cv_mm_sap consultant
TRANSCRIPT
8/11/2019 CV_MM_SAP Consultant
http://slidepdf.com/reader/full/cvmmsap-consultant 1/3
C V of Parthiban
Page 1 of 3
Parthiban Madhavadev
FOL, Block I Lift 3 Phone: 04226520592Jain Apartments, Mobile: 09486950258 Avinashi Road,Peelamedu,Coimbatore 641 004
Summary
Parthiban is an Engineering/IT professional with a Masters Degree in Engineering and having 7Years of cross-functional experience in SAP/Manufacturing/Automobile industries. Experiencedwith Product management, studying legacy data and creating requirements for conversion intoSAP, Designing requirements for data elements and custom tables wherever necessary, Datamapping, creating Specifications for custom programs, detailed unit and volume test plans, testingthe programs, training the users.
Parthiban has got more than 12 years of experience with Machine Tool and Automobileengineering industries in Design, Quality Control and performed as a Lead Assessor for ISO 9000and in preparation of Quality System Procedures and other relative documents and also having avery good knowledge in Inspection and Metrology Lab activities.
Education
Course Year Marks Obtained University
Master of Engineering – Production
1996 - 98 86% Bharthiyar University, India
Post Graduate Diploma inManagement 1997 - 98 76%
Indira Gandhi National OpenUniversity
Post Graduate Diploma inOperations Management
1996 – 9776%
Indira Gandhi National OpenUniversity
Degree In Mechanical Engineering 1991 - 95 84% Bharthiyar University, India
Diploma in Mech Engineering 1984 – 87 82% PSG Polytechnic, India
SSLC 1983 70% Nanjappa Hr Sec School
Professional Experience
PSG College of Technology, India [Jan 2011 onwards]
Working as Asst Professor in Mechanical Engineering Department handling classes for PG and PG Diploma Students
Avighna Tech, India (Jul 2008-Dec 2010)
Worked as a Sr SAP MM Consultant from UK in giving support and resolving the issues for the clients and for thecompany needs
Project # 2:
Client : Kellogg brown and root
Role : Sr.SAP MM Consultant
Description:
KBR is a leading global engineering, construction and services company supporting the energy, hydrocarbon, governmentservices and civil infrastructure sectors. The company is a leader in many of the growing end-markets it serves,particularly gas monetization, having designed and constructed, alone or with joint venture partners, more than half of the
world's operating liquefied natural gas (LNG) production capacity over the past 30 years. KBR offers a wide range ofservices through its Upstream, Downstream, Technology, Services, Government and Infrastructure, and Venturesbusiness segments.
8/11/2019 CV_MM_SAP Consultant
http://slidepdf.com/reader/full/cvmmsap-consultant 2/3
C V of Parthiban
Page 2 of 3
Creation of Number Ranges for all the Material Management Documents
Configuration of Purchasing Documents, which includes Purchase Request (PR),
Request for Quotation (RFQ), Outline Agreement, Purchase Order (PO).
Configuration of Goods Movements, Enter Invoice and Physical Inventory verification
Configuration of Inventory Documents (GR, GI, TP).
Capacity Planning based on the requirement
Running the LTP and managing the exceptions
Communicate with the Customers and Production for smooth flow of requirementsProject # 1:
Client : Schneider National inc.
Role : SAP MM Consultant
Description:
Schneider National Inc. is a leading provider of transportation, logistics and related services. Schneider National servesmore than 80 percent of the Fortune 500
® companies, offering the broadest portfolio of services in the industry.Schneider
National's transportation solutions include: One-Way, Intermodal, Dedicated, Bulk, Transportation Management,Transloading Services, International Services and Schneider Payment Services. Schneider Logistics, a wholly ownedsubsidiary of Schneider National, provides supply chain management technology, managed services, engineering servicesand freight payment. With headquarters in Green Bay, Wis., Schneider National has a 70-year track record of providingexpert transportation and logistics solutions.
Contextworld, UK (From June 2006 to May 2008)
Involved in
Collection of Sales Watch data for Computers and Printers in Italy, Sweden and Swiss through data providers.
Analysing the data for Quality and cross checking for data perfection
Analysing the Sales data in respect to Configuration, Model, Price, Manufacture and Vendors.
Report Preparation with the data as required by the Customer and Clients
Checking the Material Master data for its quality and informing about the changes to be done.
