORM COMMISSIONING