cwk-02

1
DATE NO REVISION DESCRIPTION DRAWN DESIGNED CHECKED APPROVED DRAWN: DESIGNED: CHECKED: APPROVED: DRAWING NO: SCALE: DATE: REVISION: CLIENT: PROJECT NAME: DRAWING TITLE: CONSULTANT: Copyright 2014, Renardet S.A. & Partners Consulting Engineers LLC. All rights Reserved Consultancy Services for Feasibility Study, Detailed Design and Construction Supervision of the Duqm Development Drainage Network and Protection Schemes Phase 1 PRILIMINARY DESIGN JURF DAM TYPICAL NON-OVERFLOW SECTION A _ALTERNATIVE-1 CH AMY AMY BH 1333-JURF-CWK-02 AS SHOWN @ A1 JULY 2014 0

Upload: astrid-aubry

Post on 18-Nov-2015

10 views

Category:

Documents


0 download

DESCRIPTION

DAM

TRANSCRIPT

  • DATENO

    REVISION DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

    DRAWN:

    DESIGNED:

    CHECKED:

    APPROVED:

    DRAWING NO:

    SCALE:

    DATE: REVISION:

    CLIENT:

    PROJECT NAME:

    DRAWING TITLE:

    CONSULTANT:

    Copyright 2014, Renardet S.A. & Partners Consulting Engineers LLC. All rights Reserved

    LAST SAVED BY ASTRID ON 26/08/2014 6:01 PM PLOTTED BY ASTRID ON 12/1/2014 5:14 PM LOCATION: W:\1333 DUQM DRAINAGE NETWORK AND PROTECTION SCHEMES-PHASE 1 (SEZAD)\10 PHYSICAL MODEL\DATA\REV01\ACAD\CWK_01 TO CWK_07 JURF DAM_ATL-1

    Consultancy Services for Feasibility Study, Detailed Design and Construction

    Supervision of the Duqm Development Drainage Network and Protection Schemes

    Phase 1

    PRILIMINARY DESIGN

    JURF DAM

    TYPICAL NON-OVERFLOW SECTION A _ALTERNATIVE-1

    CH

    AMY

    AMY

    BH

    1333-JURF-CWK-02

    AS SHOWN @ A1

    JULY 2014

    0