cven3501 assignment sheet (generic)

2
Assignment Name and Student ID Transmissivity Location Q(m 3 /day) Question 1: No-flow boundary conditions are implemented by: Question 2: Flow Calculation with no abstraction or recharge Condition 1 flow is m 3 /day Condition 2 flow is m 3 /day Question 3: Recharge or abstraction at a node is calculated by: Question 4: Water Level and Flows for Condition 1 are: Water level at pumping/recharge node (...,... ) is m above datum Flow accross boundary AB m 3 /day Flow accross boundary BC m 3 /day Flow accross boundary CD m 3 /day Flow accross boundary DA m 3 /day Question 5: Water Level and Flows for Condition 2 are: Water level at pumping/recharge node (...,... ) is m above datum Flow accross boundary AB m 3 /day Flow accross boundary BC m 3 /day Flow accross boundary CD m 3 /day Flow accross boundary DA m 3 /day Declaration: The work presented above is all my own work signed: 3501 - Water Resources Engineering

Upload: jnrules123

Post on 08-Nov-2015

222 views

Category:

Documents


4 download

DESCRIPTION

CVEN3501 Assignment Sheet (Generic)

TRANSCRIPT

  • Assignment

    Name and Student ID Transmissivity Location Q (m3/day)

    Question 1: No-flow boundary conditions are implemented by:

    Question 2: Flow Calculation with no abstraction or recharge

    Condition 1 flow is m3/day Condition 2 flow is m3/day

    Question 3: Recharge or abstraction at a node is calculated by:

    Question 4: Water Level and Flows for Condition 1 are:

    Water level at pumping/recharge node (. . . , . . .) is m above datum

    Flow accross boundary AB m3/day Flow accross boundary BC m3/day

    Flow accross boundary CD m3/day Flow accross boundary DA m3/day

    Question 5: Water Level and Flows for Condition 2 are:

    Water level at pumping/recharge node (. . . , . . .) is m above datum

    Flow accross boundary AB m3/day Flow accross boundary BC m3/day

    Flow accross boundary CD m3/day Flow accross boundary DA m3/day

    Declaration:The work presented above is all my own work signed:

    3501 - Water Resources Engineering

    hamidTypewritten Text(m/day)

    hamidTypewritten Text

    hamidTypewritten Text

    hamidTypewritten Text

    hamidTypewritten Text

    hamidTypewritten Text

    hamidTypewritten Text

    hamidTypewritten Text2

  • Assignment

    Figure 3.34: Layout of nodes for the assignment

    3501 - Water Resources Engineering