Providing hands on support, doubt clarification and some mapping of Material Master records.Worked as a Systems Analyst in this Market Research company in Organising, Structuring and developing the
company’s database system from the Old Paradox System to the new Matchmaker database and into the SAP MMModule as a Prototype.Responsibilities include
Creating the datasets for Matchmaker and SAP MM Module
Configuring the SAP MM Module
Collection of Data and transforming to the SAP requirement
Data mapping and setting the migration procedure
Customizing the Business requirements in the SAP System
Mapping the Authorization Management
Studying the Reporting requirements and implementing the same in SAP
Pricol (Automobile Ancillary Manufacturing industry), India (Jan 2003 - May 2006)
Worked as the Module Leader for PP & MM Modules for implementation of SAP R/3 at Plant I, III & IV consists ofMM, PP, QM, PM, SD and CO modules.
Responsibilities include
Documentation of existing Business process as per ASAP methodology and mapping the same onto SAP tomeet the requirements of the end users.
Collection of all the MM & PP related Master data such as Material Master, Bill of Materials, Routings, PurchaseOrders, etc. from the legacy system and mapped the same for SAP requirement.
Creation of new Plants & storage locations.
Creating new release strategies for purchase orders
Led As Is To Be functions in the upgrade from Legacy to SAP 4.6 for PP module.
Configured Planning Time Fence project.
Gathered system requirements for MRP/Planning to utilize Planning Time fence to more closely adhere toProduction Schedules.
Designed Security Profile Upgrades for MRP Users.
Involved in providing the SAP SD,MM & PP Solution support
Uploading of all master data through a BDC program by co-coordinating the ABAP/4 programmers and verified
the data for further transactional issues. Implementing the Engineering Change management and Batch management to meet the requirements as per
the Legacy system.
8/11/2019 CV_MM_SAP Consultant
http://slidepdf.com/reader/full/cvmmsap-consultant 3/3
C V of Parthiban
Page 3 of 3
Integration
PP-MM and PP-CO and PP-PM integration testing were conducted
Analysed the results of MRP for proper creation of Vendor schedules using Quota arrangement
Mapped Detailed Capacity Planning as per Client’s requirements
Used Repetitive manufacturing scenario with automatic cost collectors for all factory made assemblies andFinished Products for proper monitoring of costs
All the Good Movement were configured in such a way that the physical stocks reflect all transactions resulting ina change in stock and thus in updated inventory level.
By integrating the Physical Inventory method, the System has been configured to support for the adjustmentsbetween the physical stocks and book stocks.
Explore the processes of sales & distribution in SAP & correlate with the company’s process.
Prepared the Blueprint documents for the project & sign off from the respective functional heads.
Lakshmi Machine Works Ltd. (Machine Tools Industry), India ( Mar 1988 – Dec 2002)
Worked as Quality Assurance Engineer / Co-ordinated as a Core Team Member for ISO 9000 and SAP – PP & MMModule
Responsibilities – as a core team member
Collection and refinement of all Master Data such as Material Master, BOM, Work center, Routing, etcpertaining to PP & MM Module for an efficient BDC run.
Data refinement of Master Data in view with the MRP Run.
Creation of Purchase Info Record and Source List.
Data refinement on the output of LTP Run against exceptions.
Running the MRP and take actions based on the results.
Training the end users.
Special Training
Attended the training for the Design and Manufacturing activities of CNC Machine Tool building at M/s MIKRON AGNIDAU, Switzerland.
Project Management Methodologies & Tools used
SAP ‘ASAP’ Project Management for SAP Implementation
MS Project, Excel, Word, Power Point, Lotus Notes, AmiPro, PageMaker, ABC Flowchart
Work Experience In The Projects
Strategic Requirements Evaluation : As an in-charge of strategic requirement study of our industry in SAPimplementation, the existing business process of the company was studied and on the basis of the same, an "As Is"document was prepared for the implementation.
Conceptual Design: Keeping in the "As Is" study and in view with the strategic requirements a "To be" documentwas developed to bring out the complete functionality of SAP
Basic configuration and prototyping: Sole in-charge for customizing the process Management, Master Data,Process orders etc., and as a team leader verified and co-coordinated for customizing the QM, MM and PM modules.
Customization of Process Management includes business scenario confirmation as per the “To Be” documentationand testing of the same in the Test client before transportation into the Production client.
Overview of Production planning: Demand management, Master data, Capacity requirements planning, MRP,Work centers, Routings, Production orders, Production information system, Bill of Materials.
Final Integration Testing after up-loading the Data
Training the end users with OHP Slides, MS – Power Point, Screen Cam and hands on training in SAP.