cwds regional presentation · august 2019 september 2019 october 2019 november 2019 cares 2.5.1...

31
CWDS / Child Welfare Digital Services CWDS Regional Presentation CWDS Customer Relations / November 2019

Upload: others

Post on 28-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWDS / Child Welfare Digital Services

CWDS Regional Presentation

CWDS Customer Relations / November 2019

Page 2: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS and CWS-CARES Timeline

CWS/CMS 8.7

20

CWS/CMS 8.8

19

August 2019 September 2019 October 2019 November 2019

CARES 2.5.1(Facility

Complaints)

16

CARES 2.6

7

CWDS / 2

CARES 2.7

16

Page 3: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Goes to Core County Reps

working with DS Team

First Available

to Core Team

Extended to

Core Counties

Available

Statewide

Intake Core Constituent

Representatives

Intake Core Constituents

All Remaining

Organizations

over 4 Waves

Phase

1Phase

2

Phase

4

DONE

DONE

CWDS / 3

DONE

Phase

3Remaining Core

Constituents

DONESept 934 CARES users

380 users(179 new)

414 total users

1063 users(42 new)

1477 total users

4675 users(2259 new)

6152 total users

Sept 16

Sept 30

Oct 7 to

Oct 28

CARES 2.6 Snapshot Statewide Rollout

As of 10/28/2019Note: The user counts reflect the numbers provided to us by the Orgs and given to the Developers. They do not represent users that, for example, were unable to be loaded and moved to a different wave nor those that we are still reconciling.

Wave 1

738 users(326 new)

Oct 7

Wave 2

1444 users(306 new)

Oct 14

Wave 3

1273 users(464 new)

Oct 21

Wave 4

1220 users(1163 new)

Oct 28

Page 4: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWDS / 4

IMP

Activities

Aug September October November

9/2-

9/8

9/9-

9/15

9/16-

9/22

9/23-

9/29

9/30-

10/6

10/7-

10/13

10/14-

10/20

10/21-

10/27

10/28-

11/3

11/4-

11/10

11/11-

11/17

11/18-

11/24

User

Provisioning

Implementation

Prep

Phase Go-Live9/16

Gather Snapshot user data for each phase and wave

IMPLEMENTATION TEAM TASKSOrg Go-live date

9/9 9/30

Prepare

for

OCM

Finalize Job Aid

Prepare & Finalize Training Video

JOINT TASKS (ORG & IMPLEMENTATION

TEAM)

Prepare for Training Window

sessions (TTT)

10/7, 10/14, 10/21, 10/28

Training date

10/3 10/10 10/15

Page 5: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Snapshot TTT Training

Train-the-Trainer (TTT) Training Sessions all have been completed:

➢ 33 counties in attendance➢ Approximately 80 attendees

➢ WBT coming soon:➢ Finalizing stage, incorporating changes/updates and

submitting for final reviews

CWDS / 5

Page 6: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWDS / 6

Page 7: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Learning on DemandCWS-CARES users have a variety of ways to learn about CARES.

Training materials are located on the CARES Implementation Portal.

Getting Started

Getting Started with CARES video equips you with the basics you need to know to begin using the new system

CANS: Search & View Client InformationAdd, Edit & Delete AssessmentsReassessments

Facility Search and Profile

Secure Login

Manage Users

Intake Search Tips (desk aid)

Snapshot

Job Aids / Desk Aids

Demo Videos

CANS: Search & View Client InformationAdd, Edit & Delete AssessmentsReassessments

Facility Search and Profile

Secure Login

Manage Users

Snapshot

Web-based Training

Facility Search and Profile

CANS

CWDS / 7

Page 8: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

- CWDS is offering bulk loading

- CANS, Facility Search, and/or

Snapshot

- Orgs to provide list of users and

permission(s) wanted

CWDS / 8

CARES-Live Bulk Loading

Page 9: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWDS / 9

Wave &

Go-Live DateOrganization

Wave 1

Monday,

11/18/2019

• Colusa

• El Dorado

• Inyo

• Mariposa

• Napa

• San Bernardino

• Sierra

• Siskiyou

• Solano

• Sonoma

• Trinity

• Tulare

• Yuba

• Los Angeles

• Butte

• Fresno

• Orange

Wave 2

Monday,

11/25/2019

• Alameda

• Alpine

• Amador

• Calaveras

• Del Norte

• Glenn

• Imperial

• Kern

• Kings

• Madera

• Marin

• Modoc

• Monterey

• Nevada

• Placer

• Plumas

• San Mateo

• Santa Cruz

• Stanislaus

• Sutter

• Ventura

• Yolo

• Merced

• Sacramento

Wave 3

Tuesday,

12/03/2019

• Contra Costa

• Humboldt

• Lake

• Lassen

• Mendocino

• Mono

• Riverside

• San Benito

• Santa Barbara

• Santa Clara

• San Diego

• San Luis Obispo

• Tehama

• Tuolumne

• CDSS (AD, CCLD, CFSD)

