cwind complete cable care - swan hunter · onboard the asv pioneer barge, for the cwind ‘complete...

2
www.swanhunter.com © SWAN HUNTER. Project Informaon Page 1 of 2. CLIENT I I VESSEL CWIND ASV PIONEER CWIND COMPLETE CABLE CARE Swan Hunter provided a full cable repair spread onboard the ASV Pioneer barge, for the CWind ‘Complete Cable Care’ service offering. Swan Hunter provided the new modular offshore carousel in the 15m, 2000Te variant, combined with loading tower, 10Te spooling tensioner, integrated cable highway, and a 15Te horizonal deck tensioner. HVDC/HVAC INTERCONNECTOR CABLES EXPORT ARRAY CABLES PROJECT OVERVIEW PRODUCT DETAILS 2000Te 15m OD Modular Basket Carousel Loading Tower c/w 10Te Spooling Tensioner 15Te Deck Tensioner Integrated Loading Arm & Cable Highway EQUIPMENT PROVIDED

Upload: others

Post on 08-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CWIND COMPLETE CABLE CARE - Swan Hunter · onboard the ASV Pioneer barge, for the CWind ‘Complete Cable Care’ service offering. Swan Hunter provided the new modular offshore

www.swanhunter.com

© SWAN HUNTER. Project Information Page 1 of 2.

CLIENT I

IVESSEL

CWIND

ASV PIONEER

CWIND COMPLETE CABLE CARE

Swan Hunter provided a full cable repair spread onboard the ASV Pioneer barge, for the CWind ‘Complete Cable Care’ service offering. Swan Hunter provided the new modular offshore carousel in the 15m, 2000Te variant, combined with loading tower, 10Te spooling tensioner, integrated cable highway, and a 15Te horizonal deck tensioner.

HVDC/HVAC INTERCONNECTOR CABLES

EXPORT

ARRAY CABLES

PROJECT OVERVIEW

PRODUCT DETAILS

2000Te 15m OD Modular Basket Carousel

Loading Tower c/w 10Te Spooling Tensioner

15Te Deck Tensioner

Integrated Loading Arm & Cable Highway

EQUIPMENT PROVIDED

Page 2: CWIND COMPLETE CABLE CARE - Swan Hunter · onboard the ASV Pioneer barge, for the CWind ‘Complete Cable Care’ service offering. Swan Hunter provided the new modular offshore

www.swanhunter.com

© SWAN HUNTER. Project Information Page 2 of 2.

SWAN HUNTER’S SCOPE OF WORK

Provision of 2000Te New Build Carousel, Loading Tower, 10Te Spooling Tensioner, and 15Te Deck Tensioner

Intermediate mobilisation of all equipment at Port of Rotterdam, NL

Final mobilisation and commissioning at Port of Blyth, UK

Equipment Operators and Maintenance Technicians

Mobilisation, Operational, and Engineering Support

DETAILED ANALYSIS

Several specific design features were utilised to allow for an efficient equipment mobilisation and commissioning period, and to suit the client’s deck layout:

Modular carousel offered initially in 15m, 2000Te configuration, however deck layout and seafastening design allows for extension to 18m 2500Te configuration.

Variable carousel inner hub diameter to suit range of cable MBRs.

Modular loading tower design allowed for simple integration with client’s elevated cable highway.

+44 (0) 191 295 0295 [email protected]