• San Francisco

• San Joaquin

• Shasta

CARES-Live Bulk Loading Schedule

Page 10: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES-Live User Survey

CWDS / 10

➢ Survey is intended collect responses from all users so we can get feedback on CARES-Live features

➢ Quick and simple survey with multi-choice questions and one open ended question

Page 11: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES-Live Training Environment

CWDS / 11

CARES-Live Training Environment is coming soon:➢ Training environment to support the use of CARES-Live features statewide

➢ Provides a dedicated environment to train CARES-Live users➢ No longer have to use Staging or Production Environment to access CARES-Live features

➢ CWDS will perform data validation in the environment to verify all possible test scenarios are covered

Page 12: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Implementation Resources / Contact Info

• CARES Implementation Mailboxes

• General Mailbox [email protected]

• Training Mailbox [email protected]

• Sonoltra Sanchez (Implementation Manager)

[email protected]

• Christina Yull (State Implementation Lead)

[email protected]

• Darlessia Worthen (State Training Lead)

[email protected]

CWDS / 12

Page 13: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES-Live County Admin RemindersRegistration

Page 14: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES-Live County Admin Reminders

Unregistered Users

• County and Office Admins can review the Unregistered Users on the Admin module, Manage Users screen

Page 15: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES-Live County Admin Reminders

Disabling CARES users when offboarding staff

• Counties should include CARES users in their offboarding processes

• County Admins can deactivate users via CARES User Admin

Page 16: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES-Live Service Desk

ServiceNow Reminder:

Emails sent from ServiceNow have the wrong return email address. When responding to these emails counties should add [email protected]

• We are performing ServiceNow maintenance and will fix the email issue once this work is complete

• Counties will be informed when this is resolved

Page 17: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CARES Update

• Project Outreach – Travel planned for Fall 2019• August 22 – Central CHILDRENS

• September 19 – Southern RUG

• September 26 – Southern CHILDRENS

• October 25 – Central RUG

• November 5 – CDSS

• November 7 – Bay Area RUG

• November 20 – Mountain RUG

• December 3 – Northern RUG

• CARES-Live vs. CARES

• Contact [email protected] to request a demo!

Topics will be covered:• CARES-Live Updates

• Enterprise Architecture

• Service Delivery Lifecycle

• Blueprint Access

• Website Updates

CWDS / 17

Page 18: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS-CARES Development Approach

Architecture

• Utilize a CRM based PaaS for the core CARES application and a vendor managed Cloud Infrastructure

• Establish a CARES Data Infrastructure (CDI) – where CARES data and business rules will be managed to

facilitate a repeatable process of conversion and to assist with longitudinal data analysis and with data

exchange

Development

• Maintain Agile development with user centered design with more focus on the Service Delivery Lifecycle

which will flow from the CARES Product Blueprint

Delivery

• Procure Integration Services to assist with configuration and development in a CRM based PaaS

• Establish a Sandbox Environment that puts new capabilities into the hands of users as a means to obtain

user feedback and improve those capabilities iteratively

CWDS / 18

Page 19: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Project Status – Current Focus

Current Project Focus – Transition to the New Approach

• Determine which Customer Relationship Management (CRM) based Platform as a Services

(PaaS) is best for CARES - Salesforce or Microsoft Dynamics

• Procure the selected PaaS and System Integration Services

• Establish a CARES Data Infrastructure (CDI)

• Establish a Sandbox Environment

• Conduct discovery for first Testable Increment (Screening)

• Increase user adoption of CARES features in production

CWDS / 19

Page 21: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS Release 8.8

OVERVIEW:

This release includes updating Proof of

Service Documents, improving SCP Search,

and cleaning up duplicate Service Provider

Addresses.

UPCOMING MILESTONES:

COMPLETED MILESTONES:

• Signed Statement of Work (May 2019)

• Approved Project Management Plan and

Project Schedule

• Joint Application Design (JAD) (August 8,

2019)

• County Test Workshop (CTW) (September

2019)

• Go-Live (October 19, 2019)

CUSTOMER INPUT/EXPECTATIONS:

• Review Release-related materials on the

CWS/CMS website

GO LIVE DATE:

October 19, 2019

CURRENT ITERATION:

Implementation

PROJECT MANAGER:

Colin Kelley

APPLICATION SUPPORT MANAGER:

Yee Luk

COMMUNICATIONS LEAD:

Asia Lennear

(916) 891-3105

[email protected]

Page 22: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS Release 8.8.0

OVERVIEW:

This interim release is currently scheduled to

implement three (3) SCRs, twelve (12) PTS

tickets and three (3) DPU tickets.

UPCOMING MILESTONES:

COMPLETED MILESTONES:

• Signed Statement of Work (May 2019)

• Approved Project Management Plan and

Project Schedule

• Joint Application Design (JAD) (August 8,

2019)

• County Test Workshop (CTW) (September

2019)

• Go-Live (October 19, 2019)

CUSTOMER INPUT/EXPECTATIONS:

• Review Release-related materials on the

CWS/CMS website

GO LIVE DATE:

October 19, 2019

CURRENT ITERATION:

Implementation

PROJECT MANAGER:

Kim Carpenter

APPLICATION SUPPORT MANAGER:

Yee Luk

COMMUNICATIONS LEAD:

Asia Lennear

(916) 891-3105

[email protected]

Page 23: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS Release 8.9

OVERVIEW:

Identify Clients who Run Away before Placement, Expand

Length of Court Case Number Fields, and Improve Provider

Search.

UPCOMING MILESTONES:

• Go-Live – January 25, 2020

• County Test Workshop (CTW)

• Fresno County - December 4 & 5, 2019

• Sacramento County - December 11 & 12, 2019

• Orange County - December 11 & 12, 2019

COMPLETED MILESTONES:

• Subject Matter Expert (SME) Solicitation

• Business Needs Analysis (BNA) Meetings (May/June 2019)

• Draft Requirements (June 14, 2019)

• Scope finalized (July 2019)

• Work Order signed (September 3, 2019)

• Approved Project Management Plan and Project Schedule (October 2019)

• Joint Application Design (JAD) (November 7, 2019)

CUSTOMER INPUT/EXPECTATIONS:

• Respond to questions/issues related to SCRs

• Register for County Test Workshop

GO LIVE DATE:

January 25, 2020

CURRENT ITERATION:

Sprint 3

PROJECT MANAGER:

Gina Blakemore

APPLICATION SUPPORT MANAGER:

Yee Luk

COMMUNICATIONS LEAD:

Andrea Johnson-Kumar

(916) 891-3143

[email protected]

Page 24: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS Release 8.9.0

OVERVIEW:

This interim release is currently scheduled to

implement two (2) DPU and two (2) PTS tickets.

UPCOMING MILESTONES:

• Go-Live (January 25, 2020)

• County Test Workshop (CTW)

• Fresno County - December 4 & 5, 2019

• Sacramento County - December 11 & 12, 2019

• Orange County - December 11 & 12, 2019

COMPLETED MILESTONES:

• Signed Statement of Work (September 2019)

• Approved Project Management Plan and

Project Schedule (October 2019)

• Joint Application Design (JAD) (November 7,

2019)

CUSTOMER INPUT/EXPECTATIONS:

• Review Release-related materials on the

CWS/CMS website

GO LIVE DATE:

January 25, 2020

CURRENT ITERATION:

Sprint 3

PROJECT MANAGER:

Kim Carpenter

APPLICATION SUPPORT MANAGER:

Yee Luk

COMMUNICATIONS LEAD:

Andrea Johnson-Kumar

(916) 891-3143

[email protected]

Page 25: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS Proposed Release 8.10

CANDIDATE SCRs:

Tentatively Selected:

• 8800 Documentation of Plans of Safe Care Relating to CARA

• 8774 Diagnosed Conditions

• 8797 Resource Management/Placement Home/County Search –

Change Default County

UPCOMING MILESTONES:

• Work Order Approval (November 2019)

• Go-Live (Tentative April 2020)

COMPLETED MILESTONES:

• Business Needs Analysis Meetings (August

29, 2019)

• Requirements sent to IBM for sizing effort

(September 13, 2019)

• Final Requirements and Scope (October 18,

2019)

CUSTOMER INPUT/EXPECTATIONS:

• Respond to questions/issues related to SCRs

GO LIVE DATE:

April 2020 (Tentative)

CURRENT ITERATION:

Project Planning

PROJECT MANAGER:

Craig Woody

APPLICATION SUPPORT MANAGER:

Yee Luk

COMMUNICATIONS LEAD:

Harry Terrell

(916) 891-3136

[email protected]

Page 26: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWS/CMS Proposed Release 8.11PRIORITIZED SCRS:

• 8790 Documentation of Runaway and Non-Official Placements for Youth in Care

• 8779 Update LIS Interface to Include Additional Placement Facility Types

• 8796 RFA Caseload “Inbox” and RFA Assignment History8805

• 8801 Add Mandatory Fields to Document Rationale if a Child did not Participate in a Child and Family Team Meeting

• 8408 Add JV 221, JV 222, JV223

• 8791 Add “CWS Agency has Jurisdiction” Value to Non-Foster Care Placements within Non-CWD Foster Care (Probation) Cases

• 8808 Add Spanish Version of HEP

• 8280 Add Description Field to Special Projects Page of Placement Home Notebook

• 8794 Service Provider De-Duplication

• 8807 Add PCV13 and PPSV23 Vaccination

• 8776 SSN Violations – Cleansing

• 7629 Update Immigration Status Type Code Table

• 8769 Removal of Declaration Statement on Ex-Parte Application and Order Report templates

COMPLETED MILESTONES:

• SCRs Prioritized (November 2019)

UPCOMING MILESTONES:

• SME Solicitation will be from 11/15/19 –

11/29-19

CUSTOMER INPUT/EXPECTATIONS:

• Respond to questions/issues related to SCRs

GO LIVE DATE:

April 2020 (Tentative)

CURRENT ITERATION:

Project Planning

PROJECT MANAGER:

Kim Carpenter

APPLICATION SUPPORT MANAGER:

Yee Luk

COMMUNICATIONS LEAD:

Jaime Guzman

(916) 891-3144

[email protected]

Page 27: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Windows 10 Semi-Annual Channel (SAC)

• Next supported Platform: Windows 10 Enterprise v1809 SAC (64-bit) / Office 2016 Standard (32-bit).

• IBM to include v1809 SAC in R8.8 test phase for certification against the CMS.

• Image to be made available to dedicated counties in October 2019.

• Application support for v1607 LTSB to continue until R8.12 (10/17/2020).• End of application support means no further application testing during releases.

• Afterwards, IBM will continue patching LTSB for dedicated counties until those older workstations are refreshed.

• If an application issue is directly linked to LTSB then the solution would be to install the newer, CMS supported Windows release.

• IBM will test Windows 10 Ent SAC (2019 Fall Release) as part of R8.12 for replacement of v1809 (EOL 5/11/2021).

• R8.12 Go-Live is estimated to be 10/17/2020.• V1809 would be supported until EOL (5/11/2021).

• This would give counties approximately 6 months to apply the next release update.

• The license model required for Windows 10 Enterprise SAC requires Software Assurance.

• Any net new machine will require a new license.

• Note: There is an additional cost for Microsoft Software Assurance licensing. Cost is dependent on the vendor, length of time contracted, participation in an existing Enterprise Agreement, etc. Counties will need to consult their own procurement agencies or IT specialists.

Page 28: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

Business Intelligence

• Status updates and demos will now be provided through monthly BI

meetings. The next meeting TBD.

• Check the BI Portal for the latest information, including training

materials, known issues and workarounds, meeting agendas and

minutes, and systems maintenance and upgrades.

• Isabelle Moreaux is retiring from State service at the end of

December 2019.

CURRENT PHASE:

BI 4.2 – Ongoing Support and

Maintenance

PROJECT MANAGER/

TECHNICAL LEAD:

Isabelle Moreaux

(916) 891-3304

COMMUNICATIONS LEAD:

Sean Darr

(916) 891-3129

[email protected]

Page 29: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

• Autumn Workshops were completed in September/October. A summary fact sheet is on the

portal – link is on Data Quality portal front page

• Service Provider Semi-Annual Report now available. Counties must open and change flag to

proceed to allow batch merge to process

• SCR8752 Service Provider Address Merge. Signups and information have been sent out. Pilot

November 2, Weekly December 7

• SCR8653 Education Provider Merge. Signups and information have been sent out. Pilot

November 23, main group December 14

• SCR8650 Closed Adoption Cases. Quarterly run to occur November 16. Expected numbers are

on the portal – link is on Data Quality portal front page

CURRENT PHASE: PROJECT MANAGER/

TECHNICAL LEAD:

James Sidebotham

(916) 891-3308

COMMUNICATIONS LEAD:

Sean Darr

(916) 891-3129

[email protected]

Data Quality

Page 30: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CDSS Date Reminders

CWS DATA COMMITTEE:

To be included in these conference calls, send an e-mail request to:

[email protected]

• Next meeting date: November 19, 2019 (the following meeting is December 17, 2019)

• Time: 2:00PM – 3:00PM

• Conference Line: 877-873-8018

• Participant Code: 256472

• Webinar Registration Link: https://www2.gotomeeting.com/register/854294706

PATHWAYS TO MENTAL HEALTH SERVICES TECHNICAL ASSISTANCE FORUM:• Next meeting date: December 4, 2019

• Time: 10:00AM – 11:30AM

• Email: [email protected]

• Webinar Registration Link: https://bit.ly/2L3xglQ

Page 31: CWDS Regional Presentation · August 2019 September 2019 October 2019 November 2019 CARES 2.5.1 (Facility Complaints) 16 CARES 2.6 7 ... Prepare & Finalize Training Video JOINT TASKS

CWDS Date Reminders

PIAC Meeting:

December 4, 2019

• Held first Wednesday of each month (if needed)

TAC Meeting:

December 10, 2019

• Meets second Tuesday of each month.

• Time: 1:00PM – 3:00PM